Majority
— Petitioner Johnson Rancho County Water District is a public entity located in Tuba County and formed in 1958 under the provisions of the “County Water District Law.” (Wat. Code, §§ 30000 et seq.) Tuba County Water Agency, the real party in interest in this action, is a countywide public entity established by a special act of the Legislature in 1959 to develop and promote the use and regulation of the water resources of Tuba County.[1] (Cal. Stats. 1959, ch. 788, as amended; Wat. Code-App., eh. 84 [Deering’s Wat. Code, Act 9407, §§1-28.].) These two agencies presented competing applications before the respondent State Water Rights Board seeking permits to appropriate major portions of the remaining unappropriated water of the Tuba River. Each application described a plan for development of a series of water storage and power facilities. Construction of both projects is not possible because of conflicts in the location of facilities.
After considering plans and supporting data plus testimony developed in eight days of hearing, the Water Rights Board on December 19, 1963, filed a decision approving the Tuba Agency project, granting its water rights applications (subject to minor limitations) and denying the applications of Johnson Rancho. On February 17, 1964, the board denied Johnson Rancho’s petition for reconsideration. The latter commenced a mandate action in the Superior Court of Nevada County seeking judicial review of the Water Rights Board’s action. The trial court’s review resulted in its re
1 por convenience we shall refer to petitioner as “Johnson Rancho99 and to the real party in interest as “Yuba Agency.” All section references in this opinion are to the Water Code unless otherwise noted.
The parties are in apparent agreement that Code of Civil Procedure section 1094.5[2] governs judicial review of Water Rights Board actions on applications for water appropriation. (Temescal Water Co. v. Department of Public Works, 44 Cal.2d 90 , 106 [ 280 P.2d 1 ].) They also seem to agree that the reviewing court is not to reweigh the evidence but to determine, from the evidence before the board, whether the findings of the board are supported “by substantial evidence in the light of the whole record.” (Code Civ. Proc., § 1094.5, subd. (c); see Southern Cal. Jockey Club, Inc. v. California Horse Racing Board, 36 Cal.2d 167 , 174-175 [ 223 P.2d 1 ].) Nevertheless, the trial court findings recite that the findings of the Water Rights Board are supported by the weight of the evidence.
The decision of the Water Rights Board sets out condensed descriptions of the respective projects. The Johnson Rancho plan is described as follows: “The revised plan contemplates the construction of the Indian Valley Reservoir of 282,000 acre-foot capacity on the North Yuba River, an 825,000 acre-foot capacity Parks Bar Reservoir on the main stem of the Yuba River, and a 200,000 acre-foot capacity Waldo Reservoir for off-stream storage on Dry Creek. Water is to be released from the Indian Valley Reservoir through the Indian Valley Power Plant located at the downstream toe of the dam, thence into New Bullards Bar Reservoir for release through New Bullards Bar and New Colgate Power Plants to P.G-.&E.’s Englebright Reservoir. Water will be either re
2 Code of Civil Procedure section 1094.5 provides in part as follows: ‘ ‘ (b) The inquiry in such a ease shall extend to the questions whether the respondent has proceeded without, or in excess of jurisdiction; whether there was a fair trial; and whether there was any prejudicial abuse of discretion. Abuse of discretion is established if the respondent has not proceeded in the manner required by law, the order of decision is not supported by the findings, or the findings are not supported by the evidence. “ (c) Where it is claimed that the findings are not supported by the evidence, in eases in which the court is authorized by law to exercise its independent judgment on the evidence, abuse of discretion is established if the court determines that the findings are not supported by the weight of the evidence; and in all other cases abuse of discretion is established if the court determines that the findings are not supported by substantial evidence in the light of the whole record. ’ ’
In support of its application the Yuba Agency submitted a plan described as follows: “Yuba proposes to construct a diversion dam, referred to as Hour House, on the Middle Yuba River, which will divert water through the Lohman Ridge Tunnel to Oregon Creek. Immediately below the outlet of this tunnel, water will be diverted from Oregon Creek by the Log Cabin Diversion Dam through a proposed Camptonville Tunnel to Willow Creek which enters the North Yuba River upstream from a proposed new Bullards Bar Dam. This dam is to be located on North Yuba River approximately 1.5 miles downstream from the existing Bullards Bar Dam of Pacific Gas and Electric Company (hereinafter referred to as ‘P.G. & E.’), which will be inundated. The reservoir formed by this dam will have a gross capacity of 930,000 acre-feet. A two-unit New Bullards Bar Power Plant with a capacity of 132,000 kilowatts will be located at the downstream toe of the dam.
“New Bullards Bar Dam will be a rock-fill or concrete-arch structure. If it is to be rock-fill, the fill material will cover the site of P.G. & E’s Colgate Dam and the intake works of an existing power tunnel. This will necessitate the construction of a new dam approximately 2,700 feet downstream from the axis of the New Bullards Bar Dam, along with 3,000 feet of new tunnel to link the forebay formed by the new dam and the existing P.G. & E. tunnel. A New Colgate Tunnel, 22,400 feet in length with a capacity of 3,800 cfs, will be constructed with an intake immediately upstream from the New Colgate Dam to connect with a 2,300 foot penstock to a proposed New Colgate Power Plant. If New Bullards Bar Dam is to be a concrete-arch structure, existing Colgate Diversion Dam will create a forebay for the existing tunnel of P.G. & E., as well as the New Colgate Tunnel. The New
“An existing Narrows Dam which creates Englebright Reservoir is located approximately nine miles downstream from the Colgate Power Plant and six miles from the confluence of the South Yuba River and the Yuba River. Water will be conveyed from Englebright Reservoir to a proposed New Narrows Power Plant which will be a 41,000-kw. installation. The proposed Timbuctoo Afterbay Dam will be located approximately two and one-half miles downstream from the Narrows Power Plants. It will have a gross storage capacity of 5,700 acre-feet and will furnish regulatory storage for the purpose of serving Yuba’s proposed North and South Canals and the existing canals of the Hailwood Irrigation Company and the Cordua Irrigation District. An Irrigation Diversion Weir will divert water into proposed North Yuba and South Yuba Canals to serve lands within Yuba County.”
During the course of the board’s hearings Johnson Rancho submitted a compromise proposal calling for joint development of projects along the river by both agencies. The board’s decision describes the compromise proposal as follows: “Under this proposal for joint development, Yuba would construct Hour House and Log Cabin Diversion Dams, Lohman Ridge and Camptonville Tunnels, New Bullards Bar Dam and Reservoir, and the New Bullards Bar and New Colgate Power Plants. Johnson Rancho would construct a 320,000 acre-foot, first-stage Parks Bar Dam and Reservoir and Parks Bar Power Plant, along with what is described as a ‘small Waldo Project.’ ”
The appeal of Johnson Rancho poses a series of objections, legal and factual, to the findings and award of the State Water Rights Board.
Conformity with California Water Plan
Primary focus of Johnson Rancho’s attack is an alleged conflict between the Yuba Agency’s development program and one feature of the California Water Plan. The California Water Plan was the result of studies conducted by the California Department of Water Resources. It was published in the department’s Bulletin No. 3 in 1957. It listed
3 Three sections of the Water Code enacted by California Statutes of 1959, chapter 2053, are as follows: “In determining public interest under Sections 1253 and 1255, the board shall give consideration to any general or coordinated plan looking toward the control, protection, development, utilization, and conservation of the water resources of the State, including The California Water Plan, prepared and published by the Department of Water Besourees or any predecessor thereof and any modification thereto as may be adopted by the department or as may be adopted by the Legislature by concurrent resolution or by law.” (Wat. Code, § 1256.) ‘ ‘ The plan for the orderly and co-ordinated control, protection, conservation, development, and utilization of the water resources of the State which is set forth and described in Bulletin No. 1 of the State Water Besourees Board entitled ‘Water Besourees of California,’ Bulletin No. 2 of the State Water Besourees Board entitled, ‘Water Utilization and Bequirements of California,’ and Bulletin No. 3 of the Department of Water Besourees entitled, ‘The California Water Plan,’ with such amendments, supplements and additions as may be later necessary, shall be known as ‘The California Water Plan.’ The Department of Water Besourees shall, from time to time, adopt such amendments, supplements and additions to the plan as it finds necessary and desirable, which amendments, supplements and additions shall become effective when reported to the Legislature at any session thereof. The Legislature may also adopt, from time to time, any amendments, supplements and additions to the plan that it finds necessary or desirable, which amendments, supplements or additions may be adopted by concurrent resolution or by law.” (Wat. Code, § 10004.) “It is hereby declared that the people of the State have a primary interest in the orderly and co-ordinated control, protection, conservation, development, and utilization of the water resources of the State by all individuals and entities and that it is the policy of the State that The California Water Plan, with such amendments, supplements and additions thereto as may be necessary from time to time, is accepted as the guide for the orderly aned co-ordinated control, protection, conservation, development, and utilization of the water resources of the State. This declaration does not constitute approval of specific projects or routes for transfer of water for construction by the State or for financial assistance by the State without further legislative action, nor shall this declaration be construed as a prohibition of the development of the water resources of the State by any entity.” (Wat. Code, § 10005.)
4 As published in 1957 the plan (Bull. No. 3, pp. 110-112) stated: “Foothill development of the Yuba Biver would consist of Parks Bar Beservoir below Englebright Dam for flood control, and Waldo Beservoir, on Dry Creek, a tributary of Bear Biver, to provide off-stream storage for surplus Yuba Biver water. . . . . . [A]bout 40,000 kilowatts and 83,000,000 kilowatt-hours are considered to be creditable to the Parks Bar Power Plant, a feature of the California Aqueduct System. This takes into account the loss of *870 power at the upstream Narrows Power Plant, which eventually would be abandoned due to submergence by Parks Bar Beservoir. ’ ’
In contending that the Water Rights Board was legally powerless to award permits based upon a development which precluded construction of the Parks Bar Dam, petitioner misconstrues the plan and misconceives the Legislature’s purpose in giving it statutory sanction. At a multitude of points throughout its 26-page introduction and 246 pages of text, Bulletin No. 3 evinces the general, tentative and flexible character of the plan. In its introductory section, a communication from a board of engineering consultants endorses the recommendation of the Director of Water Resources that there be more detailed study of component features of the plan to determine their need, engineering feasibility and financial feasibility and that the plan be subject to continuing review, modification and improvement in the light of changing conditions and additional information. The engineering consultants recommend that the Legislature receive the plan as a coordinated proposal for the progressive and comprehensive future development of the state’s water resources, but that no specific project be authorized for construction without detailed investigation of engineering feasibility, economic justification and financial feasibility. (Bull. No. 3, p. xv.) It warned that the plan, as presented in Bulletin No. 3, includes “projects of doubtful economic justification and works of unproven physical feasibility.” {Ibid., p. xv.) The department’s introductory section states that the magnitude of the investigation prevented economic and financial anal
In giving statutory sanction to the plan, the 1959 Legislature expressed itself in the same general and tentative fashion. Section 1256 tells the Water Rights Board that in determining the public interest involved in water rights applications, it “shall give consideration to any general or coordinated plan . . . including The California Water Plan . . . and any modification thereto. ...” Section 10004 envisions the continuing amendment and supplementation of the plan. Notably, it permits but does not require legislative approval of amendments and modifications; rather, the simple act of a departmental report to the Legislature while it is in session suffices to effect a change in the plan. Section 10005 declares a state policy that the plan, with its amendments and supplements, is acknowledged as “the guide” to the conservation and development of the state’s water resources. As though out of an abundance of care, section 10005 states: “This declaration does not constitute approval of specific projects. ...” These provisions are quoted in full in footnote 3, supra. ■
Thus, without the slightest ambiguity, both the Legislature and the Department of Water Resources announced that the 1957 water plan was general and flexible and specific projects entirely tentative. Even so, petitioner maintains that the Water Rights Board could not eliminate a specific project unless it was first eliminated by modification of the plan. To the contrary, section 1256 directs the board only to “give consideration” to the plan. The direction to consider does no more than command the board to hold in mind and pay regard to the plan and its projects in passing on water rights applications. Having paid that regard, the board may accept or reject a specific project. It is not foreclosed from rejecting an individual project which, on close examination, turns out
There is a second and equally compelling reason for rejecting petitioner’s complaint of elimination of the Parks Bar Reservoir. On February 18, 1964, after the Water Rights Board’s decision of December 19, 1963, and shortly before Johnson Rancho commenced the present lawsuit, the Department of Water Resources filed its Bulletin No. 115 with
5 After describing Johnson Rancho’s alternative proposal for joint development by the two agencies, the decision of the Water Rights Board states: “The normal high water level of Johnson Rancho’s Parks Bar Reservoir would be approximately 200 feet higher than the elevation of Yuba’s proposed New Narrows Power Plant and would necessitate elimination of this power facility as well as P.G. & E.’s existing Narrows Power Plant. “Yuba contends that elimination of the New Narrows portion of its project would make its project infeasible and for that reason, along with others, is not agreeable to the proposal. It further contends that the overall joint project would be infeasible and that Johnson Rancho’s Parks Bar Dam and Power Plant taken alone would be 50 per cent short of financial feasibility. Johnson Rancho did not submit a project operation study to substantiate the feasibility of such a joint project. “Johnson Rancho is within the proposed service area of Yuba, and its expressed interest in constructing a project is to accomplish a higher degree of flood protection and development of the waters of the Yuba River system than that offered by Yuba’s project, in the public interest. In this regard the State Department of Water Resources has been conducting a comprehensive investigation leading to full development of the water resources of Yuba Basin which was commenced in the year 1957 and which is now in its final phase (DWR Exh. 11). The Department considers Yuba’s project a satisfactory initial stage of an overall development which will accomplish the maximum development of the waters of the entire stream system. The second stage of the development will include a 1,000,000 acre-foot Marysville Reservoir approximately five miles downstream from the Parks Bar damsite. “Johnson Rancho estimated that from 230,000 to 260,000 acre-feet of storage at a first-stage Parks Bar Reservoir would be available for flood control purposes (RT 746). No operation study was presented to establish the financial feasibility of such a reservation (RT 746). No opinion was given as to flood control benefit of a second-stage Parks Bar Reservoir; and no further investigation is planned by this applicant ‘until the question of the Narrows Project is settled.’ (RT 752).’’
In a ease such as the present the appellate court disposes of the matter in conformity with the law existing at the time of its decision. (Tulare Irrigation Dist. v. Lindsay
6 The following are excerpts of Bulletin No. 115 evincing the department’s modification of this phase of the California Water Plan: “More detailed studies of the Bulletin No. 3 plan conducted during the course of this investigation resulted in several modifications to the plan. . . .” (P. 150.) “As planning studies and comparisons of alternatives progressed, it became evident that a dual reservoir project, consisting of (1) an upstream New Bullards Bar Reservoir with feeder diversions from the Middle Tuba River and Oregon Creek and associated power generation facilities, and (2) downstream storage unit, would afford the most advantageous and economical water development. Alternative units for downstream storage would consist of (1) a Marysville Dam and Reservoir, or (2) a large Parks Bar Dam and Reservoir. “Either of these dual reservoir projects would conserve and develop new water supplies, develop the hydroelectric power potential of the Tuba River below New Bullards Bar Reservoir, provide for the control of floods, and enhance the recreation and fisheries potential of the area. “The Marysville site permits the development of a reservoir with a larger storage capacity than that available at the Parks Bar-Dry Creek site. The greater carry-over storage capacity, and the marginal feasibility of a dependable power installation below the dam due to the low average head available, would make possible the release of large quantities of water on a variable schedule to firm up the export supply from the Delta. “The Parks Bar Unit would include a powerplant at the base of the dam and would thereby further develop the power potential. As a consequence of release requirements for firm power generation, together with a smaller active storage capacity than the proposed Marysville Reservoir, no new water for export from the Delta would be realized.” (Pp. 152-153.) “The plan for initial development formulated for the [Tuba County Water] agency was essentially the same as the New Bullards Bar Unit of the lower Tuba River Project advocated by the State. “Subsequent studies conducted by the department and Tuba County Water Agency resulted in the following conclusions: . . . (3) The additional hydroelectric power developed below Englebright Dam is necessary to support local project financing from revenue bonds. “The New Bullards Bar-Marysville Project is considered to be the most practical multipurpose plan to maximize the development and utilization of the water resources of the lower Tuba River. ...” (Pp. 154-155.)
A legislative action which occurred following the Water Rights Board decision is worthy of note. In its first extraordinary session of 1964 the Legislature adopted a bill authorizing a $10,000,000 loan of state funds to' the Yuba Agency in order to finance the early construction stages of its Yuba River project, the loan to be repaid out of expected federal flood control funds. (Stats. 1965, First Ex. Sess. 1964, ch. 41.) The bill was approved by the Governor on April 27, 1964. While possibly available as a ratification of the board decision of December 19, 1963, the ratification point is superfluous since the board’s decision, as we have held, satisfied its obligation to consider the California Water Plan.
Adequacy of Findings and Evidence
“Public interest” is the primary statutory standard guiding the Water Rights Board in acting upon applications to appropriate water. (§§ 1253-1256.) The board is to consider the variety of beneficial uses which the particular water may serve and may subject the appropriation to conditions which will best develop and conserve the water in the public interest. (§ 1257.)
Johnson Rancho attacks the board’s findings, urging that the board did not “expressly” find a public interest in the grant of a permit to the Yuba Agency. Especially it claims that the board failed to find whether the Yuba Agency project will put the river to fullest beneficial use and whether it is more or less expensive than Johnson Rancho’s plan.
The findings of the Water Rights Board need not be stated with the formality required in a judicial proceeding; “their basic purpose is to enable the reviewing court to determine whether they are supported by sufficient evidence or a proper principle and to apprise the parties as to the reason for the administrative action in order that they may decide whether, and upon what grounds, additional proceedings should be initiated.” (Temescal Water Co. v. Department of Public Works, supra, 44 Cal.2d at p. 102.)
“1. The revenue from the power features of Yuba’s [Agency’s] project including the New Narrows facility together with other available funds are adequate to meet expected costs of construction of the project.
“2. Yuba’s [Agency’s] project will provide a significant measure of flood control as well as make water available for necessary multi-purpose uses and will be consistent with other plans by the State and Federal Governments for the ultimate full development of the Yuba River.
7 In this regard the board’s decision states: “Johnson Baneho has approximately 800 acres of land subject to irrigation within its boundaries requiring an estimated 4,000 acre-feet a year, which is approximately 0.3 of 1 per cent of the total yield of its proposed project (BT 927-928). There are only two families and six voters in the district (BT 616). It contemplates service to other areas within Tuba County which Tuba also proposes to serve (BT 916). However, there have been no indications from any water users within this larger local area that they wish to be served by Johnson Baneho. The principal area which Johnson Baneho proposes to serve is an indefinite 1,000,000 acres on the valley floor of the Sacramento and San Joaquin Bivers (BT 886). No definite information was submitted as to the requirements or the particular places of use within this general area (BT 807). Service to this area would necessitate the use of the State’s aqueduct system or the Bureau of Beclamation facilities. No agreement has been reached, and no negotiations are in process for the use of either of these facilities (BT 941). In addition, there has been no definite written expression of an intention to purchase water from Johnson Baneho by any user in this general area (BT 909-910).”
“4. Yuba [Agency] has shown that it can reasonably be expected to commence construction of its project promptly and to proceed with due diligence in placing the water to be appropriated to beneficial use and that approval of its applications would be in the public interest.” (Italics added.)
With respect to Johnson Rancho the “Conclusions” state:
“6. Johnson Rancho has failed to show the financial feasibility of either its project or the joint project proposed by it, or that it is able to construct its project and place water to beneficial use in the manner described in its applications.
“. . . that approval of applications 15560, 15585, 15656, 15700, 15873, 15930, 15944, and 15945 of Johnson Rancho would not be in the public interest, and these applications should be denied in their entirety. ’ ’
In view of the board’s conclusions (really findings) the argument that the board did not “expressly” find on the public interest factor is nothing but a quibble. The board found that Yuba Agency had demonstrated a public interest, that Johnson Rancho had not. The remaining recitals and conclusions are simply evidentiary auxiliaries to this finding of ultimate fact. The language employed by the board amply evinces a factual judgment on the criterion of public interest established by Water Code sections 1253-1257. The board’s decision likewise satisfies the criteria for administrative findings enunciated in the Temescal Water Co. ease, supra.
Johnson Rancho attacks the evidentiary basis for these findings. The Legislature has entrusted the allocation of the state’s uncommitted water resources to the Water Rights Board, not to the courts. Unless it can be demonstrated that the board’s actions are not grounded upon any reasonable factual basis the courts should not interfere with its discretion or substitute their discretion for that of the board. (Ferrante v. Fish & Game Com., 29 Cal.2d 365 , 374 [ 175 P.2d 222 ]; see Temescal Water Co. v. Department of Public Works, supra, 44 Cal.2d at p. 102.)
The record of the administrative hearing shows that
The evidentiary recitals also make it clear that major factors in the board’s decision were the less advanced stage of Johnson Rancho’s planning, its professed need for future studies, the deficiencies in its financial feasibility data, its lack of readiness to proceed with actual financing and construction and the cloudy character of its revenue expectations. Quite aside from the abstract virtues of Johnson Rancho’s project proposals, these factors constituted substantial evidence that its proposed appropriation was not in the public interest.[8]
8 Water Code section 1255 provides: “The board shall reject an application when in its judgment the proposed appropriation would not best conserve the public interest. ’ ’
Validity of Yuba Agency’s Water Bights Applications and Amendments Thereto Of Tuba Agency’s six applications to appropriate water, two (Nos. 5631 and 5632) had been assigned to it by the California Water Commission. These applications had originally been filed by the Department of Finance pursuant to the Feigenbaum Act (Cal. Stats. 1927, ch. 286[9] ), which directed the department to “make and file an application or applications for any water or the use thereof which in the judgment of the state department of finance is or may be required in the development and completion of the whole or any part of a general or coordinated plan looking towards the development, utilization or conservation of the water resources of the state.” Sections 10504 and 10504.1 authorize the California Water Commission, after notice and hearing, to assign such applications when the assignment is “for the purpose of development not in conflict with such general or co-ordinated plan.” Johnson Rancho asserts that the assignments are void because they contemplate a development which conflicts with the California Water Plan in precluding use of the proposed damsite at Parks Bar.
The argument is essentially a repetition of that considered earlier in this opinion and is rejected for the same reasons.
The assignments recite that Tuba Agency “. . . proposes to construct and operate a water and power development project in the Tuba River Basin consisting of a New Bullards Bar Dam and Reservoir and associated power and
9 This act, as amended, is now codified as Water Code sections 10500-10507. Language similar to that quoted infra is contained in section 10500.
Johnson Rancho further contends that amendments made to the other four applications filed by the Yuba Agency (Nos. 15204, 15205, 15603, 15574) are void because rule 738 (Cal. Admin. Code, tit. 23, § 738) of the board requires the petitioner for such an amendment to show “that the allowance of the proposed change will neither in effect constitute the initiation of a new right nor operate to the injury of any other appropriator or lawful user of water.” It is asserted that the amendments initiate a new right because they change the location of certain storage areas and eliminate others. The Water Rights Board argues that “a change in place of storage (point of diversion) may be made within the scope of an existing application so long as the quantity of water applied for is not increased. If the change involved the appropriation of more water or taking water from a different river system, the rule against the initiation of a new right would apply to prevent the change.” Johnson Rancho does not contend that the amendments allowed the appropriation of an increased amount of water. The board’s interpretation is consistent with a commonsense view of the Water Code provisions on assignment.
The four applications last mentioned had originally been filed by Yuba County. The Yuba Agency pursued these applications before the Water Rights Board as assignee of the county. At the hearing before the board Johnson Rancho claimed that Yuba County had originally filed these applications in trust for the Wheatland Water District, which had in turn transferred its interest in these applications to Johnson Rancho. At the time it made these contentions before the Water Rights Board, Johnson Rancho had a lawsuit pending against Yuba County and the Yuba Agency to establish its
Johnson Rancho now asserts that the Water Rights Board erred in refusing to entertain evidence of its ownership of these four applications. We certainly do not propose to remand this proceeding to the Water Rights Board for determination of a claim which had been fruitlessly pressed in the courts. Although the judgment in Johnson Rancho County Water Dist. v. County of Yuba, supra, was one rendered following the sustaining of a demurrer, it was reached because the plaintiff effectually confessed that it could not demonstrate its ownership. The circumstances of that suit were such as to make the judgment one on the merits. It is therefore res ad judicata. Johnson Rancho will not be heard to litigate the question anew. (See DeMonbrun v. Sheet Metal etc. Assn., 140 Cal.App.2d 546 , 554-555 [ 295 P.2d 881 ] ; 29 Cal.Jur.2d, Judgments, § 234.)
Petitioner has failed to demonstrate error on the part of the State Water Rights Board or on the part of the lower court in denying its application for a writ of mandate. The judgment is therefore affirmed.
Pierce, P. J., and Regan, J., concurred.
10 Title 23, California Administrative Code, section 767, provides: "The board will not undertake to determine contests as to ownership of rights initiated by applications to appropriate water, its only concern being to maintain such a record of ownership as will facilitate communication with owners when necessity demands. The board will ordinarily accept any claim which is asserted to ownership of an application, permit or license unless the record title holder, or an asserted successor in interest, objects. When a contest develops as to ownership the board will not ordinarily change its record until the matter is either determined by a court or adjusted to the mutual satisfaction of the parties, unless evidence of continued occupation, use, or control justifies a different course."
Cases cited
- Temescal Water Co. v. Department of Public Works 44 Cal.2d 90 at 106 p. 866
- Southern California Jockey Club, Inc. v. California Horse Racing Board 36 Cal.2d 167 at 174-175 p. 866
- Tulare Irrigation District v. Lindsay-Strathmore Irrigation District 3 Cal.2d 489 at 526-530 p. 874
- Ferrante v. Fish & Game Commission 29 Cal.2d 365 at 374 p. 876
- Johnson Rancho County Water District v. County of Yuba 223 Cal.App.2d 681 p. 880
- DeMonbrun v. Sheet Metal Workers International Ass'n 140 Cal.App.2d 546 at 554-555 p. 880