Majority
The defendants have appealed from a judgment in favor of plaintiff, rendered pursuant to an order sustaining a demurrer to the amended answer without leave to amend the pleading. The judgment restrains defendants from constructing or maintaining an automobile garage and repair shop on plaintiff’s right of way and easement beneath the wires and electric lines on and across defendants’ land. The building in question was constructed of concrete blocks by the owners of a lot, to replace a frame building which had previously existed thereon beneath the electric wires of a power line which plaintiff’s complaint alleges was constructed by it along the center line of its 40-foot right of way and easement across the property of defendants Christino Minnette (Cristino Minnitte) and Mary T. Minnette in Solano County. The poles and wires were maintained by plaintiff to supply electric light and power to the residents in that vicinity.
The defendants contend that their amended answer adequately presents issues regarding the location of their building and other equitable issues which entitle them to a hearing on the merits, and that the court abused its discretion in sustaining the demurrer without leave to amend.
This suit is equitable in nature. It was brought to quiet title to an easement across a lot, and to enjoin the successors in interest of that lot from maintaining thereon a concrete building which they constructed in 1947.
The amended complaint which was filed in Solano County December 3, 1947, alleges plaintiff is a public utilities corporation engaged in the business of furnishing electric lights
Separate demurrers to the complaint were overruled. The defendants joined in an answer to the amended complaint, setting up an issue of fact regarding the true location of the easement, and equitable defenses, including those of estoppel and laches. The amended answer states that “said concrete building so erected does not cover the entire portion of said alleged right of way but only a portion thereof and the same does not interfere with the ingress and egress of the said plaintiff.” But the answer further denies the other material
The plaintiff filed a general demurrer to that amended answer on the sole ground that it fails to state facts constituí
The vital questions to be determined are whether the answer raises a valid issue of fact as to whether the concrete building was constructed on plaintiff’s right of way and easement beneath the wires, and whether the allegations of the answer present equitable issues, or are susceptible of amendments presenting such issues, which would require a trial on its merits and the adoption of findings to support a judgment to that effect.
The appellants insist that the pleadings present issues of fact and equitable defenses which should be determined on the merits, and that it is unjust and inequitable, under the circumstances of this case, to require them to remove said concrete block structure at great labor and expense, since it was under construction during a period of eight months with full knowledge of plaintiff, and without objection on its part. The appellants assert that the court erred in sustaining the demurrer without leave to amend.
We are persuaded the court erred in sustaining the demurrer to the amended answer in this case without leave to amend the pleading. The answer presents an issue of fact as to whether the defendants’ building was constructed on plaintiff’s right of way and easement. It also alleges an equitable defense. At least the amended answer attempts to allege those issues which, if defectively stated, should entitle defendants to amend their pleading. It follows that the court abused its discretion in sustaining the general demurrer without leave to amend the pleading. The general demurrer was filed under sections 443 and 444 of the Code of Civil Procedure on the sole ground that the answer “does not state facts sufficient to constitute a defense.” It did not assert that the pleading is uncertain, ambiguous, unintelligent, frivolous or defective in form. There was no motion to strike out the answer, or any portion thereof, on the ground that it is uncertain or frivolous. The last-mentioned defects, if any such exist, were therefore waived.
The respondent contends that paragraph IV of the answer fails to state a valid defense because it merely alleges “on information and belief” that the building was not con
The respondent correctly states the general rule with respect to pleadings based on information and belief, that when a fact may be readily ascertained by inspection of a public record it cannot be made an issue by mere allegations or denials based on information and belief. (Art Metal Construction Co. v. A. F. Anderson Co., 182 Cal. 29 , 33 [ 186 P. 776 ] ; Santa Barbara Limber Co. v. Ross, 183 Cal. 657 , 659 [ 192 P. 436 ] ; Smith v. Fidelity & Deposit Co. of Maryland, 130 Cal.App. 45 , 58 [ 19 P.2d 1018 ] ; Brooks v. Nelson, 95 Cal.App. 144 , 149 [ 272 P. 610 ] ; 21 Cal.Jur. § 101, p. 150; 49 C.J. § 333, p. 266; 1 Bancroft’s Code Pleading, § 415, p. 607.) Our attention has not been called to any case, and we have been unable to find one, which holds that merely because a deed or grant of an easement has been recorded the issue as to whether a restriction therein contained has been violated, may not be alleged or denied on information and belief. The question as to whether a building or obstruction was or was not constructed on the easement does not appear from an inspection of the grant. Ordinarily, that fact cannot be readily ascertained by a mere inspection of the record. We are not prepared to hold that under such circumstances the recording of the instrument requires a pleader to survey the easement to definitely ascertain the fact before he may raise that issue. But, regardless of whether that rule applies, it appears to be immaterial in the present ease because paragraph VI of the answer positively and definitely denies “that said building was constructed upon the said easement and right of way, ’ ’ or that the right of way was obstructed thereby in any manner or at all. Certainly, the last-mentioned denial and allegation of the amended answer properly raise that issue. The answer does admit that a portion of the building was constructed “beneath the wires.” But, in view of the denial that it was built upon the easement, and the affirmative allegation that the line of poles and wires were erected on property other than that described in the easement, we think the issue is clearly raised as to whether the building invades any rights vesting in plaintiff by its grant to the easement.
We conclude that paragraph VI of the answer raises issues which should be determined by the court, and that the demurrer should not have been sustained without leave to amend the answer.
Moreover, we are of the opinion the estoppel in pais and the equitable defense raised by the answer that the plaintiff, with full knowledge of the construction of the basalt block building by defendants at great cost over a period of some eight months, without objection on the part of plaintiff, entitled defendants to have those issues determined. It is apparent that defendants may have been reasonably misled by the fact that Cristino and Mary T. Minnette acquired their lot in 1945, with the frame building thereon which had been previously maintained beneath the wires for several years and by the fact that the title company had reported to them that their lot was free and clear of all encumbrances, liens or easements, and that, without protest or notice from plaintiff, they were permitted to tear down the frame building in 1947 and to replace it, without objection or protest, with the basalt block building. Without determining those alleged equities, the injunction restrains defendants from maintaining that concrete building, the removal of which will necessarily result in great loss of labor and expense. -
In view of our foregoing conclusion, it is unnecessary to determine whether the covenant contained in the grants of easements to the effect that “the parties of the first part” will not construct any building on said easements beneath the wires, is binding upon the grantors’ assigns or successors in interest.
The appellants contend that since the covenants do not state that the assigns or successors in interest shall not construct such buildings on the easements beneath the wires, the covenants are therefore ' purely personal, applying to the grantors only, and that they do not run with the land or bind the assigns or successors in title. In support of that contention, appellants cite Pythian Castle Assn. of Sacramento v. Daroux, 172 Cal. 510 [ 157 P. 594 ], and Frederick v. Louis, 10 Cal.App.2d 649 [ 52 P.2d 533 ], In the Daroux case, the covenant in a deed which was sought to be enforced against a successor in interest of the grantor was much more explicit
Nor do we deem it necessary to pass upon other issues presented by the appellants on this appeal.
For the foregoing reasons we are impelled to hold that the court abused its discretion in sustaining the demurrer of plaintiff to defendants’ answer.
The judgment is reversed and the court is directed to overrule the demurrer.
Adams, P. J., and Peek, J., concurred.
A petition for a rehearing was denied July 14, 1949, and respondent’s petition for a hearing by the Supreme Court was denied August 11,1949.
Cases cited
- Art Metal Constr. Co. v. A. F. Anderson Co. 182 Cal. 29 at 33 p. 406
- Santa Barbara Lumber Co. v. Ross 183 Cal. 657 at 659 p. 406
- Smith v. Fidelity & Deposit Co. 130 Cal.App. 45 at 58 p. 406
- Brooks v. Nelson 95 Cal.App. 144 at 149 p. 406
- Pythian Castle Ass'n of Sacramento v. Daroux 172 Cal. 510 p. 407
- Frederick v. Louis 10 Cal.App.2d 649 p. 407