Majority
Headnote
Street Improvement—Sewer Work—Validity of Contract—Provision for Concrete Foundation in Judgment of City Engineer. —A contract for sewer work entered into by a municipality, in which the amount and character of material to be used is impossible of accurate predetermination, is not invalidated by reason of a provision in the specifications that if, in the judgment of the city engineer, it shall he necessary to form any portion of the foundation of the sewer of concrete, said concrete shall be paid for as extra work at the price per cubic yard mentioned in the contract.This is an action to foreclose liens upon an assessment for sewer work. Judgment passed for the plaintiff:, and the defendant property-owner appeals.
1. The specifications for the work provided that “if, in the judgment of the city engineer, it shall be necessary to form any portion of said foundation (of the sewer) of concrete, said concrete shall be paid for as extra work at the price per cubic yard mentioned in the contract.” This language forms the foundation of the principal attack made by appellant. He insists that, under the authority of Bolton v. Gilleran, 105 Cal. 244 , [ 45 Am. St. Rep. 33 , 38 Pac. 881 ], and Perine v. Pasadena, 116 Cal. 6 , [ 47 Pac. 777 ], there is by these words conferred upon the city engineer the discretionary power at will to increase or decrease the cost of the work to the property-owner, and that a contract which so permits is void. The underlying principle in Bolton v. Gilleran is indubitably sound, and that is, that where the nature of the work permits a predetermination of its actual cost, such predetermination shall be made by the council in awarding the contract, and no improper discretionary power shall be left with the street superintendent or city engineer whereby such cost may either be increased to the injury of the property-owner, or diminished to the benefit of the contractor. This is usually possible, in that class of work known generally as street work. It is difficult, if not practically impossible, to enforce such a condition where the work is the construction of a sewer, or the driving of a tunnel. Bolton v. Gilleran has been seized upon by property-owners and used in every possible way to defeat
In awarding a contract for street work it is quite apparent, since the surface of the ground is exposed, that there may be an accurate predetermination of the amount and character of material to be used. It is unnecessary, therefore, to delegate any discretion in this matter to the street superintendent. Such was the condition in Perine v. City of Pasadena, 116 Cal. 6 , [ 47 Pac. 777 ], (a street work ease), where the specifications required that “the contractor shall put in such extra concrete as the superintendent of streets and the city engineer may require, and in such places and in such form as they may designate.” It was easily susceptible of predetermination upon the part of the council whether any extra concrete was required at all, and, if so, the quantity and the place of use. This delegation, therefore, was held to be unreasonable. But where, as here, the work is the construction of a sewer, involving: 1. The digging of the trench, and 2. The placing of the sewer upon a durable foundation, it is apparent that but one of three courses can be pursued in the
2. Objection is made that the specifications provided that the city engineer, and not the superintendent of streets, should determine whether any, and, if so, how much, concrete should be used for the artificial foundation. But the contract provides that the work shall be done under the direction and to the satisfaction of the street superintendent, thus following the provisions of the Vrooman Act, and the city engineer, under charter amendment No. 7 of the charter of Santa Barbara (Stats. 1905, p. 937), is required “to make all surface inspections and estimates required by the council.” It was therefore not improper to delegate this discretion to the city engineer. After the exercise of the city engineer’s discretion in the matter, the work must still be inspected and app'roved and the assessment issued by the street superintendent.
3. Under the views above expressed it matters not that the court refused to strike out the allegation of the complaint to the effect that no extra concrete for foundation was in fact used.
5. It is complained that the posted notices of intention were not such as the law contemplates. Herein it is not contended that they did not contain all that the law required, but the somewhat singular contention is made that they contain more than the law required, in that the resolution of intention was printed in full, instead of being given in substance, with a reference to the resolution “for further particulars.” Something also is urged as to the smallness of the type in which the body of the notice was printed.
A copy of the notice is inserted in the transcript. It is sufficiently legible, and the property-owner cannot be heard to complain with justness because the notice itself conveys to him more information than the law requires that it should.
Defendant was the owner of all of the lots against which the liens were sought to be enforced in a single action. While the method of procedure is permissible under section 12 of the Yrooman Act, yet a single attorney’s fee only can be recovered in such an action. (Hughes v. Alsip, 112 Cal. 587 , [ 44 Pac. 1027 ].)
The judgment is modified by striking therefrom all but one award for attorney’s fees and costs, and, as so modified, the judgment and the order appealed from will stand affirmed.
Shaw, J., Lorigan, J., Angellotti, J., Sloss, J., Melvin, J., and Beatty, C. J., concurred.
Rehearing denied.
Cases cited
- Bolton v. Gilleran 105 Cal. 244 p. 205, p. 209
- N. P. Contracting & Paving Co. v. City of Pasadena 116 Cal. 6 p. 205, p. 206
- Haughawout v. Raymond 148 Cal. 311 at 312 p. 206
- Haughawout v. Hubbard 131 Cal. 675 p. 208
- Belser v. Allman 134 Cal. 399 p. 208
- Chase v. Scheerer 136 Cal. 248 p. 209
- Hughes v. Alsip 112 Cal. 587 p. 210