Majority
II. DISCUSSION
In January 2017, the city council denied the appeal and approved the three use permits. Plaintiffs[5] filed a petition for writ of mandate in the superior court. In contesting the City's CEQA exemption findings, plaintiffs argued two exceptions to the exemption applied: (1) the "location" exception under Guidelines, section 15300.2, subdivision (a); and (2) the "unusual circumstances" exception under Guidelines, section 15300.2, subdivision (c). Plaintiffs also argued the City's approval of the projects violated zoning requirements regarding "fifth bedrooms," useable open space, and fire safety and accessibility of emergency vehicles. The superior court denied the petition for writ of mandate, and this appeal followed.
A. CEQA Findings
The City found the projects fell within the CEQA "Class 3" categorical exemption, which applies to "construction and location of limited numbers of new, small facilities or structures," including "up to three single-family residences" in "urbanized areas." (Guidelines, § 15303.) "When a project comes within a categorical exemption, no environmental review is required unless the project falls within an exception to the categorical exemption." ( Aptos Residents Assn. v. County of Santa Cruz (2018) 20 Cal.App.5th 1039 , 1046, 229 Cal.Rptr.3d 605 ( Aptos Residents ).) Because they do not dispute that the projects meet the requirements for a Class 3 exemption, plaintiffs bear the burden of demonstrating that the projects fall within an exception. (
4 Plaintiffs are Berkeley Hills Watershed Coalition and Center for Environmental Structure. Berkeley Hills Watershed Coalition is a nonprofit association formed by a group of the neighbors who opposed approval of the projects. Center for Environmental Structure is a nonprofit corporation "dedicated to the shaping of our living environment so that it becomes deeply comfortable, beautiful and supportive for all human beings."
As our Supreme Court explained, "Section 21168.5 provides the standard of review in all ... actions 'to attack, review, set aside, void or annul a determination, finding, or decision of a public agency on the grounds of noncompliance with [CEQA].' ... Under it, a court's inquiry is 'whether there was a prejudicial abuse of discretion. Abuse of discretion is established if the agency has not proceeded in a manner required by law or if the
6 The unusual circumstances exception provides: "A categorical exemption shall not be used for an activity where there is a reasonable possibility that the activity will have a significant effect on the environment due to unusual circumstances." (Guidelines, § 15300.2, subd. (c).) As noted above, plaintiffs asserted in the trial court that the projects at issue here fall within the unusual circumstances exception, but they have abandoned that argument on appeal.
As to the second part of the unusual circumstances exception, "whether there is 'a reasonable possibility' that an unusual circumstance will produce 'a significant effect on the environment' (Guidelines, § 15300.2, subd. (c) ), a different approach is appropriate, both by the agency making the determination and by the reviewing courts." ( Berkeley Hillside I, supra , 60 Cal.4th at p. 1115, 184 Cal.Rptr.3d 643 , 343 P.3d 834 .) When " 'unusual circumstances' " are established, "it is appropriate for agencies to apply the fair argument standard in determining whether 'there is a reasonable possibility [of] a significant effect on the environment due to unusual circumstances.' " ( Ibid. ) "As to this question, the reviewing court's function 'is to determine whether substantial evidence support[s] the agency's conclusion as to whether the prescribed "fair argument" could be made.' " ( Ibid. )
Our interpretation is also supported by the purposes of CEQA. ( California Building Industry Assn. v. Bay Area Air Quality Management Dist. (2015) 62 Cal.4th 369 , 382, 196 Cal.Rptr.3d 94 , 362 P.3d 792 ( California Building Industry Assn. ) ["CEQA was enacted to advance four related purposes: to (1) inform the government and public about a proposed activity's potential environmental impacts; (2) identify ways to reduce, or avoid, environmental damage; (3) prevent environmental damage by requiring project changes via alternatives or mitigation measures when feasible; and (4) disclose to the public the rationale for governmental approval of a project that may significantly impact the environment."].) As our Supreme Court explained, "Despite [CEQA's] evident concern with protecting the environment and human health, its relevant provisions are best read to focus almost entirely on how projects affect the environment." ( Id. at p. 387, 196 Cal.Rptr.3d 94 , 362 P.3d 792 ; Ballona Wetlands Land Trust v. City of Los Angeles (2011) 201 Cal.App.4th 455 , 473, 134 Cal.Rptr.3d 194 ( Ballona Wetlands ) ["the purpose of an [environmental impact report] is to identify the significant effects of a project on the environment, not the significant effects of the environment on the project"].)[9] By its terms, the location exception applies "where the project may impact on an environmental resource." (Guidelines, § 15300.2, subd. (a).) The plain language in the exception reflects concern with the effect of the project on the environment, not the impact of existing environmental conditions (such as seismic and landslide risks) on the project or its future residents.
Having concluded the location exception is not applicable based solely on the "undisputed" fact the project is located in a potential earthquake and landslide zone, we consider whether the City's determination that "the
8 Plaintiffs argue California Building Industry Assn. supports application of the location exception because it held agencies are required to evaluate a project's potential exacerbating effect on existing environmental conditions. ( California Building Industry Assn., supra , 62 Cal.4th at p. 377, 196 Cal.Rptr.3d 94 , 362 P.3d 792 .) First, it is not clear that holding controls here, because California Building Industry Assn. concerned preparation of an environmental impact report for a project that was not exempt, and thus did not consider the language in the location exception. Second, as plaintiffs themselves argue, its holding is more likely relevant to the second prong of the location exception-whether substantial evidence supports a fair argument the project "may impact on an environmental resource of hazardous or critical concern," which we address briefly below. Plaintiffs also contend Ballona Wetlands, supra, 201 Cal.App.4th 455 , 134 Cal.Rptr.3d 194 , was limited by California Building Industry Assn., but the California Supreme Court expressly noted California Building Industry Assn. was not inconsistent with Ballona Wetlands, which was one of several cases that implicitly held CEQA does not generally require an agency to analyze how existing hazards or conditions might impact a project's users or residents. ( California Building Industry Assn. , at p. 392, 196 Cal.Rptr.3d 94 , 362 P.3d 792 .)
Plaintiffs also argue, for the first time on appeal, that the landslide risk is not only about the impact on the project's own residents, but about potential impacts of activating a landslide on the community of protected coast live oak trees on the parcels. Plaintiffs failed to raise this issue during the administrative process, and thus have failed to exhaust their administrative
9 We likewise reject any argument the project cannot be exempt because it relies on mitigation measures. Though " '[t]he distinction between elements of a project and measures designed to mitigate the impacts of the project may not always be clear,' " measures taken to comply with building codes or to address " 'common and typical concerns' " during construction projects do not preclude Class 3 exemption. ( Berkeley Hillside Preservation v. City of Berkeley (2015) 241 Cal.App.4th 943 , 960-961, 194 Cal.Rptr.3d 212 ( Berkeley Hillside II ).) Here, the record reflects the "mitigation measures" plaintiffs identify were developed as part of the project design to meet building code requirements for properties located in seismic zones and address preexisting conditions on the site as opposed to being "proposed subsequent actions by the project's proponent to mitigate or offset the alleged adverse environmental impacts" of the project. ( Save the Plastic Bag Coalition v. City and County of San Francisco (2013) 222 Cal.App.4th 863 , 882-883, 166 Cal.Rptr.3d 253 , citing Salmon Protection & Watershed Network v. County of Marin (2004) 125 Cal.App.4th 1098 , 1104 & 1108, 23 Cal.Rptr.3d 321 ; Berkeley Hillside II , at p. 961, 194 Cal.Rptr.3d 212 .)
Because we conclude the City's determination the project is not in an environmentally sensitive area is supported by substantial evidence, we need not reach the second prong of the location exception inquiry-whether substantial evidence supports a "fair argument" that the project "may impact" the mapped resource. (See, e.g., Berkeley Hillside II, supra, 241 Cal.App.4th at p. 958, 194 Cal.Rptr.3d 212 .) Even if we did, however, we would affirm the agency's exemption finding. Plaintiffs failed to identify any substantial evidence that would support a fair argument the project in this case will have an adverse effect on the environment. As noted above, the geotechnical reports prepared by Kropp & Associates and Cotton/Shires addressed potential impacts of the environment on the projects, and made recommendations for site preparation and earthwork, foundations, retaining walls, drainage, and other measures to
The letter also explained the reference to "parcels" in the ordinance was intended to apply to the " 'addition' of bedrooms," not new construction. "The Planning Commission report states that the question under consideration
10 Plaintiffs argue we should not defer to the City's interpretation of its own ordinance because after the City adopted the ordinance, it applied it to "new construction" when it approved use permits for two new construction projects in 2014 and 2016, both of which contain specific findings pursuant to Berkeley Municipal Code section 23D.16.050 justifying the construction of more than four bedrooms. Plaintiffs contend such findings are "powerful evidence" the City originally intended the ordinance to cover new construction and its recent change of interpretation is inconsistent with that intent. (See Yamaha, supra, 19 Cal.4th at pp. 7-8, 12, 13, 78 Cal.Rptr.2d 1 , 960 P.2d 1031 [evidence an agency " 'has consistently maintained the interpretation in question, especially if [it] is long-standing' " is a factor that supports judicial deference to an agency interpretation].) Whether the agency's interpretation is long-standing, however, is only one of several factors we consider under Yamaha . In any event, as discussed below, even without deferring to the city attorney's opinion, we independently conclude its interpretation is correct. (See Stolman v. City of Los Angeles (2003) 114 Cal.App.4th 916 , 928, 8 Cal.Rptr.3d 178 ["court has the duty ' " 'to state the true meaning of the statute finally and conclusively,' " notwithstanding the agency construction' "]; McPherson v. City of Manhattan Beach (2000) 78 Cal.App.4th 1252 , 1266, 93 Cal.Rptr.2d 725 [extrinsic evidence regarding city planner's interpretation of ordinance was irrelevant where meaning was clear and unambiguous as a matter of law].)
III. DISPOSITION
C.-D.[13]
T
he judgment is affirmed. Respondents shall recover their costs on appeal.
We concur:
Banke, J.
Kelly, J.[14]
11 Plaintiffs also argue the City was required "to specifically address the prohibition on new dwellings with more than four bedrooms," either with a specific use permit under Berkeley Municipal Code section 23D.16.050 or by specific findings under section 23B.32.040. But plaintiffs do not point to any language in Berkeley Municipal Code section 23B.32.040 that either prohibits construction of new dwellings with more than four bedrooms or requires specific findings of nondetriment regarding the number of bedrooms exceeding four. (See Berkeley Mun. Code, § 23B.32.040.A ["The Board may approve an application for a Use Permit ... only upon finding that the ... construction of a building, structure or addition thereto, under the circumstances of the particular case existing at the time at which the application is granted, will not be detrimental to the health, safety, peace, morals, comfort or general welfare of persons residing or working in the area or neighborhood of such proposed use ...."].) We likewise reject plaintiffs' argument that the mini-dorm ordinance would only be "redundant" for new construction if the City was required to make such findings. The mini-dorm ordinance was enacted, as explained, to provide for discretionary review of projects that would otherwise escape review. For reasons explained above, we conclude Berkeley Municipal Code section 23D.16.050 does not apply to the proposed projects in this case.
** * See footnote *, ante .
*** ** Judge of the Superior Court of the City and County of San Francisco, assigned by the Chief Justice pursuant to article VI, section 6 of the California Constitution.
I. BACKGROUND
Real parties in interest, Matthew Wadlund (Wadlund), Alexandra Destler Wadlund, Eric S. Schmier, individually and as the trustee of the Eric S. Schmier 2010 Living Trust, and Kenneth J. Schmier, individually and as the trustee of the Kenneth
1 All undesignated statutory references are the Public Resources Code unless otherwise specified.
In connection with the permit applications, Wadlund hired Alan Kropp & Associates, Inc. (Kropp & Associates) to prepare a geotechnical and geologic hazard investigation of the proposed residences. The report noted "[t]he western portion of the site is within the Alquist-Priolo Earthquake Fault Zone (APEFZ) established by the State of California along the Hayward fault" and the "site is also located in a potential earthquake-induced landslide area mapped by the California Geologic Survey on their Seismic Hazard Mapping Act map for this area." The purpose of the investigation was "to evaluate the geotechnical and geologic conditions that exist at the site, including landsliding and fault rupture, and their potential impact on the project." The report concluded the site was suitable for the proposed residences and offered recommendations for the design and construction of the project to "minimize possible geotechnical problems."
The City retained Cotton, Shires and Associates, Inc. (Cotton/Shires) to peer review the investigation by Kropp & Associates. Cotton/Shires requested additional evaluation and further information about proposed design measures "to address slope instability concerns," noting the "[p]roposed site development is constrained by earthflow landslide material of moderate depth, soils with high expansion potential, unstable existing fill materials, and anticipated strong seismic ground shaking." After receiving two further responses and modifications from Kropp & Associates, Cotton/Shires eventually recommended approval of the permits, concluding the "geotechnical evaluations and recommended project design measures satisfactorily address State requirements for investigation and mitigation within the mapped earthquake-induced landslide hazard zone."
After holding a public hearing and receiving public comments, the zoning adjustments board (Board) approved the use permits in September 2016. The Board found the proposed projects[3] categorically exempt from CEQA under the Class 3 categorical exemption for new construction of small structures. ( Cal. Code Regs., tit. 14, § 15303, subd. (a) [Class 3 exemption includes "up
2 The parties apparently disagree whether the City treated the three applications for use permits as one project or three separate projects, but neither party discusses how the issue affects our resolution of the issues raised in this appeal. Because there were three separate applications, three separate sets of findings and conditions, and three separate use permit approvals, we will refer to "projects" rather than a single "project" in this opinion.
3 Subsequent references to "Guidelines" are to the CEQA guidelines found in title 14 of the California Code of Regulations, section 15000 et seq.
Plaintiffs argue the City's determination here is erroneous because the projects meet the "location" exception set forth in Guidelines, section 15300.2, subdivision (a). The Guideline provides: "Location. Classes 3, 4, 5, 6, and 11 are qualified by consideration of where the project is to be located-a project that is ordinarily insignificant in its impact on the environment may in a particularly sensitive environment be significant. Therefore, these classes are considered to apply in all instances, except where the project may impact on an environmental resource of hazardous or critical concern where designated, precisely mapped, and officially adopted pursuant to law by federal, state, or local agencies." (Guidelines, § 15300.2, subd. (a).)
1. Standard of Review
Until relatively recently, the standard of review applicable to the three general exceptions to categorical exemptions set forth under Guidelines, section 15300.2, subdivisions (a) through (c) was a subject of disagreement among the appellate courts.[6] (See, e.g.,
5 The general exceptions are the unusual circumstances exception, the location exception, and the cumulative impacts exception. (See Guidelines, § 15300.2, subds. (a)-(c); Hines v. California Coastal Com. (2010) 186 Cal.App.4th 830 , 855-856, 112 Cal.Rptr.3d 354 .)
Berkeley Hillside I held a bifurcated approach applies to an agency's determination with respect to the unusual circumstances exception. ( Berkeley Hillside I, supra , 60 Cal.4th at pp. 1114-1115, 184 Cal.Rptr.3d 643 , 343 P.3d 834 .) "The determination as to whether there are 'unusual circumstances' (Guidelines, § 15300.2, subd. (c) ) is reviewed under section 21168.5's substantial evidence prong. However, an agency's finding as to whether unusual circumstances give rise to 'a reasonable possibility that the activity will have a significant effect on the environment' (Guidelines, § 15300.2, subd. (c) ) is reviewed to determine whether the agency, in applying the fair argument standard, 'proceeded in [the] manner required by law.' " ( Id. at p. 1114, 184 Cal.Rptr.3d 643 , 343 P.3d 834 .)
In further elucidating these standards, the Supreme Court explained, "[w]hether a particular project presents circumstances that are unusual for projects in an exempt class is an essentially factual inquiry," and accordingly, "a reviewing court should apply the traditional substantial evidence standard" to that prong. ( Berkeley Hillside I, supra , 60 Cal.4th at p. 1114, 184 Cal.Rptr.3d 643 , 343 P.3d 834 .) "Under that relatively deferential standard of review, the reviewing court's ' "role" ' in considering the evidence differs from the agency's. [Citation.] ' "Agencies must weigh the evidence and determine 'which way the scales tip,' while courts conducting [traditional] substantial evidence ... review generally do not." ' [Citation.] Instead, reviewing courts, after resolving all evidentiary conflicts in the agency's favor and indulging in all legitimate and reasonable inferences to uphold the agency's finding, must affirm that finding if there is any substantial
2. Location Exception
Plaintiffs contend the projects in this case are subject to the location exception because the geotechnical report prepared in connection with the use permits stated the projects were located "within the Alquist-Priolo Earthquake Fault Zone (APEFZ) established by the State of California along the Hayward fault" and in a "potential earthquake-induced landslide area mapped by the California Geologic Survey on their Seismic Hazard Mapping Act map for this area."[8] Plaintiffs argue these facts are "undisputed," and therefore the court may determine, as a matter of law, that the agency erred. This is because, plaintiffs claim, under the plain language of the location exception, the APEFZ and earthquake-induced landslide areas are " 'environmental resources of hazardous or critical concern.' " We disagree.
7 The trial court noted the project was not located in the mapped Alquist-Priolo Earthquake Fault Zone (APEFZ). The geotechnical report states, however, that the "western portion of the site is within the [APEFZ]." Other sections of the report explain "[o]nly the extreme front portion of the parcel is within the APEFZ," and the "proposed home sites will all be located outside the APEFZ." The report also explains no active traces of the Hayward fault run through the site. Because the record reflects at least some portion of the site is in the APEFZ, however, we consider whether that fact renders the location exception applicable.
Employing those principles here, the language of the statute indicates it is the "environmental resource" which must be "designated, precisely mapped, and officially adopted pursuant to law." (Guidelines, § 15300.2, subd. (a).) But the statutes cited by plaintiffs map the physical locations of potential earthquakes and landslides. The plain meaning of "environmental resource " in the location exception does not encompass possible earthquake or landslide zones. A "resource" is a "natural source of wealth or revenue," or a "natural feature or phenomenon that enhances the quality of human life." (Merriam-Webster's Collegiate Dict. (11th ed. 2014) p. 1061.) Earthquakes and landslides are geologic events-and while they are indeed hazardous, they are not "resources." Thus, giving meaning to the phrase "environmental resource," we cannot conclude the location exception was intended to cover all areas subject to such potential natural disasters as a matter of law.
Though the language of the Guideline is clear and unambiguous, our interpretation is further supported by the stated purposes of the hazard mapping and zoning acts identified in the geotechnical report. As the trial court observed, the Seismic Hazards Mapping Act was enacted to prevent "economic losses" and "to protect public health and safety," not to identify the location of "environmental resource[s]." (§ 2691.) Specifically, the Legislature found and declared: "(a) The effects of strong ground shaking, liquefaction, landslides, or other ground failure account for approximately 95 percent of economic losses caused by an earthquake. [¶] (b) Areas subject to these processes during an earthquake have not been identified or mapped statewide, despite the fact that scientific techniques are available to do so. [¶] (c) It is necessary to identify and map seismic hazard zones in order for cities and counties to adequately prepare the safety element of their general plans and to encourage land use management policies and regulations to reduce and mitigate those hazards to protect public health and safety ." ( Ibid. , italics added; § 2692 [statute further intends to provide mapping and technical advisory program to assist cities and counties in protecting public health and safety risks arising from earthquakes and landslides].) Similarly, the APEFZ was enacted to "provide policies and criteria ... to prohibit the location of ... structures for human occupancy across the trace of active faults" and to "provide the citizens of the state with increased safety and to minimize the loss of life during and immediately following earthquakes ...." (§ 2621.5,
As noted earlier, plaintiffs bore the burden of demonstrating the location exception applied here. Plaintiffs argue "the geotechnical reports show the project presents a serious risk of activating or exacerbating an existing landslide on the property," but the record citations they
Finally, plaintiffs argue the trial court's interpretation of the location exception is inconsistent with section 21159.21, subdivision (h)(4) and (5), which set forth exceptions to a specific statutory exemption for housing projects located in seismic and landslide hazard areas. That section provides projects qualify for CEQA exemption if they are not subject to "(4) ... a delineated earthquake fault zone ... or a seismic hazard zone .... [or] [¶] (5) Landslide hazard ... zone ...." (§ 21159.21,
B. Mini-dorm Ordinance
Plaintiffs claim the City abused its discretion by misinterpreting and misapplying Berkeley Municipal Code section 23D.16.050 in approving the projects. Berkeley Municipal Code section 23D.16.050 (Ordinance No. 7306-NS) provides: "For the addition of a fifth bedroom to a parcel, an Administrative Use Permit (AUP) shall be required. For the addition of any bedroom beyond the fifth, a Use Permit with Public Hearing (UPPH) shall be required." Plaintiffs argue because each of the proposed three houses have more than four bedrooms, the City was required to either issue an administrative use permit (AUP) or use permit with public hearing (UPPH) under Berkeley Municipal Code section 23D.16.050, or make specific findings of nondetriment regarding the number of bedrooms under section 23B.32.040 of the zoning ordinance. The City argued below, and argues on appeal, that because new construction already requires a use permit, requiring a second, separate permit for buildings with more than five bedrooms would be redundant.
In interpreting municipal ordinances, we exercise our independent judgment as we would when construing a statute. ( Harrington v. City of Davis (2017) 16 Cal.App.5th 420 , 434, 224 Cal.Rptr.3d 351 .) Nonetheless, a city's interpretation of its own ordinance " 'is entitled to great weight unless it is clearly erroneous or unauthorized.' " ( Anderson First Coalition v. City of Anderson (2005) 130 Cal.App.4th 1173 , 1193, 30 Cal.Rptr.3d 738 .) In determining what weight to give an agency's interpretation of its own regulations, we apply the "complex of factors" set forth by our Supreme Court in Yamaha Corp. of America v. State Bd. of Equalization (1998) 19 Cal.4th 1 , 12, 78 Cal.Rptr.2d 1 , 960 P.2d 1031 ( Yamaha ) [weight to be given an agency's interpretation is "fundamentally situational "]. Greater deference is accorded an agency's interpretation where " 'the agency has expertise and technical knowledge, especially where the legal text to be interpreted is ... entwined with issues of fact, policy, and discretion. ... since the agency is likely to be intimately familiar with regulations it authored and sensitive to the practical implications of one interpretation over another.' " ( Ibid . ) Deference is also appropriate when there are indications the agency's interpretation is likely to be correct. ( Id. at pp. 12-13, 78 Cal.Rptr.2d 1 , 960 P.2d 1031 .)
In this case, it is appropriate to give the city attorney's opinion substantial deference because the "Mini-dorm ordinance" is intertwined with issues of "fact, policy, and discretion" regarding zoning requirements and impacts to neighborhoods and the local community. Moreover,
Examining the plain meaning of the words used in the ordinance, an AUP or a UPPH is required for the "addition of a fifth bedroom to a parcel." The words "addition" and "fifth bedroom" imply the preexistence of four bedrooms on a parcel. The trial court thus correctly determined "[t]he plain meaning of 'addition' is that the bedroom must be added to an existing structure."
Further, contrary to plaintiffs' argument, the definition of "Addition" in the zoning ordinance supports the City's interpretation. An "Addition" is the "The creation of any new portion of a building which results in a vertical or horizontal extension of the building, or results in any new gross floor area that was not present in the building prior to construction of the addition." (Berkeley Mun. Code, § 23F.04.010.) The "creation of any new portion of a building" implies a building is already existing. That the Mini-dorm ordinance says the addition of a fifth bedroom is to "a parcel" does not defeat that interpretation. It simply means the ordinance will apply broadly to include any addition to an existing building on a parcel if the addition will result in more than four bedrooms on the parcel, regardless of the number or type of existing structures.
We also agree with the City this interpretation is consistent with the apparent intent of the ordinance. In articulating the rationale for the proposed ordinance, a 2013 report from the city manager and the director of planning and development to the city council explained the "addition of bedrooms to
Cases cited
- Aptos Residents Ass'n v. Cnty. of Santa Cruz 20 Cal.App.5th 1039 p. 241, p. 890
- California Building Industry Ass'n v. Bay Area Air Quality Management District 62 Cal.4th 369 p. 245
- Ballona Wetlands Land Trust v. City of Los Angeles 201 Cal.App.4th 455 p. 245
- Berkeley Hillside Preservation v. City of Berkeley 60 Cal.4th 1086 p. 888
- Hoitt v. Department of Rehabilitation 207 Cal.App.4th 513 p. 891
- Sierra Club v. City of Orange 163 Cal.App.4th 523 p. 894
- Harrington v. City of Davis 16 Cal.App.5th 420 p. 896
- Anderson First Coalition v. City of Anderson 130 Cal.App.4th 1173 p. 896
- Yamaha Corp. of America v. State Board of Equalization 19 Cal.4th 1 p. 896
- MacIsaac v. Waste Management Collection & Recycling, Inc. 134 Cal.App.4th 1076 p. 897