The corporation of New York city advertised for estimates and proposals for grading and forming a street, according to certain specifications. The plaintiff made a proposition referring to and adopting the specifications one of which required the stone excavated in the street to be deposited in the Hudson river in continuation of the street. Upon examination of the proposals, the contract was awarded to the plaintiff by the street commissioner, and the award confirmed by the common council: Held, that the plaintiff’s proposal and the specification formed the only basis of any contract to be made for the work or from which any request to the plaintiff to perform work could be implied.The plaintiff bases his right of recovery in this action upon the contract of October 21st, 1852, and insists that that is the contract between his assignor and the defendants, without any reference to the specifications issued by the street commissioner, and which, by the terms of the contract, were made part of it. Assuming this to be so, how stands the plaintiff’s case? He seeks to recover on a contract, which provided that the rock was to be excavated two feet below the line of the curbstone grade. The proof shows clearly that the rock excavation was carried to the depth of one foot only below the curbstone grade, and it follows that the contract, in this important particular, was unperformed. The entire performance, on the part of the assignor of the plaintiff, through whom he claims, is a condition precedent to the plaintiff’s right of recovery, and to the maintenance of this action. (2 Kent’s Com., 693; Smith v. Brady, 17 N. Y., 173 ; Cunningham v. Jones, 20 N. Y., 486 .) On this ground, without the consideration of any other, the plaintiff cannot succeed. But it is said in his behalf, that the rock was excavated only one foot below the curbstone by the direction of the city surveyor. If this be the contract of the defendants, they, and they alone, or some one duly authorized by them, were competent to change its terms, and, in fact, make a new contract. It is not shown that the defendants ever made this modification of the contract, or in any way acquiesced in it, or gave any authority to the city surveyor to make this or any contract for them, or to change or modify in any particular that made by the street commissioner with McDonald, the performance of which was assumed by the plaintiff’s assignor.
When the contract finally became perfected, signed and executed, no officer of the defendants had any authority to change its provisions unless expressly authorized by the common council. No such authority has been shown in this case, or any acquiescence by the defendants in the departure from the terms of the contract made by the plaintiff’s assignor, with the acquiescence and pursuant to the directions of the city surveyor. Such departure had therefore no legal justification, and the plaintiff has therefore himself shown a non-performance, on his part, of what he claims was his contract with the defendants.
But it is apparent that the plaintiff does not intend to place his right to recover upon this ground. By the specification issued by the street commissioner, and which was made part of the estimate of McDonald, and which was in fact incorpo
It is apparent that the plaintiff’s assignor and the city surveyor both supposed that the specification and the estimate were, in fact, the contract which was to govern in this respect, and therefore the rock was only excavated to the depth of one foot below the grade, as called for by them. Tor the surveyor testified, on the trial of this action, that the rock was only excavated to the depth of one foot by his direction, and that such directions were given in conformity with the specifications issued by the street commissioner, and which the contractor had in his possession, and under which he was working. These specifications under" which the plaintiff’s assignor did the work, were then regarded as the real contract between him and the defendants. This, we think, was . clearly correct, and that the modification contained in the written contract of October 21st was nugatory and void. The specification or proposal had been incorporated into the estimate, and it was before the common council when they authorized the contract to be made. It was specifically incorporated into the contract which was made, and its provisions must be held to be the controlling basis of that contract, and that the.street commissioner had no authority to make any other contract with McDonald, or to change or modify any of the provisions of the proposal after the same was ratified and confirmed by the common council. It was his duty to have conformed to the directions of the
The court put its judgment upon the ground that a written contract having been made, variant from that arising from the proposal and specifications, which alone was authorized by the defendant, the work could not be held to have been peformed under any contract, but was done at large; and that there was no ground for a quantum meruit, as there was nothing from which a request could be implied to do the work otherwise than according to the authorized or the substituted contract. All the judges concurring, .
Judgment affirmed.