Majority
Headnote
[1] Contracts—Payment for Excavation Work—Inclusion in Unit Price —■ Construction. — Where a county road construction contract provides that the contractor shall receive a specified price per cubic yard for “all concrete work, including all excavations ... in place complete,” it cannot be said that said contractor is to receive no compensation from the county for excavation for the concrete work below the adopted grade line for the road, merely because the grading provisions of the contract specify that the contractor is not to be paid (under those provisions of the contract) for excavations below the adopted grade.Plaintiff as assignee brought this action to recover of and from the defendant A. J. Fairbanks the sum of $2,023.77, for certain road construction work done and performed by plaintiff’s assignor, G. L. Lisher. The second amended complaint is in two counts. The first count declares upon a written contract and covers a demand of $1,979.03, and the second count is upon a quantum mei'uit for the recovery of $44.74 for work done on the same road, outside of the written contract. Before the trial was concluded plaintiff was paid the sum of $1,454.11 on the amount claimed to be due under the first count, leaving in dispute a balance under that count of $502.43. Plaintiff was denied relief on both counts and has appealed.
In September, 1920, the county of Sonoma awarded a contract to respondent for the rebuilding of section “A” of the Healdsburg-Forestville highway, which included the work of grading, filling, removal of oil from roadway, graveling, and concrete work. Subsequently, on April 1, 1921, respondent entered into a separate contract with G. L. Lisher, appellant’s assignor, to do the concrete work specified in the county contract. Referring to the first count, the controversy arises over the refusal of respondent to pay for the excavation of 669.9 cubic yards of earth necessarily removed by Lisher below the adopted grade line in order to construct the concrete drain boxes in conformity with the county plans and specifications.
Respondent’s contract with the county was based upon certain unit prices, which, so far as they are important here, were as follows: “For excavations ... as may be necessary to bring the surface of the roadway to conform with the adopted grade and cross-section, the sum of eighty-five cts. (85 cts.) per cubic yard. The yardage to be paid for being only in excavation.” For graveling the entire length of the road, $21,315.80. “For all concrete, including all excavations, back filling, forms, materials, reinforcement, hauling and labor, the sum of Thirty Dollars ($30.00) per cubic yard in place complete. This applies to headwalls, catch basins,
Lisher’s contract with Fairbanks, which, as before stated, covered only the concrete structures specified by the county contract, “including boxes and culvert pipe headwalls,” was let upon the following unit prices: “For concrete headwalls (twenty-six dollars) per cubic yard. For all concrete in place (twenty-five dollars) per cubic yard. For excavation for concrete boxes (seventy-five cents) per cubic yard.” The quotation of these prices in the contract was followed by this provision: “All work to be done in accordance with the contract, plans and specifications, of the county of Sonoma, which are referred to and made a part of this contract, and to the satisfaction of the Engineer, whose decision will be final in all matters affected by the contract which may be in dispute between the parties hereto.” Respondent’s refusal to pay for the excavations in question is based upon the above-quoted limitation clause of the county contract, regarding excavations, and the reference clause of the Lisher contract which makes the county contract a part of the Lisher contract. Respondent in this respect contends, and the trial court held, that in view of these two provisions “unless Fairbanks received payment from the county for excavations claimed by plaintiff that defendant was under no obligation to pay Lisher for such excavation. In other words,” says respondent, “the trial court held that because Fairbanks was not paid for excavations below the adopted grade line, Fairbanks need not pay Lisher for excavations below the grade line.”
We are unable to acquiesce in that view of the situation. [1] In the first place, the assumption by respondent and by the trial court that the county contract made no provision for the payment to Fairbanks for excavations made below the grade line in placing the concrete structures, and that
[3] We are also of the opinion that appellant is' entitled to recover the amount claimed to be due under the second count. Part of the work covered by the demand is admittedly due, Fairbanks himself having ordered it, and the remainder, for placing twelve yards of rock under a culvert, was authorized by the county engineer apparently with respondent’s consent and for aught the record shows respondent received the benefit thereof under his contract with the county. Appellant performed the work for respondent and not for the county and he seeks to charge the respondent and not the county therefor; consequently, a written order from the engineer, authorizing the work, was not necessary the same as it would have been if the county was sought to be held liable.
Judgment reversed.
Tyler, P. J., and St. Sure, J., concurred.