AI-generated from this judgment's text. It can contain errors and is not the official version.
No AI brief yet. Click to generate.
Majority
Headnote
Order Denying New Trial—Appeal—Review of Findings—Bill of Exceptions.—On an appeal from an order denying a new trial, specifications in the bill of exceptions, that the conclusions of law embraced in the findings are erroneous, are not available. They can be reviewed, only on appeal from the judgment, or from an order made under sections 663 and 663% of the Code of Civil Procedure. Conclusions of law are superseded by the judgment.The plaintiff, claiming as an appropriator of water from a stream known as Mill Creek, sues to enjoin alleged injurious diversions from the stream. Judgment was given in the court below in favor of the defendants. The appeal is from an order denying the motion of plaintiff for a new trial. The trial took place in March or April, 1904. For some reason, not explained in the record, the findings were not filed until June, 1906, and the bill of exceptions was not settled until June 14, 1907.
It is not claimed that the findings do not cover all the material issues. There are no specifications of errors of law occurring at the trial. The specifications in the bill of exceptions, that the conclusions of law embraced in the findings are erroneous, are not available on appeal from an order denying a new trial. The conclusions of law are always merged in and superseded by the judgment (Roberts v. Hall, 147 Cal. 437 , [ 82 Pac. 66 ]), and, even if necessary thereto, they can be reviewed only on appeal from the judgment, or from an order made under sections 663 and 663% of the Code of Civil Procedure. (Swift v. Occidental etc. Co., 141 Cal. 165 , [ 74 Pac. 700 ]; Great Western G. Co. v. Chambers, 153 Cal. 310 , [ 95 Pac. 151 ]; Kaiser v. Dalto, 140 Cal. 167 , [ 73 Pac. 828 ].) We think, however, that the points urged
The complaint in substance is as follows: The plaintiff is, and has been ever since December 1, 1887, the owner of the right to take and use all the water flowing above and below the surface of the ground on and along a certain tract of one hundred and sixty acres of land at the lower end of Mill Creek, through which tract said creek flows. Mill Creek rises in the San Bernardino Mountains and flows westerly about twenty-five miles to the plaintiff’s land. The water of the creek consists' of a stream flowing on the surface in connection and contact with an underflow through the porous material composed of sand, gravel, and boulders with which the channel is filled. This material is kept saturated and the underflow is supplied by waters sinking into it from the surface stream. The plaintiff obtains said water from the underflow of the creek, on the land aforesaid, by means of a tunnel extending into said porous material, beneath the surface of the ground. At that point there was ordinarily no surface flow of the creek. Some additional water from the underflow of the creek was obtained from springs rising in the vicinity, and also by means of an open cut on said land across and into the bed of the creek. These waters were appropriated and used for irrigation and domestic use on other lands not contiguous to the stream.
After the plaintiff had acquired these water-rights, the defendant, Redlands Electric Light and Power Company, which we will hereinafter call the Power Company, acting in concert with the other defendants, some forty-eight in number, whom we will call the Ditch ■ Owners, made a dam in the creek, at a place about three miles above the plaintiff’s tunnel, by which dam they diverted all of the surface flow of the creek, and three hundred miner’s inches of the underflow thereof, into an impervious pipe, in which pipe they carried said waters down the canon some fourteen thousand feet to a power house, where it was used by the Power Company for generating electric power. After passing through this power plant, these waters were turned into a rock-lined ditch, some six hundred feet in length, from which they
It appears by the findings and evidence that for many years before the construction of the plaintiff’s tunnel, the Ditch Owners had diverted and used all waters of the creek usually flowing on the surface above the dam and that they had thereby acquired the paramount right to all of the surface flow reaching that point, to the extent off twenty-five hundred miner’s inches. This maximum amount was a flow seldom attained by the stream, except in times of floods from heavy storms. For all practical purposes they possessed the right to divert all of the water of the creek which, under natural conditions, would usually flow on the surface at their dam. But they had not acquired and did not possess any right to take at that point any part of the underflow in order to obtain the twenty-five hundred inches. This right of the Ditch Owners is not directly alleged in the complaint, but it is conceded by the plaintiff and no complaint is made on that account. The gravamen of the plaintiff’s action is the alleged interference by the defendants with the underflow, and the alleged diversion thereof into said pipe-line and by that means into said ditch at the Grafton dam, whereby it is prevented from reaching the gravel beds surrounding the plaintiff’s tunnel.
In this behalf it is alleged that the effect of the diversion of the three hundred inches of the underflow into the pipeline, and its discharge into the natural channel so near to • the Grafton dam, was to carry it swiftly to the dam and thence into the ditch, giving it no sufficient time to penetrate into the gravels below, and consequently to dry up and diminish the underflow that would otherwise pass beneath the surface at the Grafton dam and thence down under the creek-bed to the tunnel, cut, and springs from which plaintiff obtained its supply, whereby the plaintiff was deprived of the three hundred miner’s inches of the underflow to which it is entitled.
The Power Company, being the owner of the riparian land, has the full right to use the water in its natural course on its land for that purpose. It has also the right, if it is more convenient and effective so to do, to turn it out of its natural channel at the upper end of its possessions, carry it in an artificial channel over the land, use it for generating power thereon, and turn it back into the stream within its lands below, provided such interference with natural conditions does not unduly injure others who have rights in the water. (Gould on Waters, sec. 213; Farnham on Waters, sec. 495, p. 1645.) Hence, if this diversion of the water from the natural channel causes a diminution of the underflow which would otherwise go to plaintiff’s use, and an addition to that which naturally would go to the Ditch Owners, and the plaintiff’s rights under its appropriation are prior, in point of time, to the diversion by the pipe-line, we have little doubt that the plaintiff would be entitled to some relief. On behalf of the Power Company it is argued that this diversion on its riparian land is an exercise of its riparian rights, of which a prior appropriator below cannot be heard to complain. This may be admitted for argument’s sake so far as the Power Company is concerned, for it does not diminish the quantity of water, nor consume it, but turns it all back into the stream above the lower boundary of its land. But it is alleged that the Power Company and the Ditch Owners, by this method of carrying the water, have taken up part of the underflow which would naturally have gone to plaintiff’s use and have caused it to run into the ditch at the Grafton dam as an artificial increase of the surface stream going to the Ditch Owners. If this were true, the plaintiff might, at least, be entitled, as against the Ditch Owners, to have this artificial increase of the surface stream delivered to it at the Grafton dam, or at that point turned into the natural channel below the dam, where it might sink into the gravels and feed the plaintiff’s source of supply. It is unnecessary
The plaintiff insists that the court has found that the Ditch Owners, in order to obtain the maximum flow of twenty-five hundred miner’s inches, to which they are entitled, have the right to take up all' of the underflow, at the dam or elsewhere, if necessary, and has decided that this contingent right to the underflow is paramount to the right of the plaintiff to have the underflow pass under the dam for its use. One paragraph of the findings states that, by reason of the porous character of its bed, some of the water of Mill Creek sinks below the surface of the ground and forms a subterranean stream, in addition to the surface flow and in direct contact with it. At ahother place the findings state that the Ditch Owners are entitled to take and use “all of the flow of the said Mill Creek, to the extent of 2500 inches of water,” miner’s measurement. These findings, if considered together, but apart from the context, are somewhat ambiguous and might be understood to give the Ditch Owners a right to take out at their dam the underflow there running as well as the surface stream. But when considered in connection with the other parts of the findings and with the pleadings and judgment, we think it is clear that the court intended to refer only to the surface flow by the phrase “all of the flow of the said Mill Creek” in the foregoing passage. Any other construction would make this finding contrary to all the evidence and to the repeated concessions of both parties throughout the trial. There was no contention, or attempt to prove, that the Ditch Owners ever had, or ever claimed to have, the right to take any water other than the entire stream flowing on the surface of the ground at the Grafton dam, or that they ever claimed the right to take at that point any of the water there flowing beneath the surface in the interstices of the porous material. The contention that this finding is contrary to the evidence would be well taken if the finding could properly be construed to include such underflow, but it is without foundation when the finding is given its true meaning as referring solely to the surface stream there flowing.
The main question of fact in the case arises upon those findings which involve the right of the defendants to maintain the diversion through the pipe-line, and the effect of that diversion upon the amount of underflow going to plaintiff’s tunnel, cut, and springs. The court found, in effect, that the subterranean water diverted and carried down the canon in said pipe-line and by that means mingled with the natural surface flow and turned into the defendants’ ditch at the Crafton dam, did not constitute any part of the subterranean waters which would naturally flow to and feed the plaintiff’s source of supply, and that the interference with natural conditions did not operate to diminish plaintiff’s supply. If this is true, the diversion by means of the pipe-line would cause no damage to plaintiff. The court, accordingly, expressly found that the plaintiff was not damaged by the acts of the defendants.
We think these findings are supported by sufficient evidence. There was evidence to the effect that although the diversion of all the surface and subterranean flow into the pipe-line at the upper dam caused the surface stream to disappear in the natural creek-bed from that place of diversion down to the point where the water was again returned from the pipe-line to the natural bed, a few hundred feet above the Crafton dam, there was, nevertheless, enough water from other sources coming into the creek-bed and into the channel below the head of the pipe-line and above the Crafton dam, to fill all the porous material of the canon at that dam to overflowing, thereby contributing some water to the surface stream, with the result that there was more water in the surface stream at the Crafton dam than was discharged from the pipe-line.
The grade of the bed of the creek is very steep, being about two hundred and fifty feet per mile, and from this fact the plaintiff argues that if the creek-bed above were kept filled for its whole length, there would be more pressure and the underflow would pass under the Grafton dam with greater velocity, and, consequently, in greater quantity, than when filled only for a short distance above the dam. This is, perhaps, a problem in the science of hydraulic engineering. The experts in that science, or some of them, who testified at the trial, declared that no such effect would follow, and if such evidence is competent this would be sufficient to support the
The evidence also showed that the plaintiff’s supply absolutely ceased for several years, and this, it is claimed, demonstrates the injury arising from the pipe-line. But this failure is accounted for by the fact that it occurred during an ex
The conclusion we have reached as to the sufficiency of the evidence to support these findings renders the other findings immaterial. If the acts of the defendants do not damage the plaintiff and do not diminish the water which would naturally flow to its place of diversion, it is immaterial whether the pipe-line diversion was made before or after the inception of the plaintiff’s appropriation, or whether the place where the water was turned back into the natural channel of the creek was, as the findings state, one thousand feet above the Grafton dam, or less than that distance. We find no ground upon which it can be said that there is not sufficient evidence to support the findings.
The order is affirmed.
Angellotti, J., and Sloss, J., concurred.
Cases cited
- Kaiser v. Dalto 140 Cal. 167 p. 324
- Gould v. Eaton 111 Cal. 639 p. 327
- Barker v. Gould 122 Cal. 240 p. 331