In this regulation:
Act means the School Act;
authority has the same meaning as in section 1 of the Hydro and Power Authority Act;
listed facility means a facility in Column 3 in the attached Schedule;
professional engineer means a person who is registered under the Professional Governance Act as a professional engineer or professional licensee engineering.
Hydroelectric power projects are approved alternative energy power projects for purposes of section 131.1 of the Act.
Subject to this regulation, the following are designated as eligible hydroelectric power projects for purposes of this regulation:
a newer run-of-river hydroelectric power project if the head pond storage capacity of the power project is no more than 24 hours of average annual flow;
a newer hydroelectric power project that is not a run-of-river hydroelectric power project described in paragraph (a).
A newer run-of-river hydroelectric power project under subsection (1) (a) or a newer hydroelectric power project under subsection (1) (b) is one that did not begin production of electricity before January 1, 2002.
intake facilities and trash racks;
tunnels and tunnel linings;
penstocks, penstock foundations and penstock support structures;
weirs and associated control structures.
intake facilities and trash racks;
tunnels and tunnel linings;
penstocks, penstock foundations and penstock support structures.
Nothing in subsection (2) provides a school tax exemption for a dam, a weir or any part of either.
the eligible hydroelectric power project is, as of October 31 in the year preceding the taxation year,
licensed to display the EcoLogo TM certified by Underwriters Laboratories, and
a current licensee in good standing with that program, as confirmed by the owner or a senior executive officer of the power project;
if the eligible hydroelectric power project is one referred to in section 3 (1) (a), a professional engineer has certified that, as of October 31 in the year preceding the taxation year, the head pond storage capacity of the power project is no more than 24 hours of average annual flow.
the power project has, as of October 31 in the year preceding the taxation year referred to in subsection (1), a contract with the authority to sell the authority power produced by the power project,
the contract referred to in paragraph (a) was made before January 1, 2005 and its term is no less than 10 years from the date it was made, and
a confirmation under subsection (1) (a) (ii) or (2) (c) must be
in writing,
made to the assessor of the assessment area in which the power project is located, and
made by November 30 in the year preceding the taxation year in which the exemption is to apply, and
a copy of a certificate under subsection (1) (b) must be provided
to the assessor of the assessment area in which the power project is located, and
by November 30 in the year preceding the taxation year in which the exemption is to apply.
Subsection (3) does not apply in respect of a listed facility.
In this section:
final determination under the Assessment Act means a determination on the assessment roll for a taxation year, subject to any change that is finally determined under the Assessment Act by revised assessment roll, by supplementary assessment roll or on further appeal;
first exempt taxation year means, in relation to an eligible hydroelectric power project referred to in section 3, the first taxation year in which the power project's improvements are, on a final determination under the Assessment Act, exempt under section 4 as a result of being a listed facility or of meeting the conditions set out in section 5 (1) (a) and (b).
Subject to this section, if on a final determination under the Assessment Act improvements of an eligible hydroelectric power project referred to in section 3 become exempt under section 4 as a result of being a listed facility or of meeting the conditions set out in section 5 (1) (a) and (b), the minister of revenue may, on application by the taxpayer, refund to the taxpayer school taxes paid by the taxpayer before the first exempt taxation year.
For purposes of subsection (2),
the refund is limited to those school taxes paid by the taxpayer in the 3 taxation years immediately preceding the first exempt taxation year.
An application for a school tax refund under this section may not be made more than 3 years after January 1 of the first exempt taxation year.
Repealed. [B.C. Reg. 69/2017.]
Repealed. [B.C. Reg. 69/2017.]
Schedule [en. B.C. Reg. 288/2021, s. 5.]