Majority
Headnote
The canal commissioners, under the act for the construction of the Crooked Lake Canal, caused surveys, &c. to be made and then adopted a plan, as required by the act, preliminary to commencing the work; but the plan had no reference to the defendants’ dam, then standing at the outlet of the lake. Afterward, however, the commissioners, by way of substitute for a portion of the machinery contemplated by the plan, permitted the defendants to increase the height of their dam; which being done, caused an injury to the plaintiff’s lands lying above, greater than would have resulted had the plan been pursued: Held, that the alleged authority from the commissioners constituted no protection to the defendants, against the plaintiffs claim for damages.Clearly, this is not a case for our interference with the verdict because it was contrary to the weight of evidence, either on the question whether any injury was done, or on the right supposed to have been acquired by adverse enjoyment, or on the amount of damages recovered. Nor is there any serious question arising upon the judge’s admission or rejection of evidence.
The objection to the judge’s charge raises a point of more difficulty. Had the statute of 1829, stopped with a general authority to construct and complete the canal, the power to authorize the raising of any dam in the outlet, at any stage of the work, would have been implied. The adjudication of the canal commissioners, that the ten inch addition to the defendants’ dam was necessary to raise the reservoir with a view to an adequate supply of water, would, in such case, have been valid. The defendants would, therefore, have been protected, as having acted under the authority of a court possessing - competent jurisdiction over the subject matter; for there is no pretence that they have raised their dam higher than the canal commissioners directed them to go. I take it for granted that the alleged permission was given, because, although the evidence to this fact was not all that way, yet the decided balance of it was, and the judge assumed in his charge that the per
But the statute did not leave the canal commissioners to act under a general and unrestricted power. By the second section, (1 R. S. 234, 2d. ed.,) they were required to cause an examination, surveys, levels and. estimates to be made, to ascertain whether an adequate supply of water could be obtained without injuriously affecting the hydraulic works on the outlet. This plan was to be, either by raising the water in the lake above high water mark,, by constructing a dam across or near the outlet, or by deepening the channel, &c. or upon any other approved plan. Then, by the third and subsequent sections, if, by the examination, &c. it should be ascertained to their satisfaction that a plan could be adopted which should work no injury to the hydraulic works, they were to pursue it in the construction of their work; but not unless the owners of the hydraulic works below should release all claim to damages, or the damages should be first assessed and paid, or tendered. And in no event was the work to be commenced, unless security should be first given to construct the canal for a sum not exceeding $120,000.
In executing this authority, the commissioners adopted Mr. Hutchinson’s plan, after he, as their engineer, had examined, surveyed, taken the proper levels and made the proper estimates, in the language of the act. This plan comprehended a top water level, to be secured by means of the state dam connected with regulating gates, the whole being entirely independent of, and not at all looking to the defendants’ dam below. The canal was then constructed, and put in operation upon that plan. The regulating gates were not actually erected till after the act of May 11, 1835, (1 R. S. 326, 2d ed.) By this act, some additional
The more plausible suggestion certainly is, that the defendants were protected, because the canal commissioners
But, it is said the canal commissioners had general power to direct as to repairs; and we are referred to 1 R. iS. p. 206, § 17, 18, and p. 208, § 32, 2d ed. Sections seventeen and eighteen authorize the three acting commissioners to submit surveys, &c. and obtain leave of the canal
But the addition to the dam does not rise above the top water line; and therefore, it is said, no mischief is done beyond what would accrue from the state work. That cannot be so. The addition was a permanent structure ; whereas the gates, properly managed, have the capacity to accommodate themselves to the state of the water above, whether high or low, so that it shall not rise above the prescribed line. The complaint is, that the defendants’ dam does its mischief mainly, perhaps entirely, by not yielding, or being capable of modification, in times of very high water. This is doubtless so; at least the jury were right in saying so on the evidence.
On the whole, we think the learned judge was right in his direction to the jury; and that a new trial must, therefore, be denied.
New trial denied.