Majority
Headnote
New York (city of) — contract — construction and effect of contract for furnishing and installing mechanical and electrical equipment on certain public piers in city of New York.The plaintiff entered into a contract with defendant to furnish and install mechanical and electrical equipment on certain piers in the Chelsea section of the borough of Manhattan. The plaintiff alleged that it fully performed the contract; that during the performance of the same it was wrongfully and unlawfully oi’dered and compelled by the engineer and commissioner
The work for which plaintiff sought to recover was of' two classes: (a) Preparing hatchways, including the extension of the same above the roof level, and cutting of pent houses over the passenger elevator shafts; (b) furnishing and delivering coal, three hundred and six tons, and labor for firing boilers in connection with portions of electrical generating plant.
The contract in question covered nine several piers. The invitation to bidders divided the whole work into five several classes. The specifications annexed to and forming a part of the contract contain articles one to twenty-six under “General Conditions.” The work is then specified under separate classes, five in number.
The separate “ classes ” necessary to be considered here are class one, entitled “Electric Generating, Distributing and Lighting Equipment;” class two, entitled “Boiler and Mechanical Draft Plant, Steam Piping, Auxiliaries, Heating, etc.;” and class three, entitled “Elevators.”
Under the last class elevators were to be furnished by the contractor complete and ready for operation, but provision was not made as to the particular make of elevators to be supplied. Article 217 of this class provided: “ The city will prepare hatchways including the extension of the same above the roof level where the extension is necessary to allow the car to travel to the top landing and the making of necessary pit at proper distance below the lowest level. All machinery shall be carried overhead,” etc.
The plaintiff seeks to recover for preparing the hatchways including the extension of the same above the roof
The clause first above quoted from article twenty-seven was not included in the article embodying 1 £ General Conditions ” to which special attention was called, neither was it embraced in the specifications relating to elevators, class three. It was included in class one relating to power plants, electrical details, fixtures, etc., and the trial justice held that the effect of the language used was to require the changes in question to be made at the expense of the contractor. I think such construction of
Article twenty-seven was not included in article one hundred ninety-six where defendant’s special attention was called to articles one to twenty-six as pertaining to elevators. The omission of article twenty-seven in that clause indicated an intention on the part of the city to confine the application of the same to work specified in the “ class ” where the same was included, and when it is read in connection with the work to be done thereunder may be given full force and effect to that “ class ” of work, but the contract and specifications cannot be construed to make the clause applicable to work specified in class three, “ Elevators.” The city having constructed the hatchways and approved of a- pattern of elevators submitted by plaintiff, alterations in the hatchways as constructed being necessary to permit the elevators approved by the city to be operated therein, the obligation rested on the city to make such alterations rather than on the plaintiff.
With reference to the claim of plaintiff for coal, etc., under the head of class one, “Electric Generating, Distributing and Lighting Equipment, ” provision was made that when the docks and equipment are sufficiently completed to require the occupation of the electric generating plant, the contractor shall- furnish a competent crew to
Upon the trial of the action the court held in substance that plaintiff having agreed to make the tests was required to furnish all the material and help necessary to complete said tests, and consequently was required to furnish the coal and help and for that item he was not entitled to recover. We think that question was properly determined by the trial court.
The judgment should be reversed and a new trial granted, but, as both parties to this appeal have succeeded in part, no costs in this court should be awarded.
Willard Bartlett, Ch. J., Hiscock, Collin and Pound, JJ., concur; Cuddeback and Seabury, JJ., dissent.
Judgment reversed, etc.
Cases cited
- Dechert v. Municipal Electric Light Co. 9 App. Div. 573 p. 320
- Aultman & Taylor Co. v. Syme 163 N. Y. 54 p. 320
- Borough Construction Co. v. City of New York 200 N. Y. 149 p. 321
- Mulholland v. Mayor of New York 113 N. Y. 631 p. 321
- Horgan v. Mayor of New York 160 N. Y. 516 p. 321
- Walls v. Bailey 49 N. Y. 464 p. 321
- Rickerson v. Hartford Fire Insurance 149 N. Y. 307 p. 321
- Robinson v. New York & T. S. S. Co. 63 App. Div. 211 p. 321
- Robinson v. United States 13 Wall. 363 p. 321
- Bliven v. New England Screw Co. 23 How. 420 p. 321
- Kitching v. Brown 180 N. Y. 414 p. 321
- Van Ness v. Pacard 2 Pet. 137 p. 321
- Newhall v. Appleton 114 N. Y. 140 p. 321
- Thomas v. Scutt 127 N. Y. 133 p. 321
- Hopedale Electric Co. v. Electric Storage Battery Co. 184 N. Y. 356 p. 321
- Hopper v. Sage 112 N. Y. 530 p. 321
- O'Donohue v. Leggett 134 N. Y. 40 p. 321
- Collender v. Dinsmore 55 N. Y. 200 p. 321