Majority
Headnote
Contract —■ guaranty — landlord and tenant — guaranty by landlord that .floor of building to be erected for tenant shall carry specified load — landlord not bound to indemnify tenar. for sagging of floor from other cause — complaint in action to recover cost of constructing new floor dismissed where necessitated by general subsidence of soil in neighborhood.On the 30th day of November, 1915, the plaintiff and the Degnon Realty and Terminal Improvement Company executed two instruments under seal. One instrument constituted a lease by the Degnon Realty and Terminal Improvement Company, to the plaintiff, of premises in Queens county for the term of twenty-one years beginning October 1st, 1916. In the second instrument the lessor agreed to erect a building upon the leased premises before the beginning of the term. The building to be erected is described in the instrument as follows: “ three story reinforced concrete factory building, generally similar to the building adjacent known as Brett Building and Studebaker Building, in size about 364 feet x 100 feet, irregular, with penthouse about 20 feet x 250 feet, floor load capacity 200 pounds per square foot, twenty foot spans between columns, with two elevators, sprinkler system, necessary plumbing and heating; the whole to be constructed in strict accordance with the plans and specifications of William Higginson, Architect,
In March, 1916, the Degnon Realty and Terminal Improvement Company was engaged in the construction of the building upon the premises it had agreed to lease to the plaintiff. There is evidence that the plaintiff had not at that time approved the plans for the building. A floor load capacity of 200 pounds per square foot on all the floors of the building was insufficient for the purposes of the business which plaintiff intended to conduct therein. Plaintiff refused to approve any plans for a building which would not provide a floor load capacity of 2,000 pounds per square foot on the ground floor.
In order to satisfy the plaintiff, Degnon Realty and Terminal Improvement Company then delivered to the plaintiff the following letter:
“ Quotations 277,
“ Rome Metallic Bedstead Company,
“ #418 West 25th Street,
“ New York, N. Y.
“ Attention Mr. Myers.
“ Gentlemen.— With reference to the building which we are erecting for you on Anable Avenue, Long Island City, would state that our understanding of the plans and specifications prepared by William Higginson, is that the ground floor is designed to carry a dead load of 2,000 pounds on each square foot, and that such a load if placed there by you will not injure the superstructure. It, however, may cause the floor to sag at various places not to exceed a depth of one inch. The conditions as enumerated above we guarantee.
“ Very truly yours,
“ DEGNON REALTY & TERMINAL IMPROVEMENT COMPANY (Signed) E. S. Nugent.”
“ ESN :JJC.
Under the terms of the formal sealed instruments between the parties, Degnon Realty and Terminal Improvement Company was under no obligation to keep the building, which it had agreed to erect, in repair. Its obligation was complete when the building was erected. The plaintiff’s cause of action is based upon the claim that by its letter of March, 1916, Degnon Realty and Terminal Improvement Company wrote into its contract a continuing guaranty that the floor would not sag at any point more than one inch.
The defendant urges, upon several grounds, that the letter cannot change or add to the obligations previously embodied in formal instrument under seal. We do not pass upon that contention now. Under a fair construction of the terms of the letter, even if such terms had been embodied in the sealed instrument, the defendant has given no guaranty that the floor of the building to
The subject-matter of the agreement between the parties is the erection of a building. The defendant guaranteed that the ground floor of the building to be erected by it should be “ designed to carry a dead load of 2,000 pounds on each square foot,” and that such a load if placed there “ will not injure the superstructure ” nor cause the floor to sag at any place more than one inch. There is nothing in the evidence to indicate and, indeed, no claim is made that the building was so constructed that the ground floor could not carry a dead load of 2,000 pounds without injury to the superstructure, or that any load placed upon the floor would cause it to sag. The sagging of the floor which occurred some years thereafter was not caused or affected by any load placed upon it or by any weakness inherent in the building. Neither cause nor effect was confined to this building, and it does not appear from the evidence that in the erection of the building the defendant should have foreseen the possibility that the condition of the land might change, and should have provided against such a contingency. The defendant guaranteed that the ground floor would not be caused to sag more than one inch by the placing of a specified weight upon it. Its obligation, even if otherwise enforceable, does not by its terms extend to indemnity for a sagging of the floor due to other causes against which the defendant was not bound to provide.
The judgment of the Appellate Division and that of the Trial Term should be reversed and the complaint dismissed, with costs in all courts.
Cardozo, Ch. J., Pound, Crane, Andrews, Kellogg and O’Brien, JJ., concur.
Judgments reversed, etc.
Cases cited
- Fleischman v. Toplitz 134 N. Y. 349 p. 268
- MacKnight Flintic Stone Co. v. Mayor of New York 160 N. Y. 72 p. 268
- Dwyer v. Mayor 77 App. Div. 224 p. 268
- Genet v. President of the Delaware & Hudson Canal Co. 136 N. Y. 593 p. 268
- Franklin v. Brown 118 N. Y. 110 p. 268
- Condict v. Onward Construction Co. 210 N. Y. 88 p. 268