Majority
Headnote
Waters and Water Eights — Watercourse Defined—Runoff from .Annual Rains and Snow Plowing in Defined Stream.—Water consisting of the runoff from the usual and annually recurring fall of rain and snow, draining from the surrounding hills into and through a canyon, in a well-defined channel, constitutes a watercourse, to which a riparian owner’s 'rights attach.The defendant has for many years maintained a reservoir in Round Valley, Plumas County, impounding water by means of a dam at the head of North Canyon, a narrow ravine leading from the northerly end of the valley. Sales of water so stored have been made from time to time to consumers at various points below the dam. When this action was commenced the plaintiff was in possession, under the then owner, of certain mining property situate in North Canyon, a short distance below the defendant’s dam. Pending the suit, plaintiff has acquired title to such property.
The action was brought upon the theory that plaintiff’s land was riparian to a natural stream running through North Canyon, and that defendant was controlling water impounded by its dam in such manner as to invade plaintiff’s riparian rights. Judgment was entered in favor of the defendant, and the plaintiff appeals.
It will not be necessary, for present purposes, to recite the allegations of the pleadings, or to refer to any of the findings, except those which are made the basis of attack by the appellant. These findings are, in effect, that there is no stream or watercourse in North Canyon, as alleged by the plaintiff; and that defendant and its predecessor have for more than forty years last past continuously applied all of the water in the reservoir to useful and beneficial purposes.
There is little conflict in the evidence. It appears that the reservoir site covers some four hundred acres. The country is mountainous, the surface of the reservoir being at an elevation of over four thousand feet. The fall of rain and snow on the surrounding hills drains naturally into Round Valley. Whether or not this water reaches the valley through well-defined streams—on this there is some conflict in the testimony—the record leaves no room for doubt that, before any dam was constructed, there was, in the winter and spring of each year, a discharge of a stream of water from the northerly end of the valley into and through North Canyon. This stream was of the character familiar in this state, and in
A dam was first built across the mouth of North Canyon in 1861 or 1862. It was washed out soon after, and another, constructed to replace it, was also carried away. Thereafter a third dam was built by Judkins and Kellogg for the purpose of storing water for sale to mines in the vicinity. In
The plaintiff went into possession of the property now owned by him some months before the commencement of the action. At first he took water from the defendant, paying the regular rates therefor. Thereafter he refused further payment, and the resulting controversy finally culminated in the institution of this action, in which he sought, among other things, an injunction restraining the defendant from cutting off the flow of water to his mining property.
About 1883 the defendant had strengthened and enlarged the dam, thereby increasing the storage capacity of its reservoir. It was then serving water to a considerable number of mines, and their requirements were such as to fairly consume the flow which the reservoir could furnish. This state of facts continued, as is conceded by the appellant in its brief, for a sufficiently long-period to give the defendant “an appropriative right to all the water draining from the Bound Valley watershed to the full extent of the capacity of the reservoir.” The appellant further admits, as, under the concession just quoted, he necessarily must, that the defendant’s diversion and impounding of the water was at one time under a right paramount to the rights of the plaintiff as a riparian proprietor on North Canyon. The sole contention in this regard is that the defendant has, by failing for five years to apply the whole of the water .so impounded by it to a useful and beneficial purpose, lost the right it once owned and enjoyed. Section 1411 of the Civil Code provides that “the appropriation must be for some useful or beneficial pur
The section does not prescribe any length of time during which the nonuser must continue, but in Smith v. Hawkins the court, applying the analogy of the statutes relating to adverse possession and prescription, laid down the rule that the right was lost by a failure, for a period of five years, to apply the water to a useful or beneficial purpose. On a second appeal in the same case the court restated the doctrine, and extended its application to a partial failure to apply water to a beneficial use, declaring that the appropriator could hold, as against one subsequent in right, 1 ‘ only the maximum quantity of water which he shall have devoted to a beneficial use at some time within the period by which his right would otherwise be barred for nonuser.” (Smith v. Hawkins, 120 Cal. 86 , [ 52 Pac. 139 ].)
The theory underlying section 1411, as intrepreted in these cases, is thus explained in the decision on the first appeal in Smith v. Hawkins: “Considering the necessity of water in the industrial affairs of this state, it would be a most mischievous perpetuity which, would allow one who has made an appropriation of a stream to retain indefinitely, as against other appropriators, a right to the water therein, while failing to apply the same to some useful or beneficial purpose.” ( 110 Cal. 127 , [ 42 Pac. 454 ].) The reasoning is as applicable to the situation of the parties in this case as it was to that of the opposing claimants in Smith v. Hawkins. There, as here, a valid appropriation had been made while the land below the point of diversion was still a part of the public domain. There, as here, a part of that land, bordering on the stream, had passed into the ownership of one claiming a superior right in the flow as against the prior appropriator
The evidence in this case fairly shows that for a period of more than five years before the commencement of the action the defendant had not applied to beneficial uses all of the water so impounded by its dam and reservoir. While there is some suggestion in the evidence that the defendant supplied water for irrigation, as well as for mining purposes, the record indicates very clearly that the service of water for irrigation was too trifling to be worth considering. Substantially the sole use was for mining purposes. As we have said above, this use was at one time sufficient to call for the entire capacity of defendant’s works. But from about 1890 there was a marked decrease in the number of mines supplied by the defendant. Some of the mines were closed, and the demand on the defendant for water became and remained much less than it had been. The testimony elicited from defendant’s own witnesses shows, without substantial conflict, that for many years the Round Valley Water Company had been selling considerably less than the amount of water which, on
In so far as the right to any of the water had been forfeited by nonuser, the plaintiff would be entitled to have the amount so forfeited flow down the stream in its accustomed course. This does not mean that the plaintiff may claim any benefit from the maintaining by the defendant of its dam and reservoir. He is not in a position to demand that the defendant shall, by its artificial works, furnish a constant flow of water in North Canyon throughout the year. His only rights are those which he would have had under the natural conditions existing before the dam was erected, subject to the deduction of so much of the water as defendant has continuously applied to a beneficial use. In other words, he cannot require the defendant to discharge any water into the stream during those months in which there would be no flow if no dam had ever been built. He may merely insist that, during the months of natural flow, the defendant shall permit the escape into the canyon of the surplus of the natural flow over and above what is required to enable the defendant to meet its reasonable needs, measured by its maximum requirements during the five years preceding the commencement of the action.
The respondent contends that a certain deed made to the defendant by plaintiff’s predecessors in interest granted, at least by necessary implication, the right to maintain the dam
The judgment is reversed.
Shaw, J., and Richards, J., pro tern., concurred.
Hearing in Bank denied.
Cases cited
- Lux v. Haggin 69 Cal. 255 at 417, 418 p. 453
- Spangler v. City of San Francisco 84 Cal. 12 p. 453
- Los Angeles Cemetery Ass'n v. City of Los Angeles 103 Cal. 461 p. 453
- Huffner v. Sawday 153 Cal. 86 p. 453
- Gallatin v. Corning Irrigation Co. 163 Cal. 405 p. 453
- Smith v. Hawkins 110 Cal. 122 p. 455
- Smith v. Hawkins 120 Cal. 86 p. 455