Majority
This is an appeal from a judgment upon a contract for the sale and delivery of electric energy.
The respondent is' an irrigation district organized .and operating under the California Irrigation Act. The appellant is a public utility corporation organized for the purpose of supplying consumers with electric power and light. In February, 1924, the respective parties executed a written contract by the terms of which the appellant agreed to purchase. from respondent the entire output of a 25,000
In due time the plant was constructed by building a concrete dam across the Merced River which formed a reservoir impounding the water, from which it flowed in two units through gates, penstocks and turbine-wheels to the generators. This water-power had a variable head with a maximum depth of 300 feet, but the average head was 240 feet. The plant was constructed with two complete units. The manufacturer’s rating of each of these units as indicated by the label plates attached to each of the generators was “15,625 K.V.A. (kilovolt amperes) at 8-10 power factor. ’ ’ Expert witnesses testified this meant each of these generators operated at eighty per cent power factor would produce 12,500 kilowatts of electric energy per hour, with a capacity of 15,625 kilowatts when operated at unity which is full power factor. This gives the combined units a possible capacity of 31,250 kilowatts. Testimony was adduced indicating that these generators were designated by the manufacturer and known to the trade to be 12,500 kilowatt machines, and were intended to be operated at eighty per cent power factor, allowing the remaining possible twenty
The evidence based upon the daily log records of the plant indicates that the average output which was actually generated by the plant during a period of 329 days from July 1, 1927, to July 1, 1928, was 23,844 kilowatts; except that for a brief period of about six days, when the head of the water supply was at a maximum height of 300 feet and conditions were most favorable, the plant developed 32,400 kilowatts. At no other time did the plant exceed its maximum capacity of 31,250 kilowatts.
It was stipulated that pursuant to the foregoing contract the respondent generated in 1927 and transferred to the appellant’s power lines a total quantity of electric energy aggregating 126,588,850 kilowatt hours; that between April 1 and August 31, 1927, respondent produced 86,655,470 kilowatt hours, which last-mentioned figures contained an output of 13,630,180 kilowatts in excess of 25,000 kilowatt hours, and which entire output was fully paid for according to the terms of the contract except said amount of 13,630,180 kilowatts, which at 4% mills per kilowatt was valued at $61,396.23. This sum was not paid. For this amount the jury rendered a verdict in favor of respondent and a judgment was entered accordingly.
The vital questions to be determined in the present case are, what is the maximum capacity of a hydroelectric generating plant commonly termed a 25,000 kilowatt plant?
The appellant contends that it contracted to purchase only a maximum of 25,000 kilowatt hours of electric energy, instead of the entire output of the plant, and that it has fully paid respondent to the extent of its obligation. Its position is concisely stated as follows: “The Power Company’s obligation is limited to its' agreement to take and pay for the output of said plant, and said plant is referred to as a plant to be constructed by the Irrigation District and to be a plant of about 25,000 kilowatts capacity.” It must be conceded that the parties contracted with relation to the output of a hydroelectric plant of “about 25,000 kilowatts capacity,” but that the appellant clearly agreed to purchase “the total output from the water passing through said (25,000' kilowatt) plant,” and that at no time would the appellant “require the operation of the plant at a power factor which will act to reduce the electric energy that could be generated by the available water.”
The chief controversy centers around the application of the words “about” and “capacity” as they are employed in the contract.
The energy which may be produced by a hydroelectric plant depends upon the capacity of the plant and the power factor which is derived from the water supply. The term “power” means the rate at which the work of transforming or producing the energy is performed. The amount of work which is performed in a given period of time is therefore the unit of power. In mechanics the rule adopted by James Watt is still accepted as the basis upon which to measure power. He estimated that the “horsepower unit” was equivalent to 33,000 foot-pounds of work per minute. This is still the rule in steam or hydraulic engineering. The term “watt” as it is used in electrical engineering is the rate at which the work is performed in an alternating circuit with a current of one ampere and an electromotive force of one volt. Seven hundred and forty-six watts are equivalent to one horse-power. The power factor of such a plant as the one which is involved in this case depends upon the capacity of the generating apparatus
The foregoing conclusion is based upon the technical meaning of the phrase which is used in the contract, to wit, “a plant of about 25,000 kilowatt capacity,” as it was construed by respondent’s expert witnesses. The word “capacity” does ordinarily mean the maximum ability to retain contents or perform work. But we think this is too narrow a definition for the purpose of construing the con
While it is ordinarily the province of the court to construe the language of a contract, there are so many scientific factors involved in determining the kilowatt capacity of an electric generating plant that it becomes a proper subject for expert testimony. (United States Heater Co. v. Jenss, 128 Wis. 162 [ 107 N. W. 293 ].) It became a question for the determination of the jury as to whether the term “capacity” was used in its ordinary sense or in a technical trade sense. Nor do we think that a fair construction of the record binds the respondent to a stipulation that it was employed only in its ordinary sense. It is true that in a lengthy controversy between respective counsel and the court, Mr. Downey, one of respondent’s attorneys, addressing himself to the court, did say: “I might call your Honor’s attention to the fact that the directors of the Merced Irrigation District were not electrical engineers and when they used the term ‘capacity’ in a contract, they are using it as ordinary men understand it, not as some handbook of the American Institute of Electrical Engineers may follow. That is the question for the jury.” The entire colloquy and the chief issue in the case were with respect to the import and intended meaning of the term “an electric plant of about 25,000 kilowatt capacity.” Following the foregoing remark of counsel, in response to Mr. Pearson’s effort to construe this into a binding stipulation against respondent, Mr. Downey denied his intention to so stipulate, saying: “Well, I hadn’t been aware of the fact I had conceded anything ...” An impulsive statement of counsel against interest which is made in the turmoil of trial, and appears not to have been intended, will not bind the client.
The appellant charges error in the giving and refusing of certain instructions. Instruction number 7, which is challenged, was given as follows“You are instructed, therefore, that it is your duty to determine whether or not the power house constructed by the Merced Irrigation District is of a capacity of about 25,000 kilowatts, and if you so find, then you must further find that under the provisions of the contract in evidence, defendant is and was bound to accept the entire electrical output therefrom.” This was
Error is charged in the refusal to give appellant’s instruction number 3, which included the following statement: “ . . . The word (about), however, must not be understood by you to permit of more than a small or slight departure from the amount named in the contract of 25,000 kilowatts.
. . . ” This instruction is erroneous since, in view of the record, it leaves out of consideration the maximum possible production of a 25,000 kilowatt plant operated at unity factor so as to actually generate 31,250 kilowatts per hour. The instruction limits the variation to only a slight departure from the figure of 25,000, rather than the maximum output of a “25,000 kilowatt plant.” It was therefore not error to refuse to give this instruction.
Appellant’s instruction number 2 was also refused. It is a correct definition of the word “capacity,” but would be misleading in view of the state of the record, unless its application were explained. It reads as follows: “In determining the question as to what is the kilowatt capacity of the power house of the Merced Irrigation District, you are instructed that the word ‘capacity’ shall be taken by you to mean, as it is applied to the facts in this ease, the number of kilowatts which the power house is capable of generating or producing. In other words, the word ‘ capacity’ means the measure of the maximum ability of the power house to produóe kilowatts.”
The judgment is affirmed.
Finch, P. J., and Plummer, J., concurred.