Majority
This is an appeal from a judgment granted on a directed verdict in favor of defendants. Plaintiffs are the surviving spouse and the surviving sons of Laura Catherine Breslin, deceased. She was driving an automobile in which they were riding when it went off State Highway 101B (Dixon-Rio Vista cutoff) in Solano County. She was killed and they were injured. They sue for damages for their own injuries and losses and also as her heirs at law.
It appears that the road on which Mrs. Breslin was driving had needed resurfacing and the Division of Highways of the Department of Public Works had let a contract to respondents for doing that work. The contract covered about three miles of road and required respondents to prepare the existing road surface for resurfacing and to then apply a layer of asphaltic blacktop spread to a width of 18 feet and to a depth of 1 inch, completely covering the previously existing paved surface of the highway. It stands without dispute that respondents had proceeded with the performance of their contract and in full accord therewith had completed the work prior to the occurrence of the accident out of which this action arose; that the resident engineer having supervision over the work had
It stands without dispute that the contract did not require
Save as relinquished to respondents so far as appropriate to the performance of their contract, the state had control of the highway with a continuing duty to use care in making and keeping the road safe for the use of the public and this included the duty to avoid the existence of dangerous defects. From liability for failure to perform this duty the state is protected by sovereignty, but still the duty is there. The state, as is usual, elected to have the work of repair done without closing to public travel the section being repaired. Accordingly, though surrendering a certain amount of control to the respondents, the contract contained provisions whereby the duty of protecting the public in its use of the road during construction was cast upon the contractors. The contract provided that whenever the contractor’s operations created a
We think it clear that, in view of the use by the public of the road during the contractor’s operations, the existence of the sudden drop from the level of the pavement to the adjacent shoulder constituted what the jury could have concluded was a dangerous condition, and that during that period a failure to warn the public of such dangerous condition could have been found to be a violation of the contractor’s obligation of due care with the consequence that if a motorist without neglect drove into the depression and was caused to lose control of the car and suffered damage, an award against the contractor therefor would have found support in the record. But, of course, all this is said only on the assump
Although a contractor is not liable for injuries suffered after completion and acceptance of the work, even though his negligence in performing the contract caused the damage (Johnston v. Long, 56 Cal.App.2d 834 , 837 [ 133 P.2d 409 ]), nevertheless it is well established that:
“A highway contractor doing work on a public highway or street owes to the traveling public the duty of protecting it from injury that may result from his negligence. He is under a duty, for instance, to warn travelers of existing hazards during the construction period by the placing of lights, guards, warning signs, and barriers. His failure to place lights on obstructions left on the highway, especially where such lights are required under his contract or by ordinance, constitutes negligence, irrespective of whether the work was being done under proper authority.” (25 Cal.Jur.2d 99-100.)
Furthermore, the contractor’s liability may be prolonged by the provisions of his contract. The propriety of such provisions is readily apparent. The state necessarily surrenders to the contractor a large measure of control over
“. . . In the instant case, whatever his rights under the provisions of such section of the statute may have been, appellant engaged to erect and maintain at all times during the progress or temporary suspension of the work, suitable barricades, fences, signs, or other adequate protection and to provide, keep, and maintain such danger lights, signals, and watchmen as might be necessary to insure the safety of the public. He agreed that his responsibility for the maintaining of barricades and light should cease only when released in writing by the engineer. He stipulated that failure of the engineer to notify him to maintain barriers, lights or a watchman should not operate to relieve him from that responsibility.
And last but not least he contracted not only to assume all risks and liabilities for accidents and damages that might occur to persons or property during the prosecution of the work by reason of the negligence or carelessness of himself, his agents and his employees but also to assume all direct or indirect damage that might be suffered or claimed on account of any such construction or improvement during the time thereof and until the highway was accepted. Assuming, without deciding, the foregoing obligations and liabilities were more than would have been required of him under the provisions of 68-121, supra, he had the right to incur them and, having done so, he cannot now be heard to say his liability for negligence under the contract ceased until he had been discharged therefrom in accord with its terms, namely, when he had been released in writing by the engineer or when the highway was accepted by the board of county commissioners. Since no one contends he had been discharged from liability in the manner agreed upon the result is the trial court’s theory of the case was correct and that its Instruction No. 26, as well as its rulings of like import respecting other matters, to the effect the question whether appellant had or had not completed construction of the road had nothing whatsoever to do with the issues in the case were proper.”
Although we have a number of cases holding that a contractor is responsible for his negligence occurring during the progress of his work, the question of prolongation of liability for the safety of the road under the terms of his contract beyond the point where his work is completed, insofar as research has disclosed, has not come squarely before the courts of this state. For the reasons we have given, however, and on the authority of cases from other jurisdictions we have cited, we think it must and should be held that where the contractor in his contract accepts responsibility for the condition of a public road as made or left by the performance of his contract until a certain type of release has been effected such liability continues and persons injured by defective conditions of the road during such a period may recover against the contractor. It stands without conflict that no formal acceptance of the contractor’s work had taken place until a considerable time after the appellants suffered their injuries. There was no proof that the resident engineer was empowered to release respondents from further liability. There was no proof that the respondents sought or obtained release prior to formal acceptance under those provisions of the contract
It appears from this record, therefore, that the question of whether or not the drop-off from pavement to the shoulder was a defective and dangerous condition was for the jury and that respondents had by contract accepted responsibility to the traveling public from the time they undertook their work until it should have been formally accepted or they had been otherwise released in accordance with the contract’s terms. No such release was proved and it was conceded that formal acceptance resulting in release had not occurred. For aught that appears in this record, respondents were liable if appellants were injured as a result of a dangerous condition of the highway. It was error, therefore, to direct a verdict in their favor.
The judgment is reversed.
Schottky, J., and Warne, J. pro tem.,[1] concurred.
A petition for a rehearing was denied August 19, 1957, and respondents’ petition for a hearing by the Supreme Court was denied September 18,1957. Sehauer, J., was of the opinion that the petition should be granted.
* Assigned by Chairman of Judicial Council.
Cases cited
- Johnston v. Long 56 Cal.App.2d 834 at 837 p. 786