Majority
Ordered that the order is affirmed insofar as appealed and cross-appealed from, without costs or disbursements.
The plaintiffs Daniel Vitale (hereinafter the injured plaintiff), and his wife suing derivatively, commenced this action to recover damages for personal injuries sustained by the injured plaintiff while he was working at a construction site. The defendant Astoria Energy II, LLC, was the owner of the property, and the defendant SNC-Lavalin Constructors, Inc., was the construction manager for the project. At the time of the accident, the injured plaintiff was working as a surveyor at the site, verifying the accuracy of the location of approximately 200 anchor bolts, which needed to be tightened before the concrete foundation was poured. This required the injured plaintiff to walk from anchor bolt to anchor bolt, across the top of a rebar grid, which was at least 100 feet by 50 feet, and 5 feet high. The rebar grid had square openings, which measured at most 12 inches by 12 inches. The injured plaintiff allegedly was injured when, while walking across the top of the rebar grid, he lost his balance, and his left leg fell through one of the square openings of the rebar grid, up to his groin.
The plaintiffs moved for summary judgment on the issue of liability on the cause of action alleging a violation of Labor Law § 240 (1) and so much of the cause of action alleging a violation of Labor Law § 241 (6) as was predicated on 12 NYCRR 23-1.7 (b). The defendants cross-moved for summary judgment dismissing the complaint. The Supreme Court denied the plaintiff’s motion. Although the cross motion was untimely, the Supreme Court entertained those branches of the cross motion which were for summary judgment dismissing the cause of action alleging a violation of Labor Law § 240 (1) and so much
The Supreme Court properly granted that branch of the defendants’ cross motion which was for summary judgment dismissing the cause of action alleging a violation of Labor Law § 240 (1). The defendants established, prima facie, that the openings of the grid, which were not of a dimension that would have permitted the plaintiff’s body to completely fall through and land on the floor below, did not present an elevation-related hazard to which the protective devices enumerated in Labor Law § 240 (1) are designed to apply (see Keavey v New York State Dormitory Auth., 6 NY3d 859 , 860 [2006]; Avila v Plaza Constr. Corp., 73 AD3d 670 , 671 [2010], lv granted 15 NY3d 706 [2010]; Rice v Board of Educ. of City of N.Y., 302 AD2d 578 , 579-580 [2003]). In opposition, the plaintiffs failed to raise a triable issue of fact (see Alvarez v Prospect Hosp., 68 NY2d 320 , 324 [1986]).
The Supreme Court also properly granted that branch of the defendants’ cross motion which was for summary judgment dismissing so much of the cause of action alleging a violation of Labor Law § 241 (6) as was predicated on 12 NYCRR 23-1.7 (b). This Court has repeatedly held that 12 NYCRR 23-1.7, which concerns “hazardous openings,” does not apply to openings that are too small for a worker to completely fall through (see DeLiso v State of New York, 69 AD3d 786 , 787 [2010]; Rice v Board of Educ. of City of N.Y., 302 AD2d at 579 ; Alvia v Teman Elec. Contr., 287 AD2d 421 , 423 [2001]). As noted above, the defendants established that the openings of the grid were not of a dimension that would have permitted the plaintiff’s body to completely fall through. Accordingly, the defendants established their prima facie entitlement to judgment as a matter of law on that branch of their cross motion (see Alvarez v Prospect Hosp., 68 NY2d at 324 ). In opposition, the plaintiffs failed to raise a triable issue of fact (see id.).
The Supreme Court also properly denied the remainder of the defendants’ cross motion as untimely, since the defendants failed to demonstrate good cause for their delay in making the
Rivera, J.P., Balkin, Dickerson and Hinds-Radix, JJ., concur.
Cases cited
- Wernicki v. Knipper 119 AD3d 775 at 776 p. 983
- Keavey v. New York State Dormitory Authority 6 NY3d 859 at 860 p. 983
- Avila v. Plaza Construction Corp. 73 AD3d 670 at 671 p. 983
- Rice v. Board of Education 302 AD2d 578 at 579-580 p. 983
- Alvarez v. Prospect Hospital 68 NY2d 320 at 324 p. 983
- DeLiso v. State 69 AD3d 786 at 787 p. 983
- Alvia v. Teman Electrical Contracting, Inc. 287 AD2d 421 at 423 p. 983
- Paredes v. 1668 Realty Associates 110 AD3d 700 at 702 p. 984
- Vasquez v. C2 Development Corp. 105 AD3d 729 at 731 p. 984