Majority
Headnote
Contract — state — when contractor cannot recover on ground that, owing to mistake in estimates by state officers, completed work was more expensive than contemplated — effect of reversal by Appellate Division of finding and dismissal of claim without making new finding — when contractor may recover on quantum meruit for extra work required by changes in plans — no recovery where change is merely permissive.The state designed a dam across the Mohawk river at Scotia with a canal lock at its south end. At this point a layer of gravel underlay the bed of the stream. Upon it the dam could not safely rest. Nor might cofferdams be used in its construction. It was determined, therefore, to sink caissons under compressed air to bedrock for the whole distance. The final result would be a solid concrete cut-off wall, on top of which would be placed the other structures necessary to complete the dam. The .caissons were to be twenty-four in number. Three of them were to extend beyond the others a considerable distance up and down the current, to support the piers of a bridge from which the dam gates were to be operated. For various reasons the expense of building caissons very rapidly increases with the increased, depth to which they are to be lowered. It would become important, therefore, to any one undertalcing this work to ascertain the situation of the bedrock. Investigation of this question had previously been made by the state, apparently for its own information. Its borings showed that everywhere bedrock would be reached above elevation 148, with one exception, where above that level it found “ rock or boulders.” The lock was also to be built of concrete. To accomplish this work it would be necessary to screen the site by sheathing or in some other way so as to make it water tight and to pump
The appellant entered into a unit price contract with the state to build this dam and lock. The claims it now makes are based on two propositions. It says that when it made its bid, it and the state both understood that bedrock would be found not lower than level 148. The state so represented and warranted. As a fact under three caissons it was obliged to excavate 556 cubic feet below this levél. Against its protest the state compelled it to do this work — a work never contemplated by either party when the contract was made. It says also that while for the lock no more water was lifted than was always supposed to be necessary, the state so changed its plans that the method necessarily adopted was far more costly than that at first designed. Consequently, the bid for pumping did not fairly measure the actual cost. For the first of these items the Court of Claims awarded the appellant $11,417; for the second $62,272.21. The Appellate Division, however, reversed as to both on the law and the facts and dismissed the claim. But there is little or no dispute as to the circumstances surrounding the transaction.
Originally an attempt was made by another corporation to build this dam. It tried to use cofferdams for that Thfe aAvaívxA \m a IaxXyys mi Aw, wayAwA was canceled. It seemed that the caisson method was necessary. The state had, as we have seen, bored a number of holes near the site of the proposed work with a wash drill. This is not always satisfactory. A diamond drill is more accurate but more expensive. The state officials believed that they had found bedrock everywhere above level 148. In this, however, they were mistaken. In 1912 plans were- prepared and bids were invited by four advertisements published between June 6th and June 26th, 1912. Proposals would be received until July second. When this advertisement came to the
It is clear that this was not a contract to build three piers with foundations at a certain depth. It was a contract to rest these foundations on bedrock. It cannot be argued, therefore, that in any event the doctrine stated in Borough Construction Co. v. City of New York ( 200 N. Y. 149 ) is applicable. Indeed, we do not understand that any such position is taken by the appellant.
Having received its contract the claimant began to sink its caissons. It commenced not far from the north bank of the river. It was soon found that under three of these caissons, to reach bedrock or to reach hardpan, which was equally satisfactory to the state, it was necessary to go a considerable distance below elevation 148, and that much more than two hundred cubic yards of excavation below that elevation would be required. Protests were made by the claimant. But after some negotiations and the exchange of letters the engineer certified to the canal board that as to this item the work required would exceed his estimate by more than fifteen per cent and the board determined that the excess thereof should be completed by the contractor under the terms and at the prices specified in the contract and so notified the claimant. Thereupon the claimant was required to and did excavate the 556 cubic yards below elevation Í48.
Concededly, all the work done by the contractor was done well and honestly. Concededly, it was done at a loss. Yet, under the terms of the contract, its claim for this item may not be allowed, and this for two reasons.
A contract and specifications may contain representations as to existing physical conditions. If so, a bidder
The remaining claim relates to pumping water from the site of the lock. For this work the contractor bid fifteen cents per million foot gallons. This lock was a structure some 418 feet long by 87 feet wide. The bottom was to.be covered with concrete, laid under water. Then the sidewalls were to be built up with concrete “ in the dry.” To accomplish this the whole site, or that part where work was progressing, had to be surrounded in some way to prevent the entrance of water, and then the pumping begun and continued whenever leakage rendered it necessary. The appellant says, and we think correctly, that at the time the bids were made, the estimates, plans and specifications contemplated a single cofferdam, in connection with which a single pumping system might be installed. At least the evidence would support such an inference and it was so found by the Court of Claims. It is true that this finding was reversed by the Appellate Division, apparently on the ground that it was immaterial. As no finding to the contrary was made by that court, and as it dismissed the claim, the appellant may ask us to consider the testimony favorable to it.
The Erie canal passed this proposed new lock a few feet away, and after the work of constructing this coffer
The claimant then began the north or river wall. There was discussion as to how this should be done and the contractor formulated a plan in regard to it. This was to use a series of eight cribs or boxes sunk to the proper grade on the river bottom. Each was then freed of water separately and filled with concrete. This plan was approved by the board of consulting engineers and also by the division engineer. The work was done as contemplated. But it does not seem to have been considered by any one such an alteration as is spoken of in the contract. There was no order, only permission. There was no consent or approval by the superintendent of public works. There was no writing filed with the engineer and the canal board.
Under the circumstances, whether this manner of build
As to the south wall, however, we reach a different result. Whether the contractor advised the alteration is unimportant. It was in fact made. As a result it required seven distinct pumping operations instead of one, with an increased number of pumps and workmen, with separate installations and other items of expense. While the bid for pumping under the original plans may have been adequate, it may have been utterly inadequate if the work were done as the changes required by the state compelled it to be done. It would be inequitable to confine the bidder to a unit bid made to meet entirely different conditions. Nor are we required, as we are required with regard to the other items, to hold that such is the law.. The bid price is inapplicable. The contractor may recover on a quantum meruit for the reasonable value of the work performed in freeing these seven caissons from water. (Mulholland v. Mayor, etc., of New York, 113 N. Y. 631 ; Wood v. Fort Wayne, 119 U. S. 312 .)
The fact that the alteration order served on the claimant makes no mention of pumping does not change the situation. The order was not a contract. It states, for instance, that the change would require 8,800 additional yards of pneumatic caisson work. These figures would not bind the claimant. It is true the contract states that no change of plans which will increase the expense or create a claim against the state shall be made unless a written statement setting forth its amount and the expense thereof is assented, to by the canal board. This cannot mean that when a change is ordered, compliance with which is obligatory, the estimates of amount and price made , by the. engineer estop the contractor. What may he do? He may protest and object, but he must comply. The provision is intended to give the board reasonable control over the expense to be incurred in alterations.
The claim, therefore, should not have been dismissed. But as there is no finding and no concession as to the fair value of- the work done in removing the water from the seven caissons on the south side of the lock, the judgment appealed from must be reversed and a new trial granted, with costs to abide the event, unless the parties stipulate as to the fair value of such work, in which case judgment may be entered for the amount so stipulated, with costs in all courts, and in other respects the said judgment of the Appellate Division is affirmed.
All concur in the opinion as to the first item mentioned therein except Cardozo and Crane, JJ., who vote to reverse the Appellate Division and affirm the Court of Claims as to the said item.
All concur in the opinion as to the second item mentioned therein except Hogan, Pound and Crane, JJ., who dissent.
Judgment accordingly.
Cases cited
- Borough Construction Co. v. City of New York 200 N. Y. 149 p. 178, p. 184
- Hollerbach v. United States 233 U. S. 165 p. 179
- Christie v. United States 237 U. S. 234 p. 179
- United States v. Spearin 248 U. S. 132 p. 179
- United States v. Atlantic Dredging Co. 253 U. S. 1 p. 179
- Mulholland v. Mayor of New York 113 N. Y. 631 p. 179, p. 188
- Horgan v. Mayor of New York 160 N. Y. 516 p. 179
- Langley v. Rouss 185 N. Y. 201 p. 179
- Faber v. City of New York 222 N. Y. 255 p. 179, p. 185
- Simpson v. United States 172 U. S. 372 p. 179
- Semper v. Duffey 227 N. Y. 151 p. 179, p. 185
- Leary v. City of Watervliet 222 N. Y. 337 p. 179, p. 185
- Sullivan v. President & Trustees of the Village of Sing Sing 122 N. Y. 389 p. 179
- Plumley v. United States 226 U. S. 545 p. 180
- O'Brien v. Mayor of New York 139 N. Y. 543 p. 180
- Wood v. Fort Wayne 119 U. S. 312 p. 188