Majority
Headnote
A contractor for the erection of a building who subcontracts a portion of the work and reserves no control or authority over or right to direct as to the manner of performance, save generally to insist that the work be done according to the terms of the subcontract, is not liable to a third person for an injury caused by the negligent act of the subcontractor.The defendant, as a contractor being in possession and having the control of the premises of Appleton & Oo., by the authority of the owners, for the purpose of erecting buildings upon and improving the same, in the performance of his contract possessed the same rights as the owner, and was chargeable for a want of due care and for negligence in the exercise of his rights, if by means thereof the property of the plaintiffs was injured.
The referee found that the water which flowed into the cellar of the building and injured the plaintiffs, came from the roof by means of the failure of the defendant to direct Moore & Bryant, who were subcontractors, to make the necessary cuttings in the wall for the waste pipe which was intended to connect with the sewer, and without which it could not be connected, so that he failed to provide means to carry off the rain water. That this was negligence on the part of the defendant, and that the water which flowed into the building from Franklin street did so in consequence of the manner in which Moore & Bryant had carried on the erection of the vault and sidewalk in front of said building, and that this was negligence on their part.
The first question which arises upon the referee’s findings is, whether the failure of the defendant to give the proper directions to Moore & Bryant was such negligence as made him answerable for the damages which ensued. The contract of Moore & Bryant, with the defendant, provided that they should do all the cutting away for repairing after plumbing, etc., as “they should be directed.” It necessarily follows from the terms of the contract that the defendant was bound to give such directions as were required to prepare the same, and upon a' failure to do so, that he should be held responsible for the damages which ensued by reason of his neglect in this respect. Acóording to this condition, the defendant exercised a supervisory control over the progress of the work, and it was a part of his duty to see that it was conducted properly and with the exercise of ordinary care and skill, so as to prevent injuries to other parties. It is said that by the contract between the defendant and the owners, and between the defendant and the subcontractors, the architect had the sole power to give such directions and did so, and if any damage resulted he is chargeable with the same. It is true that the contract of the defendant with the owner provides for the performance of the work agreeably to the drawings and specifications made by the architect within the time named, in a workmanlike and substantial manner to the satisfaction and under the direction of the architect. But this provision evidently contemplated a general supervision for the purpose of determining whether the construction of the building proceeded in accordance with the contract, so as to enable the architect to give the proper certificates when satis
It is said that even if the duty devolved on the defendant to give directions to cut the recess, that this obligation was substantially complied with. The referee has found otherwise, and there is no such preponderance of evidence as would justify a disregard of his finding in this respect. As the defendant knew that this recess was necessary and had not been made, and as he did not give the proper directions nor provide other temporary means as he was lawfully bound to do, by which the rain could be carried off, the conclusion is irresistible that he was negligent, and liable to answer for the damages caused by means of such negligence.
The liability of the defendant for damages caused by the failure of Moore & Bryant to protect the sidewalk, by reason of which the water flowed upon the plaintiffs’ premises presents a more difficult question. T concur with the referee’s finding, that the responsibility which resulted devolved upon them, and for their neglect in not taking the proper steps to prevent the water from injuring the plaintiffs, the defendant was not liable. He was under no obligation by his contract to give any directions as to this portion of the work, and he had no control or authority over the mode or manner of its performance, and only a right to insist generally that the work be done according to the terms of the contract. He stood in the same relation to Moore & Bryant, as the owner of the building occupied towards him. The work was to be performed by the subcontractor, and the defendant was not bound to give directions in regard to its details, except as specially provided for. He was not in the position of one who 'employs others to help him in prosecuting a piece of work and to perform the same under his control and direction, and who as the superior of the workmen
The defendant not being liable for the negligence of Moore & Bryant, as subcontractors, could he be liable for the damages which followed, upon the ground stated by the referee in his report ? It is true the defendant and Moore & Bryant were not jointly interested in reference to the separate acts which produced the damages. Although they acted independently of each other, they did act at the same time in causing the damages, etc, each contributing towards it, and although the act of each, alone and of itself, might not have caused the entire injury, under the circumstances presented, there is no good reason why each should not be liable for the damages caused by the different acts of all. The water from both sources commingled together and became one body concentrating at the same locality, soaking through the wall into the plaintiffs’ premises and injuring the plaintiffs’ property ; and it cannot be said that the water which the defendant’s negligence caused to flow upon the plaintiffs’ premises, and
There was no error in the admission or rejection of evidence, and no ground is shown for reversing the judgment.
Judgment affirmed, with costs.
All concur.
Judgment affirmed.