Majority
Plaintiffs, Acadia, California, Ltd., and Anthony Burke, brought this action for damages and for declaratory and injunctive relief, alleging that defendant had ceased to comply with two agreements under which he was obligated to supply them with water essential to the use of
The two agreements were made in connection with sales of parts of a 40-acre tract of desert land which was uninhabitable without water. In 1946 the owners, ¡Raymond Hatton and his wife, drilled a well and installed facilities for the pumping, storage, and distribution of water. The first agreement was made in 1949 when a portion of the tract, containing over an acre, was sold by the Hattons to predecessors of Acadia. In 1951 this parcel and the rights under the agreement were acquired by W. B. Milner and his wife, who transferred them to Acadia, a corporation wholly owned by the Milners. The second agreement was made in 1951 when a smaller parcel was purchased by plaintiff Burke. The Hattons thereafter sold the land which contained the well (apparently all the remainder of the acreage) to defendant, who assumed their obligations under the agreements.
It was provided in the agreements that water was to be supplied at gravity to each of the grantees for a certain monthly rental in such quantities as would be required for domestic use, including watering of gardens, but not to exceed “1/50 of such water as may be available from the existing water well” or any new well to be drilled by the grantor if the existing well became inoperative.[1] One of the disputed
1 The material provisions of the agreements, which are substantially the same in both contracts, are here quoted from the Acadia agreement: “(1) Grantors agree and hereby undertake to furnish to the Grantees such water as may be necessary for domestic use consisting generally of the usual household and domestic uses and the adequate watering of ornamental plants, trees and shrubs, and household garden plots connected with the use, occupancy and development of the property of the Grantees hereinabove described as a residence, but not for any industrial, commercial or general agricultural purposes, and in no event to exceed 1/50 of such water as may be available from the existing water well on the real property hereinabove described, or any replacement well in lieu of the existing well as hereinafter provided for. (2) It is contemplated by the parties hereto that said portions of the said available water, not to exceed 1/50 thereof, will be adequate for the uses hereinabove permitted by the Grantors, but Grantors make no guarantee concerning the quantity of water agreed to be furnished, or concerning the continuing availability thereof, except *333 as hereinafter set forth. (3) Grantors agree and hereby undertake to maintain at their own expense the existing water well without representation as to the quantity of water therefrom, and further agree at their own expense to install such pipe lines, tanks and other facilities for the delivery of water to the premises of Grantees, as may be deemed reasonably necessary to supply to Grantees the amount of water herein undertaken to be supplied by the Grantors to the Grantees. The Grantors further agree at their own cost and expense, to maintain and operate the said facilities so long as it is reasonably possible to procure and distribute water from the water underlying the land of the Grantors. The Grantors further agree that should the existing well, for unforeseeable reasons sand up or become inoperative, and should it be reasonably possible in the opinion of water experts to drill a new producing well in lieu thereof, that the Grantors will, at their own cost and expense, drill such other well and place it in operation, if reasonably possible, in lieu of the existing well, and further at the Grantors’ own cost and expense to install pipe lines, tanks and other facilities from said substitute well for the delivery of water to the premises of the Grantees. (4) The Grantees agree to pay to the Grantors for the water hereinabove agreed to be furnished, the sum of $7.50 per month during the first year during which said water is being furnished, and such additional sums as may be reasonable and proper considering any increase in operating expense of the Grantors, for such further year or years beyond the first year. . . . (5) Grantees further agree to receive said water at gravity at the property line of the Grantees and to make such provision for the transportation and use thereof upon the premises of the Grantees as the Grantees may desire in accordance with the permitted uses of this agreement and solely at Grantees’ expense.” The Burke agreement differs from the one quoted above in that the amount of water rental provided for in section (4) is $5.00 per month instead of $7.50.
The Hattons delivered water for irrigation at gravity, but they supplied water for household purposes under pressure, using a 500-gallon pressure tank and pipe lines, and this practice was continued by defendant. Early in 1953 plaintiffs expressed dissatisfaction with defendant’s delivery of water, particularly with the pressure under which household water was supplied. As a result of negotiations, an additional 500-gallon pressure tank was installed on defendant’s land, and the amount of the costs paid by him was provided by Milner as a prepayment of water rentals on behalf of Acadia. When the new installation was put into use the water pressure was improved, and delivery under increased pressure was continued for approximately two years.
In March 1955, after defendant started to subdivide his property and had built three new homes which he wished to provide with water from the well, he closed the pipe through
As we have seen, one of the disputed questions concerns the method of measuring the amount of water to which plaintiffs were entitled under the agreements. In this connection the court instructed the jury that each of the plaintiffs was entitled to the quantity of water reasonably necessary for domestic use, including watering of gardens, but not to exceed “1/50 of such water as may be available from the existing water well” and that the quoted phrase meant 1/50 of the amount of water that the well could produce when operated at full capacity.
When the various provisions of the agreements are considered together, it appears that the meaning of the quoted phrase is the one adopted by the court and that there was no issue relating to construction to submit to the jury. The pump in use, the capacity of which, according to defendant, was determinative of plaintiffs’ rights, is nowhere mentioned in either of the agreements, and several provisions show that, if necessary, the grantees were to be supplied with water by means other than those existing at the time of the agreements. The phrase under consideration was immediately followed by the words " or any replacement well in lieu of the existing well as hereinafter provided for.” The agreements provided further that the grantors would install "pipe lines, tanks and other facilities” reasonably necessary to supply the agreed amount of water, that they would operate those facilities "so long as it is reasonably possible to procure and distribute water from the water underlying the land of the Grantors,” and that, if reasonably possible, they would drill a new well and install the necessary facilities if the existing well became inoperative. (Agreements, § (3).) Provision was also made for payment of higher water rentals by the grantees in case of increased operating expenses. (Agreements, § (4).)
Even if it be assumed that there is some ambiguity in the contracts, all evidence that could have any bearing on
The court correctly instructed the jury that the agreements were modified so as to require defendant to deliver water for household purposes under reasonable pressure. Defendant, following the practice of the Hattons, had delivered water for those purposes under pressure for more than a year when plaintiffs became dissatisfied and entered into negotiations with defendant to increase the pressure under which the water was furnished. After a meeting of the parties at which Wright, an installer of water systems, suggested that another 500-gallon pressure tank be installed, Milner, on April 13, 1953, wrote defendant a letter reading in part: “. . . I will prepay to you up to approximately $1,000.00 of the water rentals Acadia California, Ltd. will be liable for. This is the amount which James B. Wright, Jr. estimates will be necessary to make such additions and adjustment to your existing plant to insure an adequate water supply.” After a second tank was installed and defendant was billed for the
Defendant’s denial of an intention to modify the agreements when he accepted the check was ineffective. Where something to which the offeree is not unconditionally entitled is tendered to him upon stated conditions and he exercises dominion over it, he is bound by the conditions even though he informs the offeror that he rejects them. When he can rightfully exercise dominion over the thing tendered only if he accepts the conditions, he will not be permitted to avoid them by asserting that his conduct was tortious. (See Rest., Contracts, § 72, subsec. 2, and comment b; 6 Williston on Contracts (rev. ed. 1938), § 1856; cf. Edgar v. Hitch, 46 Cal.2d 309 , 311 [ 294 P.2d 3 ]; Grayhill Drilling Co. v. Superior Oil Co., 39 Cal.2d 751 , 753 [ 249 P.2d 21 ]; Potter v. Pacific Coast Lumber Co., 37 Cal.2d 592 , 597 [ 234 P.2d 16 ].) Since the check was tendered on condition that the delivery of household water under pressure with the improved facilities would be continued so as to insure an adequate water supply for plaintiffs, defendant’s acceptance of the check bound him to give the service for which the check was intended to be the consideration.
Defendant contends that errors were committed in the award of damages to plaintiffs. In connection with this contention, it should be pointed out that plaintiffs could recover either in contract or in tort and that it is clear from the verdict that the recovery was based on tort. An act that constitutes a breach of contract may also be tortious. (Langley v. Pacific Gas & Elec. Co., 41 Cal.2d 655 , 662 [ 262 P.2d 846 ]; Jones v. Kelly, 208 Cal. 251 , 255-256 [ 280 P. 942 ]; Tooke v. Allen, 85 Cal.App.2d 230 , 236-237 [ 192 P.2d 804 ].) In the Jones case, which is factually similar to the present one, it was held that a good cause of action in tort was stated by a complaint alleging that the defendant leased the plaintiff a house together with a sufficient supply of water for the plaintiff’s family and that during the tenancy the defendant wilfully and maliciously shut off the water supply. Here
Burke was awarded damages for loss of his wife’s services and for his own suffering and anxiety resulting from the effect on his wife of the shutting off of the water supply. The evidence showed that Mrs. Burke, who had suffered from a mental illness in 1954 but who early in 1955 was normal again, suffered a relapse in April 1955 caused by the shutting off of the water and that because of her relapse she received ' extensive medical treatment and hospitalization.
The jury was correctly instructed that if Burke was entitled to damages he should be awarded “a sum that will compensate him reasonably for any loss of his wife’s services that he has suffered as a proximate result of the defendant’s conduct.” (Code Civ. Proc., § 427; Meek v. Pacific Electric Ry. Co., 175 Cal. 53 , 56-57 [ 164 P. 1117 ] ; Martin v. Southern Pacific Co., 130 Cal. 285 , 287 [ 62 P. 515 ]; McKune v. Santa Clara V. M. & L. Co., 110 Cal. 480 , 487 [ 42 P. 980 ], Tell v. Gibson, 66 Cal. 247 , 248-249 [ 5 P. 223 ]; see Moody v. Southern Pacific Co., 167 Cal. 786 , 789-790 [ 141 P. 388 ].) The instruction did not, as defendant urges, permit the jury to award Burke damages for loss of consortium, that is, for loss of noneconomic aspects of the marriage relationship such as society and companionship.
It was also proper to permit the jury to award damages to Burke for his mental suffering. It is settled that, regardless of whether the occupant of land has sustained physical injury, he may recover damages for the discomfort and annoyance of himself and the members of his family and for mental suffering occasioned by fear for the safety of himself and his family when such discomfort or suffering has been proximately caused by a trespass or a nuisance. (Kornoff v. Kingsburg Cotton Oil Co., 45 Cal.2d 265 , 271 et seq. [ 288 P.2d 507 ] ; Herzog' v. Grosso, 41 Cal.2d 219 , 225-226 [ 259 P.2d 429 ]; Anderson v. Souza, 38 Cal.2d 825 , 833 et seq. [ 243 P.2d 497 ] ; Judson v. Los Angeles Suburban Gas Co., 157 Cal.
With respect to the damages awarded to Acadia, defendant makes two claims of error. He first asserts that there is no evidence of damage suffered by the corporation, although there is evidence that Milner made various expenditures as a result of defendant’s conduct. Since Acadia was the owner of the land and the water rights, and the Milners owned Acadia, an inference was permissible that Milner was acting for the corporation in making the payments. Defendant next complains of an instruction that Acadia could recover the cost of drilling a new well on its land, arguing that such a recovery could be had, if at all, only on the theory that there had been an anticipatory breach by defendant and that this theory was inconsistent with the position taken by plaintiffs. The instruction, however, limited recovery to such expenditures as were made in an attempt to mitigate damages and were reasonably necessary under the circumstances. As so limited, the instruction was proper.
The judgment is affirmed.
Traynor, J., Schauer, J., McComb, J., Peters, J., White, J., and Dooling, J., concurred.
Appellant’s petition for a rehearing was denied July 20, 1960.
Cases cited
- Edgar v. Hitch 46 Cal.2d 309 at 311 p. 336
- Grayhill Drilling Co. v. Superior Oil Co. 39 Cal.2d 751 at 753 p. 336
- Potter v. Pacific Coast Lumber Co. 37 Cal.2d 592 at 597 p. 336
- Langley v. Pacific Gas & Electric Co. 41 Cal.2d 655 at 662 p. 336
- Jones v. Kelly 208 Cal. 251 at 255-256 p. 336
- Tooke v. Allen 85 Cal.App.2d 230 at 236-237 p. 336
- Meek v. Pacific Electric Railway 175 Cal. 53 at 56-57 p. 337
- Martin v. Southern Pacific Co. 130 Cal. 285 at 287 p. 337
- McKune v. Santa Clara Valley Mill & Lumber Co. 110 Cal. 480 at 487 p. 337
- Tell v. Gibson 66 Cal. 247 at 248-249 p. 337
- Moody v. Southern Pacific Co. 167 Cal. 786 at 789-790 p. 337
- Kornoff v. Kingsburg Cotton Oil Co. 45 Cal.2d 265 at 271 p. 337
- Herzog v. Grosso 41 Cal.2d 219 at 225-226 p. 337
- Anderson v. Souza 38 Cal.2d 825 at 833 p. 337
- Alonso v. Hills 95 Cal.App.2d 778 at 787-788 p. 338
- Guillory v. Godfrey 134 Cal.App.2d 628 at 632 p. 338
- Rideau v. Los Angeles Transit Lines 124 Cal.App.2d 466 at 471 p. 338