Majority
Petitioner, The Stockton and East San Joaquin Water Conservation District, has appealed from a judgment which in part restrains it from using a watercourse through respondents’ land to flow water stored in an upstream reservoir. This court is asked to issue its writ of supersedeas with respect to that injunction order.
Petitioner is a public corporation organized under the laws of the State of California and its included lands are located in San Joaquin County. It is organized under Deering’s General Laws, Act 9127c, as amended, and is given the right of eminent domain. It has powers to conserve and store water by acquiring dam sites, reservoirs, canals, ditches, etc.
Plaintiffs, respondents here, are the owners of some 600. acres of highly developed orchard land through which there
Prior to 1934 respondents had been able to cross the dry bed of North. Slough at many places as it went through their lands, with their farm equipment of various kinds, including trucks, heavy tractors and the like. Shortly before that time, however, defendant Linden Irrigation District was formed, embracing a part of the same land now contained within the boundaries of the appellant conservation district, and it proceeded to implement a plan for the use of waters from the Calaveras River to irrigate the lands within that district, which included the lands of respondents. In 1930 the city of Stockton had completed a regulating dam on the Calaveras River known as Hogan Dam located about 30 miles up the Calaveras River east of respondents’ lands. The purpose of this dam was to regulate the flood flows in the river and for that purpose it was pierced with various openings calculated to allow only so much water down the channel of the river as could be accommodated by Mormon Slough. The channel of this latter stream had as a part of the same plans of the city been rectified and charted around the city limits to prevent its waters at flood from entering the city. The Linden District’s plans envisioned the use of Hogan Dam for storage purposes and it obtained contractually the consent of the
As a condition of entering upon respondents’ lands, the district orally agreed that it would construct two bridges across the channel within respondents’ land, and a third bridge across what is called the Lewis property lying to the west of respondents’ boundaries as then existing, in order that the channel could be conveniently crossed for all farming purposes. On the Lewis property one bridge already existed and this bridge the district reconstructed and brought into good condition. There was an old bridge on respondents’ lands also which received the same treatment and one completely new bridge was built. The Linden project was not wholly successful, the amount of water being short of the needed supply and subject to such pumping by farmers and stockmen whose lands lay between the district and the Hogan Dam as to seriously deplete the available water. About 1936, therefore, the Linden District ceased to use the channel and for 13 years made no effort to send water down it. By that time, by natural processes again, that portion of North Slough which lay between the westerly line of respondents’ lands (they having in the meantime purchased the Lewis property) and the point where the river separated into Mormon Slough and North Slough was refilled with silt, so that again, at the junction, the bed of North Slough was raised so far above that of Mormon Slough that only the crests of the floods could enter. In fact, there is considerable evidence that due, in part, to the lowering of the flood crests by the operation
In 1948 appellant conservation district was organized and it included much more territory than had been included within the Linden District. The city of Stockton was within the new district and has not been included in the Linden District. Appellant district made arrangements with the city of Stockton for the augmented use of Hogan Dam as a storage dam. It expended considerable sums in placing control gates in the openings that had been left in Hogan Dam so that more accurate control of floods could be exercised, with the result that many thousands of acre feet of water could during the course of a season be stored beyond' the flood period and thereafter used much as the Linden District had attempted to use the water. Appellant made no contract with respondents • and, without obtaining any consent, cleaned out the channel as it had been dredged by Linden District. By that time the bridges were in bad condition and appellant made no effort to repair them. Respondents served notice upon appellant that unless it repaired and undertook in writing to keep in repair the bridges across North Slough the leave or license under which Linden District had built and maintained the bridges would be revoked, it being the position of respondents that the acts of appellant in entering upon respondents’ lands to dredge out North Slough and its acts in bringing water down from the dam were without right and unlawful. Appellant ignored this notice and continued with its acts and from that time until the present has each year stored water behind Hogan Dam and has brought it down to the lands within its boundaries through North Slough. As an aid in doing this it constructed a weir across Mormon Slough downstream from its junction with North Slough, thus elevating the water in Mormon Slough to aid in causing it to flow down the channel. It began flowing water down the channel of North Slough in fruition of this general plan of conservation in 1950 and has continued to do so ever since. It was shown in evidence that many farmers were pumping water from the channel, thus lessening the drain on the underground water; and that by depositing this water from the channel directly upon the lands, and by percolation of water 'from the channel, the water table was being steadily
By their complaint respondents alleged the foregoing in substance, asserting that appellant’s acts had been without rights, and further alleged that due directly to the acts of appellant in diverting water in excess of the natural flow through North Slough their lands had been severed into two parcels and that the value of their holdings had been reduced in the sum of $77,000. They prayed for a judgment in that sum and also asked that “defendants be enjoined from introducing foreign water into said watercourse in excess of its natural flow as it existed prior ot 1933.”
By its findings the trial court found generally the facts above recited, and specifically further found the following: That the deepening of the channel of North Slough across the lands of plaintiffs was an integral part of the district’s general project to increase the flow in North Slough for public use; that said project would not be effective without the deepeuing and excavation of the channel on respondents’ lands; that the effect of the operation of the entire project since 1949 had been to cause the water to flow from the main channel of Calaveras River into North Slough for public use almost continuously throughout the year; that said water had continued to so flow until the trial of the action; that since the first of January, 1949, the appellant “has furnished irrigation water from the North Slough without cost to numerous landowners within its boundaries whose lands adjoin the North Slough; . . .; that since the 31st day of May, 1953, the direct effect of said continuous flow of water through the excavated channel on plaintiffs’ lands has been to sever the lands of the plaintiffs into two separate parcels [this date of May 31, 1953, refers to a finding that the date marks the time when the existing bridges became incapable of safe use] ; that said lands have continued to be so severed until the trial of this action”; that the value of respondents’ lands in an unsevered condition was and since May 1, 1949, had been $840,000, and that the severance had reduced the value by $77,000.
Among the conclusions of law we find the court declaring that the appellant had no right to sever the lands of respondents by diverting water through the excavated channel of North Slough and through their lands; that any consent for such diversion was terminated by May 1, 1949, and “that the continued diversion by the defendant, Stockton and Bast
Appellant asks this court to issue a writ of supersedeas operative pending appeal, whereby the injunctive features of the judgment shall be suspended, with the result, of course, if this be done, that the district will continue with its project of sending water across the respondents’ lands through the excavated channel of North Slough.
At the outset we have to consider the nature of the
Discussing now the question of what sort of injunction we have in the case before us, we find a line of eases which we think decisive.
In Clute v. Superior Court, 155 Cal. 15 [ 99 P. 362 , 132 Ann.St.Rep. 54], there was presented the following set of facts: A corporation running a hotel sued out a temporary injunction against the defendant who claimed to be the treasurer of the corporation and the manager of the hotel. By the decree he was ordered to cease collecting money or disbursing the same, to cease representing himself as manager and treasurer and to cease interfering with, directing or attempting to direct, or controlling, the employees of the corporation. Said the Supreme Court: “It is thoroughly settled that, while an injunction which merely has the effect of preserving the subject of the litigation in status quo is not suspended by an appeal, ... a mandatory injunction, i. e., one which compels affirmative action by the defendant, cannot be enforced pending a duly perfected appeal. . . . If an injunction, though couched in terms of prohibition, is mandatory in effect, a proceeding by the court issuing it to punish a violation as a contempt is in the nature of process for the enforcement of the affirmative feature of the writ. It may be likened to an execution, and, if the enforcement of the injunction has been stayed by an appeal, a writ of supersedeas may properly be issued by the appellate court to arrest further action by the court below.”
We next refer to Joerger v. Mt. Shasta Power Corp., 214 Cal. 630 [ 7 P.2d 706 ]. There the plaintiff in the action was asserting a violation by the defendant of riparian rights in a stream, the waters of which it had diverted above plaintiff’s land and carried to a point where the water was returned to the stream below plaintiff’s land. The trial court had granted a preliminary injunction against defendant, restraining it from so interfering with the waters of the stream, and the defendant corporation appealed. Said the court on the nature of the injunction: “This brings us to the consideration of the vital phase of the present controversy, viz., the nature of the injunctive order. If it be mandatory in character it is conceded that it is automatically stayed by the appeal therefrom. ... We are persuaded that the injunctive order issued herein has the essential characteristics of a mandatory injunction. The defendants are and always have been lawfully in possession of their property. In that possession they are engaging in a lawful use thereof. They are not trespassing upon any of the rights of the plaintiff. . . . The effect of the order, if enforced, would be to disturb a lawful use of property lawfully in possession, and to dispossess the defendants of the use of any of the waters of the stream. ’ ’ The court then declared that the decree was automatically stayed as a matter of law by the appeal.
We refer next to Feinberg v. One Doe Co., 14 Cal.2d 24
We next refer to Byington v. Superior Court, 14 Cal.2d 68 [ 92 P.2d 896 ]. San Francisco had built two dams on the Hetch Hetchy. A lower riparian owner had sought to quiet title to certain riparian rights and asked injunctive relief to protect those rights. The trial court declared the extent of the rights of the city and enjoined it from storing water in excess of its storage rights as so declared. An appeal was taken and pending the appeal the city raised the height of one dam above what it had been, with the result that the total storage was increased by over 100,000 acre feet. The trial court proceeded to adjudge the public utilities commission of the city to be guilty of contempt. Said the Supreme Court: “Whether an injunction is prohibitory or mandatory in character is not always easy of determination. What may appear to be negative or prohibitory frequently upon scrutiny proves to be affirmative and mandatory. The authorities indicate that an injunctive decree that compels the surrender of the lawful possession of real property amounts to the granting of affirmative relief and is mandatory in character. . . . The reasoning therein [referring to cited cases] compels the conclusion that the injunction involved herein was mandatory in character and stayed by the appeal
Before applying the foregoing rules for determining the character of the injunctive decree before us, we return to the facts found by the trial court. It found that the appellant is a public corporation possessing the power of eminent domain and that for the purpose of the public use, of which it was in charge, it had, a number of years before respondents filed their action, entered upon their property, excavated the channel of North Slough and begun the service of water to consumers, which water it was storing behind Hogan Dam; that all it did was for the benefit of the persons within its boundaries entitled to its services; that the acts of which respondents complain had been going on continuously up to the time of trial and that whatever it had done upon respondents’ property was doné in the service of a public use. The court found further that its acts in' entering upon respondents’ property, in excavating the channel of North Slough, and in turning dovph the slough quantities of water through the greater part of each year, amounted to a taking. Just what was taken the court did not by its findings specifically describe, but it,is apparent from the record that it could' only have meant that through adapting the channel of North Slough to its .purposes and uses for the transportation of water it had assumed an easement or right of way across respondents’ lands for that purpose. This analysis is reinforced by those parts of the judgment describing with great particularity the location of the,easement which, according to the trial court, the
We conclude that this injunction is mandatory and is automatically stayed by the appeal. In theory therefore no supersedeas need be granted since the statutory supersedeas is operative. However, we think it appropriate that, to set the matter at rest, we should grant the writ asked for.
Let a writ of supersedeas issue.
Peek, J., and Schottky, J., concurred.
Cases cited
- Food & Grocery Bureau v. Garfield 18 Cal.2d 174 at 176-177 p. 257
- Schwarz v. Superior Court 111 Cal. 106 p. 257
- Ohaver v. Fenech 206 Cal. 118 p. 257
- Feinberg v. One Doe Co. 14 Cal.2d 24 p. 257, p. 258
- Byington v. Superior Court 14 Cal.2d 68 p. 257, p. 259
- Clute v. Superior Court of S.F. 155 Cal. 15 p. 257
- Joerger v. Mt. Shasta Power Corp. 214 Cal. 630 p. 258