Majority
Headnote
Méchame? s lien—proof to controvert statements as to the cost-of repairs to plumbing work done by the claimant—proof that work not complying with the contract was preferable to that required, thereby and that the departure from the contract was not. material— manner of presentation to the court of the claim of a sub-contractoi\This is an action brought to foreclose a mechanic’s lien filed by the assignee of the contractor Manneschmidt. • The contract provided for furnishing plumbing work upon premises owned by the defendant Goodstein. There was also a lien filed by the defendant Deng for materials furnished and also by the Alberene Stone Company. Interest in the latter lien was assigned to Deng and he was made a party defendant in the action. These two liens amounted to about the sum of $1,364, with interest thereon. Ho question is raised but that the .materials represented by the liens owned by Deng were furnished to the building; that the defendant Goodstein received all the benefits arising therefrom ; that the materials thus furnished answered in all respects to the requirements of the contract and that Deng has not been paid therefor. The issue litigated upon the trial related solely to the performance by the contractor of his contract, it being claimed that he did not substantially perform the same, but, on the contrary, was guilty of a willful and fraudulent departure from the plans and specifications to such an extent and of so material a character that his assignee was not entitled to-enforce the lien. The particulars in which it was claimed that there was substantial departure from the terms of the contract were that he had substituted earthqn for iron sewer pipe; had failed to remove-rock obstruction in the street and thereby give a proper pitch .to the sewer, which resulted in flooding the basement and causing the same to become damp and unhealthy; that he. utilized old sewer-connections connected with buildings formerly standing upon the land, which had been torn down to make place for the new building; that he substituted one and one-half inch pipe for two-inch pipe- in the laundry tubs and sinks and furnished a thinner and inferior pipe in the" closet system All of the material which was the subject of contest upon the trial was-put into the building under the" supervision and direction of an' architect. After the completion of the plumbing work, involving-the disputed items, the architect gave to the contractor a certificate-that the work was completed in accordance with the terms of the-contract and that the contractor was entitled to payment therefor. Presumptively^ therefore, the plaintiff was entitled to enforce the-lien which he. had filed. He could only be defeated by establishing
The testimony was also conflicting as to the difference in cost, between the material for which the contract called and that which was substituted. Testimony upon the part of the defendant showed such difference to be a substantial sum, while the testimony on the part of the contractor showed it to be slight, and that the substituted material would perform its office as well and the earthen pipe better than that for which the contract called. In view of this condition ■of the proof, it is clear that a finding in favor of the plaintiff would have had abundant evidence to sustain it, and as the defendant Goodstein confessedly has had the full benefit of all of the material furnished to the building, he ought not to escape payment therefor, unless for a controlling reason. In view of this condition of the ■case, we are called upon to examine this record with care in order to see that nothing has happened in-the course of the trial to the
John Cadoo, an expert plumber, was called as a witness and among other things was asked if in his estimation pipe of fhe diameter of one and one-half inches was preferable under the laundry tubs to one of two inches; also, if he knew of any case where earthen pipe would he preferred over sewer pipe made of iron. The architect for the defendant Goodstein had testified that the pipe which was used was not as good as the other and gave reasons therefor. Counsel for the defendant Goodstein also cross-examined: the witnesses upon the part óf the plaintiff at considerable length bearing upon, such question. It was conceded by the defendant that the one and one-half inch pipe conformed to the regulations of the building
As to the second question, the plaintiff’s testimony tended to show that the sole reason for the change of the sewer pipe from iron to earthen was due to the condition of the soil, which rusted the iron pipe very rapidly and that it was for this reason that the earthen pipe was substituted, If it was the fact that from the conditions disclosed iron pipe would not be suitable, or as "good as the earthen pipe to be laid in that soil, the plaintiff had the right to show it, and if it had appeared that under such conditions earthen pipe would be the best to place in such soil, it would go far to corroborate the plaintiff in his claim that this change was authorized, as it would show a reason therefor and render probable his story. The evidence sought to be elicited was, therefore, directly corroborative of the plaintiff’s claim and it was, therefore, error to exclude testimony offered for such purpose. The substantive part of the whole claim upon the part of Goodstein rested in the substitution of the earthen pipe for the iron. Had such substitution been authorized, the plaintiff would doubtless have succeeded. The error, therefore, in excluding this testimony, which bore directly upon such issue, was material and was distinctly prejudicial to _the plaintiff.
It is said that the- defendant Deng is entitled to no relief upon this appeal for the reason that he did not move for judgment in his
Dissent
For reasons already assigned, we conclude that the judgment should be reversed and a new trial granted, with costs, to the appellant to abide the event.
O’Brien arid McLaughlin, JJ., concurred •, Van Brunt, P. J. and Ingraham, J., dissented.
- I think the evidence conclusively shows that the plaintiff never fulfilled his contract and was not entitled to recover the amount that the defendant Goodstein agreed to pay upon its performance. It is conceded that the plaintiff failed to comply with his contract. Goodstein had contracted for iron pipes and the plaintiff had agreed to furnish him with iron pipes. Whether the earthenware- pipes were just as good, Goodstein had a right to say that he' required iron pipes and would pay for nothing but iron pipes, and until the plaintiff complied with his contract and furnished iron pipes lie was not entitled to enforce payment of what was to be paid when iron pipes were furnished. It is not' disputed but that there was evidence to sustain the finding below that the plaintiff, had not complied with liis contract and that compliance, therewith was not waived by the defendant or his agent; and in view of that finding,
I, therefore, dissent.
Judgment reversed, new trial ordered, costs to appellants to abide event.