Majority
Headnote
Contract .— Bules of Construction — Intent of Parties. — In construing a contract the basic rule is to be adopted that each clause is to be considered with reference to every other clause upon which it has any bearing, and all the clauses and provisions are to be construed together as the unified medium whereby the intent of the parties to the instrument is to be reached.This is an appeal by plaintiff from a judgment entered against him after demurrer sustained to his amended complaint.
Kate W. Dobbins is made a party defendant under an allegation that she is a proper party plaintiff who refused to join with plaintiff as such and hence is made a defendant. No relief is asked against her, the real parties to the action being the plaintiff and the defendant I. N. Van Nuys.
The complaint alleged the making of a contract, or water deed, on June 3, 1880, between James Foord of the first part and William H. Stephens, Kate W. Dobbins, Henry P. Tallant,
It provided that in consideration of certain amounts of money which had been paid by the parties of the second part to the agreement, to said Foord (Stephens, $2000; Kate W. Dobbins $1714.28, and Tallant and Owen jointly $2285.73) “the said Foord does hereby grant, bargain, sell, and convey to the said parties of the second part, to be owned and held and enjoyed by them in proportion to their said respective payments and to their heirs, representatives, and assigns forever, all the water now flowing and hereafter to flow from three wells located on said grantor Foord’s land in said county and hereinafter described (5 acres) the said wells being each found by driving into the ground an iron pipe of seven inches in diameter. Also the full and perfect right to conduct the water from said wells by means of pipes which shall be inserted into the said wells at a point not less than two feet nor more than three feet below the surface of the groirnd immediately around such well, and which conducting pipes shall be so inserted or attached as not to interfere with the free use of a sand pump in said wells, and as not to create a siphon.”
Then follow provisions granting the right to the second parties to conduct their water-pipes to their tracts of land through the land of Foord, but at their own expense, and other provisions regarding said pipes, their repair and removal at the expense of the grantees all immaterial to the question of the construction of the contract here involved, so far as requiring any detailed statement.
It is then further provided in the contract that: “The grantor stipulates and covenants that the total quantity of water flowing from said three wells measures at this date more than 110,000 gallons in each successive twenty-four hours (measured by cubic feet and the gallon estimated at 231 cubic inches) and for himself, his heirs, representatives, and assigns, he covenants and agrees with the grantees, their heirs, representatives, and assigns, that if at any time or times hereafter the water flowing from said wells shall so decrease as to measure less than 105,000 gallons in each period of twenty-four hours and shall so continue for a period of thirty days, he and his said heirs, representatives,' and assigns shall and will from the water rising or flowing from or upon said five acres, or
Foord then covenants that all the property interests and rights conveyed to the parties of the second part and stipulations in their favor shall survive and pass to their heirs, representatives, and assigns; that the covenants and stipulations shall run with the said five acres of land and are declared a burden thereon and in whomsoever’s hands the same may come, and that all persons who take said five acres, or any part thereof, shall be held personally responsible to the extent of the value of said five acres herein charged with the performance of all the covenants and stipulations made in favor of the parties of the second part. Then follows a description of the five acres of land, referred to as wholly swamp, with a particular description by monuments and distances of the exact location on the tract of the three wells mentioned in the contract or deed, followed by a final provision therein that the parties of the second part mentioned as grantees shall take as between themselves, their proper interests as tenants in common and not as partners, and in proportion to their said payments—Stephens seven twenty-first parts, Dobbins six twenty-first parts, and Tallant and Owen the remaining eight twenty-first parts.
The complaint after alleging that the contract above referred to was duly acknowledged by the parties thereto and recorded, proceeds to allege that plaintiff is, and for more than four years has been, the assignee of the interest therein reserved to said Henry P. Tallant and V. S. Owen, and to six seventeenths of the interest of said Kate W. Dobbins who still owns the remainder of her interest under said contract; that said defendant Van Nuys for more than four years last past has been the owner of the five-acre tract described in the contract as successor in interest of said James Foord, and has also acquired the interest reserved under the contract to said Wm. H. Stephens, and the whole of the latter has been merged into the fee; that the flow of the three wells mentioned in the contract gradually diminished and more than four years ago practically ceased; that plaintiff without objection from defendant up to a year last past made efforts to restore said flow by deepening said wells and by the use of a siphon, but without success; that beneath the surface of said five acres and reach
It is then alleged that plaintiff has expended a thousand dollars and upwards in attempting to obtain water due under said contract and a further sum of twelve hundred dollars in purchasing water elsewhere to supply his needs, and that by reason of lack of sufficient water his trees and crops have been damaged in the last four years to the extent of a thousand dollars and upwards; that all these damages accrued through the neglect and failure of the defendant Van Nuys to secure water upon said five acres by pumping in accordance with said contract, or to deliver water already secured by him through pumping.
The prayer of the complaint is for damages in the sum of thirty-two hundred dollars and a judgment that defendant Van Nuys be ordered to forthwith install and operate a pumping plant or plants upon said five acres sufficient to develop water to supply plaintiff with the proportion of water due him under the aforesaid contract, or to supply him with water from the pumping plants already installed, and that if defendant fails to comply with said order, a receiver be ap
The defendant demurred generally and specifically to the complaint. The demurrer was sustained and plaintiff declining to amend and electing to stand upon his pleading, the judgment from which he appeals was entered against him.
The only point involved on this appeal is the proper construction to be given to the contract, or water deed, upon which plaintiff bases his right of action, and this narrows down to what was the nature of the “development” of the water which Foord and his successors in interest agreed to make in order to keep the flow of water for the benefit of the grantees up to one hundred and ten thousand gallons at any time when the water flowing from said three wells so decreased as to measure a flow of less than one hundred and five thousand gallons.
In the contract Foord is uniformly designated as the grantor and the several parties who are given proportionate rights to the water mentioned therein are designated as the grantees, and these terms will be used by us in discussing the rights of the parties under the contract.
It is insisted on the part of appellant that by the terms of the contract Foord conveyed to the grantees, and covenanted to deliver to them, a specific quantity of one hundred and ten thousand gallons of water; that while it was provided in the first instance the supply should be furnished from the three wells then existing upon the five-acre tract, it was contemplated by the parties thereto that the flow therefrom might at some time diminish and in contemplation of this possibility Foord covenanted and agreed that if the quantity decreased to less than one hundred and five thousand gallons during a period of thirty days that he would “from the water rising or flowing from or upon said five acres, or that can be developed or obtained from said five acres” immediately at his own expense “increase the stream of water for the grantees to the flow of 110,000 gallons ... so as to deliver them the quantity stipulated for”; that this contract to supply the decrease in the stipulated quantity from “water that can be developed or obtained from said five acres” is to be construed as a covenant
In construing a contract the basic rule is to be adopted that each clause is to be considered with reference to every other clause upon which it has any bearing, and all the clauses and provisions are to be construed together as the unified medium whereby the intent of the parties to the instrument is to be reached, and this rule is to be applied here.
Appellant, as we have said, insists that under the grant from Foord there was conveyed to the grantees a specific quantity of water amounting to one hundred and ten thousand gallons during each twenty-four hours. This, however, is cer- . tainly not the fact as far as the operative part of the conveyance—the granting clause is concerned;'no specific quantity is there mentioned, the amount being of all the waters of the three wells “now flowing or hereafter to flow” therefrom. Under this granting clause the grantees were entitled to no specific quantity of water; they were entitled to all the waters flowing therefrom whether the flow amounted to less than one hundred and ten thousand gallons or exceeded it.
In this connection, too, it is to be noticed as bearing materially on the construction to be placed on subsequent provisions of the contract that these wells were artesian wells. It is evident, not only from the use of the term “water now flowing or to flow” from the wells, but also from the manner in which the supply pipes of the grantees were to be connected with them—three feet below the surface—and this was the only method provided for obtaining the water.
Now, while it is clear that there is no conveyance of any specific quantity of water in the granting clause of the contract
Now as to the means which were to be employed by the grantor to provide the grantee with this quantity of water.
Appellant insists that it is a matter of common knowledge that the flow from wells and springs may not be permanent and as the five-acre tract contained a non-failing supply of water which, if it ceased to run by gravity or natural pressure,
There would be much force in the position of appellant if, after granting all the waters flowing from the three wells, there was nothing further in the contract than an agreement that if these wells failed to supply one hundred and ten thousand gallons, that the grantor would “from the water rising or flowing from or upon said five acres, or that can be developed or obtained from said five acres, immediately at his own expense” increase the stream of water for the grantees to a flow of one hundred and ten thousand gallons.
The difficulty, however, in giving to these terms of the agreement the broad signification sought by appellant is found in subsequent provisions of the contract immediately following the clause above referred to defining just how the water to keep up a supply of one hundred and ten thousand gallons is “to be developed and obtained.” In the first subsequent proviso it is declared that the grantors shall not be obliged to furnish the grantees more than one'third of all the water that “may be flowing on or from said five acres or that can be developed or obtained by putting down as many wells as can be safely made ... to a depth of from twenty to fifty foot, at least one of said wells to be fifty feet deep.'”
Here the provision defines exactly how the water shall be developed and obtained; it is to be by the sinking of a number of shallow wells and by this means only. The parties evidently contemplated that as the wells already sunk and the waters of which the grantees were entitled, were of artesian flow, that in case of a decrease in their supply, other wells sunk on the tract would likewise produce an artesian flow. As such a result would be obtained by simply sinking wells to open the artesian flow, this affords an all sufficient reason why nothing was said
And that it was in contemplation of the parties that the sinking of these wells by the grantor would supply an artesian flow and that such sinking alone was to be the maximum work to be done by the grantor at his own expense, is very evident from the next following provision of the contract. This provision referred to was inserted on the theory that the sinking of the shallow wells might not produce an artesian flow so it was there provided that if after sinking them sufficient water was not developed to furnish the grantees with one hundred and ten thousand gallons, then the grantees might demand that one or more of the wells on the tract should be so deepened so as to obtain such supply for the grantees, the expense thereof to be borne by the grantor and the grantees in certain proportions. All that is required on the part of the grantor by the terms of the contract is the sinking of wells or the deepening thereof, and as to the last provision the only purpose of deepening the wells would be to obtain an artesian flow thereby. There is no suggestion in or inference to be drawn from any of these provisions that any artificial means to supply water was contemplated or provided for. What the parties had.in mind when the contract speaks of water to “be developed or obtained” in the event the artesian flow in the three wells should decrease beyond a given quantity was the obtaining of an artesian supply by sinking other wells or deepening those that had been sunk. It is impossible to explain the entire .absence in the contract of any mention of the use or employment of artificial means to furnish grantees water from the wells to be sunk or deepened, upon any other ground than that an artesian flow was all that was contemplated to be obtained by the particular means which it was provided that the grantor should adopt to secure the supply.
But as further confirming the fact that the parties were relying for the supply of water under the contract upon the development of an artesian flow by the sinking of the shallow additional wells or the deepening of them, is the fact that if the establishing of a pumping plant for the purpose was in contemplation by the parties no provision is made in the contract for the expense of installing, operating, and maintaining it.
There is nothing in Garvey Water Co. v. Huntington etc. Imp. Co., 154 Cal. 232 , [ 97 Pac. 428 ], relied on by appellant which requires a different construction of the contract here under consideration. The contract in the Garvey case and the contract here are essentially different. In the Garvey case the Shorbs, owners of the Shorb Ranch, granted to Garvey a first or prior right to a full, uninterrupted, and perpetual flow of thirty inches of any water then or thereafter to be developed or flowing upon or from their lands. It was expressly covenanted that they did not warrant a continuance of the flow of thirty inches, but they did covenant that water was on the land and that it was their intention to continue to develop the flow therefrom, reserving the privilege of doing so by boring wells and driving tunnels and such other means as engineering skill might suggest; they further stipulated that if the flow of water then or thereafter developed upon the land should decrease so that Garvey should not receive the quantity granted that Shorb at the expense of Garvey would “do or perform such work towards restoring the flow of water as any competent engineer” that Garvey might select “shall direct to be done,” the necessary money “to carry on such work of development” to be advanced by Garvey. It was held that under the last provision of the contract the installment of a pumping plant for the restoration of the supply of water from one of the artesian wells from which Garvey had been getting his specific quantity of water was “development work” within the meaning of the contract. There can be no question but that pumping is a means for the development of water and that as the Shorbs had agreed to do “such other work” as an engineer might determine would restore the development of the waters which Garvey was to receive, the determination of the engineer that a pumping plant should be installed for that purpose we held was in the contemplation of the parties “development
Under this construction of the contract between the parties the complaint stated no cause of action against the defendant thereunder, and, hence, the demurrer was properly sustained.
The judgment and order appealed from are affirmed.
Melvin, J., and Henshaw, J., concurred.