Majority
STATEMENT OF THE CASE AND FACTS
The 100-unit condominium project at issue in this case was owned and used by Shell as a fuel distribution terminal from 1925 until 1980. Petroleum products were delivered to the property by pipeline and railcar, and stored in both above ground and underground storage tanks with a total capacity of 69,730 barrels (2,028,660 gallons). In 1980, the property was purchased by Simmons Terminal Corporation (Simmons), which continued to use it as fuel distribution terminal for several years. In 1985, the property was purchased by the John E. and Charlene A. Weber Trust, for use by their demolition contracting business, ICONCO, Inc. ICONCO continued to use two of the above ground storage tanks and demolished the others, leaving underground pipelines and facilities in place. In June 2003, the site was acquired by Signature at the Estuary, LLC (Signature) for the purpose of building a residential townhouse development.
In anticipation of acquisition and development, Signature's environmental consultant, Lowney Associates, reviewed the history of the site and submitted a Corrective Action Plan to the California Regional Water Quality Control Board (Water Board) in October 2002. According to the Water Board's findings, releases from the former bulk fuel terminal had first been reported in 1942[2] and investigations of soil and groundwater at the site in 1982,[3]
1 A 1942 report for the Division of Fish and Game Bureau of Fish Conservation mentioned that an oil separator was being installed at Shell's Oakland distributing depot "after an investigation of oil reaching the estuary was traced to this concern."
2 In 1982, then-owner Simmons was required by the Water Board to determine the source of an oily sheen emanating from a storm drain discharging into the estuary from the site. Three exploratory borings were drilled and converted into ground water monitoring wells, and additional monitoring wells were installed in 1985.
Deed restrictions were recorded by Signature in November 2004 that detailed the history of contamination and cleanup activities at the property, set forth restrictions on development and use of the property, and required future owners and occupants to execute a written instrument to accompany all purchase agreements or leases related to the property stating recognition that the property "contains hazardous materials in soils and in the groundwater" and is subject to the deed restriction. The CCRs for the development, recorded in September 2004, specifically referenced the contamination at the property, the 2004 Water Board order and the risk management plan.[5] A 2004
4 The CCRs described the Water Board order, imposed an easement for action necessary to implement requirements of the order and achieve its goals, included compliance with the order and risk management plan among the enumerated use restrictions for the property, and required the EOA to notify contractors and employees about specified portions of the risk management plan.
The condominiums were built between 2004 and 2006. In depositions, one purchaser of a condominium stated that he was told at the time of purchase that contaminants at the site had been fully remediated, another said he was assured the environmental remediation mentioned in the documents was "routine for any development around the Bay Area," and another said he was rushed through the paperwork and told everything in it was "boilerplate."
6 It was additionally specified that Signature would pursue third parties such as Simmons, which was responsible for a subsurface release at the property, for costs incurred in connection with such releases and that the settlement payment was based primarily on costs and damages incurred by Signature other than in connection with historic underground storage tank releases. Shell waived any claim for reimbursement from the Tank Fund relating to the property.
The initial complaints in this case were filed by EOA on December 8, 2010; by Elaine Kammerer and other homeowners on the same date; and by Beverly Angros and other homeowners on May 3, 2012. Shell was not initially named as a defendant in the EOA and Kammerer actions but, as the
The two causes of action for nuisance alleged that all the defendants interfered with plaintiffs' use and enjoyment of the property by "developing, designing, and/or constructing, contaminating, occupying and maintaining the Subject Property in an area where the soil, air and water is contaminated and harmful to health and safety and was not properly cleaned and/or decontaminated prior to the construction of the Subject Property." It was further alleged that the interference was substantial and unreasonable and required plaintiffs to incur significant expenses for remediation to mitigate, reduce or abate the harm, and that the harm to the property was continuing. The cause of action for public nuisance additionally alleged that the nuisance affected others who were not plaintiffs in the action and that the seriousness of the harm outweighed any public benefit.
The last cause of action applicable to Shell, negligence per se, alleged that all the defendants were involved with the design and construction of the development in similar terms to the allegations of the negligence cause of action,[16] and that their conduct violated various codes, regulations, statutes and/or ordinances establishing minimum building standards and prohibiting "certain activities to prevent and/or mitigate against contamination of soil, air and water" in order to "safeguard life, health, property, and public welfare" and protect plaintiffs and others similarly situated from the type of injury alleged in the complaint.
Shell answered the complaints, denying the allegations and raising a number of affirmative defenses. On September 9, 2014, Shell moved for summary judgment or summary adjudication, arguing that the causes of
15 Specifically, it was alleged that the defendants were "designers, developers, builders, contractors, subcontractors, suppliers, manufacturers, or were other persons, entities or professionals who participated in the process of construction and/or repair and/or renovation and conversion of the Subject Property and who performed works of labor and manufactured and/or supplied materials, equipment, and/or services necessary for the construction, including supervision of construction of the Subject Property or were prior owner, lessors, lessees, users and/or occupiers of the Subject Property."
On March 5, 2015, the day set for hearing on Shell's motion for summary judgment, appellants filed a motion for leave to file a third amended complaint. Appellants had reached settlements with the Developer Defendants, Design Professionals and Subcontractors, and the proposed amendment sought to delete the parties that had settled and two causes of action; add a cause of action for trespass; add Simmons, which appellants indicated had been added as a Doe defendant on July 9, 2013, but "erroneously omitted from the caption of the second amended complaint";[18] and identify certain Doe defendants (Shell California Pipe Line Corporation, Shell Pipeline Company, L.P, Shell Pipeline GP, LLC, Shell California Pipeline Company, LLC and Shell California Pipeline Company).
The trial court heard arguments on Shell's motion for summary judgment and took it under submission. On March 12, 2015, the court granted the motion for summary judgment, finding that the negligence causes of action were not supported because Shell owed no duty of care to appellants and were barred by the applicable three-year statute of limitations, and that all the causes of action were barred by the 10-year statute of repose for latent construction defects.[19] Judgment for Shell was entered on March 26, 2015.
17 The court noted in its order granting summary judgment that on February 5, 2014, over Shell's objection, the court had granted appellants' application to substitute these affiliates of Shell as Doe defendants, with the amendments to be filed no later than February 24, 2015, but that appellants did not appear to have filed the proposed amendments prior to the filing of the motion for summary judgment.
18 The trial court denied the motion as to Shell's additional arguments.
The court issued its tentative ruling denying the new trial motion on May 21, 2015, and, after a hearing, entered its order denying the motion on May 27, 2015.
Appellants filed their timely notice of appeal on June 24, 2015.
DISCUSSION
Appellants contend the trial court erroneously read their complaints as alleging claims against Shell based on construction defects, whereas in fact the gravamen of their claims is Shell's "negligent mishandling of petroleum products and subsequent failure to remediate, which created a continuing nuisance." As a result of this misreading, appellants assert, the trial court erroneously applied section 337.15 to bar all their claims. Additionally, they argue that the trial court, in finding their negligence claims barred by the three-year statute of limitations, failed to recognize that the claims were for new and different damage to their property than that associated with Shell's pre-1980 activity on the site. Appellants maintain that they did not experience "appreciable harm" to their property until their units and common areas were contaminated by the spread of Shell's contamination to the new fill and top
" 'This court reviews de novo the trial court's decision to grant summary judgment and we are not bound by the trial court's stated reasons or rationales. ( Prilliman v. United Air Lines, Inc. (1997) 53 Cal.App.4th 935 , 951 [ 62 Cal.Rptr.2d 142 ] )' ( Hersant v. Department of Social Services (1997) 57 Cal.App.4th 997 , 1001 [ 67 Cal.Rptr.2d 483 ] ( Hersant ).)" ( Horn v. Cushman & Wakefield Western, Inc. (1999) 72 Cal.App.4th 798 , 805, 85 Cal.Rptr.2d 459 .) "In performing our de novo review, we must view the evidence in a
Gaggero did not elaborate upon its references to the defendant's "construction or operation" of the landfill or explain why "operation" of an improvement would come within the terms of section 337.15. The issue in that case was whether the landfill was an "improvement" within the meaning of section 337.15. The court observed that the "broad interpretation" cases had given to the term "improvement" was consistent with the history and purpose of section 337.15 to " ' "protect developers of real estate against liability extending indefinitely into the future." ' " ( Gaggero , supra , 124 Cal.App.4th at pp. 616-617, 21 Cal.Rptr.3d 388 , quoting Martinez v. Traubner (1982) 32 Cal.3d 755 , 760, 187 Cal.Rptr. 251 , 653 P.2d 1046 .)
The only other case we are aware of that refers to section 337.15 as applicable to a defendant's "operation" of an improvement is a later decision by a different panel of the same court that decided Gaggero , also involving a landfill, which quotes Gaggero on this point. ( San Diego Unified School Dist. v. County of San Diego (2009) 170 Cal.App.4th 288 , 87 Cal.Rptr.3d 796 ( San Diego Unified ).) In San Diego Unified , the county had operated a landfill on property leased from the school district; after the landfill ceased operation, the school district built a school on the property. ( Id. at p. 295, 87 Cal.Rptr.3d 796 .) When environmental legislation enacted years later led to the imposition of monitoring and cleanup responsibilities, the parties entered an agreement dividing these between them. ( Ibid. ) Ultimately, the school district sued the county, alleging various causes of action based on alleged violations of the agreement and interference with the school district's use of the property. ( Id. at pp. 296-297, 87 Cal.Rptr.3d 796 .) San Diego Unified held that the landfill was an "improvement" within the meaning of section 337.15, but reversed the trial court's order finding all the claims barred because the claims went "beyond those of damage caused by a latent deficiency in an improvement to real property," instead alleging violations of the parties' cost sharing agreement and obligations imposed by environmental legislation and regulations that would apply even if the landfill was designed, constructed and operated perfectly. ( San Diego Unified , at pp. 305-306, 308-311, 87 Cal.Rptr.3d 796 .)
Like Gaggero , San Diego Unified did not elaborate upon the reference to "operation" of the improvement falling within the reach of section 337.15.
In our view, these cases cannot be taken outside the context of landfills to conclude that "operation" of an improvement to real property after it has been fully constructed comes within the ambit of section 337.15. The purpose of section 337.15 and its definition of the "substantial completion" that begins the running of the 10-year period make clear that the statute's protection applies to claims for damage due to defects in how an improvement was designed and constructed, not to claims based on how the improvement was used after its construction is complete and independent of the manner in which it was designed and constructed. For this reason, the trial court in the present case erred in holding that to the extent appellants' claims were based upon "fuel spills during the operation of the fuel terminal, not upon faulty construction of the terminal," they would still be barred by section 337.15.
Section 337.15 can bar only claims alleging injury caused by latent construction defects. ( San Diego Unified, supra, 170 Cal.App.4th at p. 301, 87 Cal.Rptr.3d 796 .) As summarized in San Diego Unified , section 337.15 bars "(a) an untimely action for damages (b) based on a latent deficiency in construction of an improvement, (c) or based on property injury arising out of any such latent deficiency." ( San Diego Unified, at pp. 301, 305-306, 87 Cal.Rptr.3d 796 ; Chevron U.S.A. Inc. v. Superior Court (1994) 44 Cal.App.4th 1009 , 1015, fn. 2, 54 Cal.Rptr.2d 324 ( Chevron ).) The San Diego Unified
20 The San Diego Unified court noted that it did not interpret this statement in Gaggero as limiting coverage under section 337.15 to situations in which the property at issue has been transferred. ( San Diego Unified, supra, 170 Cal.App.4th at p. 304, 87 Cal.Rptr.3d 796 .)
22 Shell argues that appellants' opening brief offers a "strawman argument" to "manufacture error where none exists" by claiming Shell was not protected by section 337.15 because it was not involved in constructing the condominium development and was not within the "protected class" of section 337.15 that extends to developers, not owners or occupiers of land. As we understand it, appellants' point was not that section 337.15 only protects "developers of real estate" and never land owners or occupiers, but that they never claimed Shell was liable based on its having developed a defective improvement, only that its activities as a landowner and occupier caused the alleged contamination.
Moreover, we are unable to find support in the record for the trial court's conclusion that appellants "disclaimed" reliance on the "prior contamination" theory in favor of a theory that Shell's liability was based on its failure to disclose the extent of contamination and failure to comply with the duties imposed after the Board named it a responsible party in 2011. The court cited
Pursuant to the 2002 corrective plan and additional plans approved by the Board, cleanup activities were performed between September 9 and December 18, 2003. These included excavation of an approximately 80,000 square foot area of petroleum-impacted soil to depths ranging from 7 to 12 feet, treatment with "oxygen release compound" to help degrade petroleum hydrocarbons, and backfill with soil that did not exceed the site cleanup goals.
As of March 2004, Water Board staff concurred that the first four of six elements in the corrective plan had been completed. In June 2004, the Water Board issued Order No. R2-2004-0046, "Adoption of Final Site Cleanup Requirements" for the site. Signature was named as a discharger "because it owned the property
3 Additional borings/monitoring wells were installed in 1985 in response to Water Board requirements. A 1987 compliance monitoring report required ICONCO to continue operating the " 'seawall drainage system' and oil-water separator, and that absorbent booms continue to be used in the estuary around the storm drain outfall.' " ICONCO periodically pumped impacted ground water from the wells.
In October 2004, Signature sought reimbursement from Shell for its costs related to the contamination.[6] In July 2005, Signature and Shell executed a settlement agreement in which Shell denied Signature's allegations that its operations on the property caused and contributed to environmental contamination but agreed to pay Signature $1,250,000. Shell and Signature each released the other from all claims for "Covered Costs" incurred by the other relating to the property, defining "Covered Costs" as "(i) all costs and other losses incurred prior to [July 1, 2005] associated with the presence, release, migration, removal or remediation of the Contamination; (ii) groundwater monitoring costs at the Property incurred after the Effective Date up to but not to exceed $40,000; and (iii) agency fees and costs relating to environmental oversight of the Property incurred after [July 1, 2005] up
5 Signature was also pursuing reimbursement from the California Underground Storage Tank Cleanup Fund.
In June 2011, the Water Board issued Order No. R2-2011-0038, amending the 2004 order by adding Shell as a named responsible party.[8] Shell had not been named previously because the current owner, Signature, was actively involved with site cleanup, but Signature had informed the Water Board that it did not have the financial capacity to fulfill its obligations under the final cleanup order.[9] The order amended the groundwater cleanup standards to protect "drinking water beneficial use" that had previously not been included because it had been determined that site groundwater did not qualify as a potential source of drinking water, and added soil gas cleanup standards because monitoring performed after remedial
7 Signature Properties, Inc., was also named as a discharger "because it was so closely related to Signature at the Estuary, LLC, that the two entities effectively functioned as one." Signature Properties, Inc., had begun work with the Board before Signature at the Estuary, LLC, was formed and acquired the property.
8 The Board's order stated that Shell had been the owner and operator of the fuel distribution terminal from 1925 to 1980 and owned two associated product pipelines that were used to deliver petroleum products to the terminal; that releases from the terminal had first been reported in 1942, that "an oil recovery system consisting of extraction wells, stormwater drainage controls, oil-water separator and oil absorbent booms" reportedly had been operated at the property from the early 1970s to the late 1980s, and that in addition to fuel tanks and appurtenances on the site, "a suspected source of residual petroleum contamination at the site is impacted soil and/or groundwater as a result of leakage from Shell's pipelines."
The operative complaints named the same defendants, grouped into four categories: "Developer Defendants" (Signature, Signature Properties, Inc., Signature Development Group, Inc., Signature Homes, Inc., James C. Ghielmetti and Michael J. Ghielmetti),[10] "Design Professionals" (TRC Lowney Inc., TRC Solutions, Inc. and KTGY Group, Inc.),[11] "Subcontractors" (Gonsalves & Santucci, Inc., d/b/a ICONCO),[12] and "prior owners, lessors, lessees and/or users of the Subject Property" (Shell, John Weber and Charlene Weber, individually and as trustees of the 1994 John E. Weber and Charlene A. Weber revocable trust, and ICONCO).[13] With respect to Shell, the only defendant involved in this appeal, the complaints all alleged causes of action for negligence, private nuisance and public nuisance, and EOA additionally alleged a cause of action for negligence per se.
The complaints[14] alleged that all the defendants "participated in the development,
9 Each of these defendants was alleged to be "doing business as a contractor, developer, producer and/or seller of homes and/or residences," and the Ghielmettis were alleged to be alter egos of the "entity Developer Defendants."
10 These defendants were alleged to be "doing business designing, supervising, doing general and specialty contractor and subcontractor's work, providing engineering and architectural services, for the construction of residential real property," and the TRC defendants were alleged to have had responsibility for "remov[ing] contaminated soil from the Subject Property."
11 This defendant was alleged to do "general and specialty contractor and subcontractor's work, for the construction of residential real property."
12 Shell was described as "in the business of the manufacture, distribution and sale of petroleum products and is and was a prior owner, lessor, lessee and/or user of the Subject Property as a bulk fuel/petroleum storage and/or distribution site."
13 For simplicity, we will refer to EOA's second amended complaint as representative, and as "the complaint." Any material differences in the other operative complaints will be indicated as relevant. In addition to the causes of action noted in the text, which were alleged against the other defendants as well as Shell, all the operative complaints alleged causes of action against defendants not including Shell: breach of express warranty, negligent misrepresentation, breach of contract and fraud/non-disclosure (against the Developer Defendants), breach of implied warranty and breach of contract/third party beneficiary (against the Developer Defendants, Design Professionals and Subcontractors), and strict liability/products liability (against the Developer Defendants and Subcontractors). EOA also alleged causes of action for strict liability (against the Developer Defendants) and strict liability/products liability (as to the Developer Defendants and Subcontractors). The individual plaintiffs alleged a cause of action for unfair business practices (Civ. Code, §§ 17200, 17500) against the Developer Defendants that was not alleged in EOA's complaint.
The cause of action for negligence alleged that all the defendants "participated in the development, design, construction, renovation, repair and/or sale of the Subject Property, and/or performed repairs and/or major renovations or improvements and/or in the manufacture and/or supply of materials and components which were made a part of the Subject Property," or "performed works of labor and manufactured and/or supplied materials, equipment, and/or services necessary for the construction, including supervision of construction of the Subject Property, or were prior owners, lessors, lessees, users and/or occupiers of the Subject Property." Based on having undertaken
14 EOA's complaint included detailed allegations concerning specific deficiencies in the construction of the project, alleged against the Developer Defendants only. These allegations were not included in the complaints of the individual plaintiffs.
16 Further statutory references will be to the Code of Civil Procedure unless otherwise specified.
Appellants filed a motion for new trial on April 24, 2015, asking the court to vacate its judgment with respect to application of the 10-year statute of repose under section 337.15 to the claims of continuing nuisance. Appellants argued that the statute of repose could apply only if construction defects attributable to Shell in the capacity of a developer were the sole proximate cause of contamination, and there was no evidence this was the case. Appellants emphasized that Shell was sued in its capacity as a prior owner, lessor, lessee and/or user of the property and excluded from the definition of "Developer Defendants," and argued there was no evidence that the contamination that occurred during Shell's ownership of the property was due to construction defects in the design or development of the property attributable to Shell as opposed to Shell's activities in operating on the site, such as oil spills documented in the record. Shell maintained it was only required to show that it developed the property and suit was filed more than 10 years after the terminal was completed, and the burden then shifted to appellants to raise a triable issue of
"A motion for summary judgment 'shall be granted if all the papers submitted show that there is no triable issue as to any material fact and that the moving party is entitled to a judgment as a matter of law.' ( Code Civ. Proc., § 437c, subd. (c).) A defendant moving for summary judgment has the initial burden of showing either that one or more elements of the cause of action cannot be established or that there is a complete defense. ( § 437c, subd. (p)(2).)" ( Perry v. East Bay Regional Park Dist. (2006) 141 Cal.App.4th 1 , 8, 45 Cal.Rptr.3d 477 .) "The moving party must show that under no possible hypothesis within the reasonable purview of the allegations of the complaint is there a material question of fact which requires examination by trial." ( Chevron U.S.A., Inc. v. Superior Court (1992) 4 Cal.App.4th 544 , 548, 5 Cal.Rptr.2d 674 , overruled on other grounds in Camargo v. Tjaarda Dairy (2001) 25 Cal.4th 1235 , 1245, 108 Cal.Rptr.2d 617 , 25 P.3d 1096 ; Shapiro v. Sutherland (1998) 64 Cal.App.4th 1534 , 1543, 76 Cal.Rptr.2d 101 .) "If that initial burden is met, the burden shifts to the plaintiff to show the existence of a triable issue of fact with respect to that cause of action or defense. ( § 437c, subd. (p)(2) ; see Aguilar v. Atlantic Richfield Co. (2001) 25 Cal.4th 826 , 850-853 [ 107 Cal.Rptr.2d 841 , 24 P.3d 493 ].)" ( Perry , at p. 8, 45 Cal.Rptr.3d 477 ; Asplund v. Selected Investments in Financial Equities, Inc. (2000) 86 Cal.App.4th 26 , 36, 103 Cal.Rptr.2d 34 .) "When the defendant, as the moving party, makes that showing, the burden of proof shifts to the plaintiff, as the opposing party, to show, by responsive separate statement and admissible evidence, that triable issues of fact exist. ( Lorenzen-Hughes v. MacElhenny, Levy & Co. (1994) 24 Cal.App.4th 1684 , 1688 [ 30 Cal.Rptr.2d 210 ] ; Code Civ. Proc., § 437c, subd. (o)(2).) ' "[An] issue of fact becomes one of law and loses its triable character if the undisputed
19 Appellants also contend the trial court erred in finding Shell had no duty to avoid or remediate contamination on the site. As will be seen, our resolution of other issues makes it unnecessary for us to reach the question of duty.
I
Section 337.15, subdivision (a), provides: "No action may be brought to recover damages from any person, or the surety of a person, who develops real property or performs or furnishes the design, specifications, surveying, planning, supervision, testing, or observation of construction or construction of an improvement to real property more than 10 years after the substantial completion of the development or improvement for any of the following: [¶] (1) Any latent deficiency in the design, specification, surveying, planning, supervision, or observation of construction or construction of an improvement to, or survey of, real property. [¶] (2) Injury to property, real or personal, arising out of any such latent deficiency."
The trial court, in finding that section 337.15 barred this action, viewed appellants' claims as based on Shell's pre-1980 "development and use" of the property as a bulk fuel terminal. Appellants contend the trial court misread their complaints, arguing, as they did in the trial court, that their claims against Shell are based on the theory that the property became contaminated as a result of fuel spills over the course of the many years Shell operated a fuel distribution facility on the site, not due to any defect in the design or construction of the facility itself. In their view, section 337.15 has no application because they do not allege that Shell's liability is related to a construction defect. They further contend the trial court erred in applying
Section 337.15, by its terms, does not extend protection to a person or entity who operates an improvement to real property once it has been constructed, only to one who " develops real property or performs or furnishes the design , specifications, surveying, planning, supervision, testing, or observation of construction or construction of an improvement." ( § 337.15, subd. (a), italics added.) In addition to its express language, this is evident from the statute's provisions that the 10-year limitations period begins to run upon "the substantial completion of the development or improvement" ( § 337.15, subd. (a) ) and "not later than" the earliest of four dates: "final inspection by the applicable public agency," "recordation of a valid notice of completion," "use or occupation of the improvement," or "[o]ne year after termination or cessation of work on the improvement." ( § 337.15, subd. (g).) "The date of substantial completion shall relate specifically to the performance or furnishing design, specifications, surveying, planning, supervision, testing, observation of construction or construction services by each profession or trade rendering services to the improvement." ( Ibid. ) Thus, the critical point is completion of the improvement, or aspect of the improvement, for which a given defendant is responsible: The period of repose commences when the specific improvement alleged to be defective is substantially complete even if it is part of a larger development that is completed later, and, as to a particular subcontractor, upon completion of that subcontractor's work, not the total development of which it is part. ( Liptak v. Diane Apartments, Inc. (1980) 109 Cal.App.3d 762 , 772-773, 167 Cal.Rptr. 440 [damage to home built in second phase of development due to defective grading and filling of slope in another part of development several years earlier; repose period began to run as to grading contractor when grading completed].)
The trial court relied upon Gaggero v. County of San Diego (2004) 124 Cal.App.4th 609 , 21 Cal.Rptr.3d 388 ( Gaggero ), and Shell argues this case is dispositive. The plaintiffs in Gaggero purchased property on which the
21 Chevron , commenting on recent cases involving ground contamination that did not discuss section 337.15, similarly emphasized the need to determine exactly what the plaintiffs alleged: "If raised as a defense, section 337.15 would bar recovery if the defendants were involved in development, were charged with latent construction defects causing injury , and were not in possession ... at the time the deficiencies constituted the proximate cause supporting the action." ( Chevron, supra, 44 Cal.App.4th at p. 1015, fn. 2, 54 Cal.Rptr.2d 324 , italics added.) The Chevron court observed that "[n]either Mangini , which involved allegations of burning, burying, and otherwise discharging toxic wastes upon the property ( Mangini [ v. Aerojet-General Corp. (1991) ] 230 Cal.App.3d [1125,] 1132 [ 281 Cal.Rptr. 827 ] ) nor Newhall , which alleged contamination of soil and groundwater during operation of a natural gas processing plant ( Newhall [ Land & Farming Co. v. Superior Court (1993) ] 19 Cal.App.4th [334,] 339 [ 23 Cal.Rptr.2d 377 ] ) was a construction defect case," while several other cases that "may have involved leakage from underground storage tanks" ( KFC Western, Inc. v. Meghrig (1994) 23 Cal.App.4th 1167 , 1171, 28 Cal.Rptr.2d 676 ; Wilshire Westwood Associates v. Atlantic Richfield Co. (1993) 20 Cal.App.4th 732 , 737-738, 24 Cal.Rptr.2d 562 ; Capogeannis v. Superior Court (1993) 12 Cal.App.4th 668 , 672, 15 Cal.Rptr.2d 796 ) simply did not mention section 337.15. ( Chevron, at p. 1015, 54 Cal.Rptr.2d 324 .)
Appellants argue that in order to establish an affirmative defense under section 337.15, Shell had the burden of producing evidence that the contamination resulted from defective construction of the fuel distribution terminal and, unless it did so, appellants had no further obligation to demonstrate that the contaminate resulted from business operations unrelated to the construction of the facility. Shell insists that it satisfied its burden of establishing all elements of the defense by demonstrating through undisputed facts that it "developed a bulk fuel terminal on the Property" and "operated the fuel terminal" there until it sold the property and operating fuel terminal to Simmons in 1980, and that appellants did not initiate any of the consolidated actions until 2010. The burden then fell to appellants, Shell maintains, to produce evidence raising a triable issue of fact as to whether the contamination resulted from a latent construction defect.
Shell's argument might be availing if appellants' claims were based solely upon the theory that the property was contaminated during Shell's ownership and use due to a defect in construction of the fuel distribution terminal. This appears to be the conclusion the trial court drew, but neither the reasoning expressed in its orders nor Shell's arguments here support that conclusion. The court noted that appellants'
Contesting appellants' argument that they did not allege liability based on latent defects against Shell, Shell argues that the negligence and nuisance claims were asserted against all defendants, "lumped together indiscriminately in allegations that explicitly reference damages caused by latent deficiencies." Shell points to three paragraphs in the cause of action for negligence, and one in the cause of action for nuisance, with emphasis as follows: " Defendants ... and each of them , participated in the development, design, construction, renovation, repair and/or sale of the Subject Property ... or were prior owners, lessors, lessees, users and/or occupiers of the Subject Property"; "the design, materials, and/or construction defects and related damages as described in, and each of them, were at all material times latent and could not have been discovered by plaintiff through the exercise of reasonable diligence and/or by reasonable inspection"; "as a proximate result of the defects set forth herein and the conduct of defendants , plaintiff has suffered damages ..."; and " defendants and each of them, have interfered with and continue to interfere with plaintiff's use and private enjoyment of the Subject Property, namely by developing, designing, and/or constructing, contaminating, occupying and maintaining the Subject Property in an area where the soil, air and water is contaminated and harmful to health and safety and was not properly cleaned and/or decontaminated prior to the construction of the Subject Property as alleged in paragraph 26 above so as to constitute a private nuisance."
As we have said, section 337.15 can provide a bar only to claims based on construction defects. ( San Diego Unified, supra, 170 Cal.App.4th at pp. 305-306, 310-311, 87 Cal.Rptr.3d 796 [statute inapplicable to claims based on violation of contractual and statutory duties to remediate pollution that applied regardless of how perfectly landfill was constructed]; Gaggero , supra , 124 Cal.App.4th at p. 613, 21 Cal.Rptr.3d 388 [statute barred claims alleging that faulty construction and operation of landfill resulted in subsidence]; Chevron, supra, 44 Cal.App.4th at p. 1012, 54 Cal.Rptr.2d 324 [statute barred claims that soil contamination was due to faulty installation of underground fuel storage tanks on the property].) Since appellants' claims were based on Shell's contamination of the site in the course of its business operations, not on a construction defect, the summary judgment cannot be upheld on the basis that all appellants' claims were barred by section 337.15.
II.[24]
DISPOSITION
The trial court properly found the causes of action for negligence barred by the three-year statute of limitations, but erred in finding those causes of action and the causes of action for nuisance barred by the 10-year statute of repose.
Accordingly, summary judgment in favor of Shell is affirmed as to the causes of action for negligence and reversed as to the causes of action for
** * See footnote *, ante .
The parties shall bear their own costs on appeal.
We concur:
Stewart, J.
Miller, J.
26 The trial court denied Shell's argument that the private nuisance claim was barred on a theory of consent by the prior owner of the property and its attempt to limit the damages recoverable on the cause of action for continuing nuisance.
Cases cited
- Preach v. Rainbow 12 Cal.App.4th 1441 at 1450 p. 200
- Hersant v. Department of Social Services 57 Cal.App.4th 997 at 1001 p. 200
- Horn v. Cushman & Wakefield Western, Inc. 72 Cal.App.4th 798 p. 200
- Martinez v. Traubner 32 Cal.3d 755 p. 202
- San Diego Unified School District v. County of San Diego 170 Cal.App.4th 288 p. 202
- Chevron U.S.A. Inc. v. Superior Court 44 Cal.App.4th 1009 at 1015 p. 203
- Perry v. East Bay Regional Park District 141 Cal.App.4th 1 p. 911
- Chevron U.S.A., Inc. v. Superior Court 4 Cal.App.4th 544 p. 911
- Camargo v. Tjaarda Dairy 25 Cal.4th 1235 p. 911
- Shapiro v. Sutherland 64 Cal.App.4th 1534 p. 911
- Aguilar v. Atlantic Richfield Co. 25 Cal.4th 826 at 850-853 p. 911
- Asplund v. Selected Invs. in Fin. Equities, Inc. 86 Cal.App.4th 26 p. 911
- Lorenzen-Hughes v. MacElhenny, Levy & Co. 24 Cal.App.4th 1684 at 1688 p. 911
- Leal v. Holy Spirit Ass'n for Unification of World Christianity 46 Cal.3d 1092 at 1107 p. 912
- Marshak v. Ballesteros 72 Cal.App.4th 1514 at 1517 p. 912
- Kaplan v. LaBarbera 58 Cal.App.4th 175 at 179 p. 912
- Saelzler v. Advanced Group 400 25 Cal.4th 763 p. 912
- Regents of University of California v. Superior Court 41 Cal.App.4th 1040 p. 912
- Acosta v. Glenfed Development Corp. 128 Cal.App.4th 1278 p. 913
- Gundogdu v. King Mai, Inc. 171 Cal.App.4th 310 p. 913
- Liptak v. Diane Apartments, Inc. 109 Cal.App.3d 762 p. 913
- Gaggero v. County of San Diego 124 Cal.App.4th 609 p. 913
- Grange Debris Box & Wrecking Co. v. Superior Court 16 Cal.App.4th 1349 p. 916