Majority
Headnote
In 1814 D. conveyed to M. & B. certain premises, with, the privilege, should it be necessary for the purpose of driving machinery thereon, to construct a dam across a creek on other lands of D., and to take the water therefrom in race-ways, so as to give the grantees “the best possible use of the water.” Under this grant a dam was built on D.’s land. In 1864, the old dam having become dilapidated, defendant, who had succeeded to the title and interests of M. & B,. built a dam on his own lands, and the old dam was removed. Plaintiff, who claimed through mesne conveyances from D. certain lands above the old dam flowed by its waters, brought this action to recover damages for flowing his lands by means of the new dam. It was found, in substance, that the new dam did not set back the waters upon plaintiff’s premises to a higher point than the old dam, as it was a few years before its abandonment, and until it became 'dilapidated. Held (Dwi&ht, 0., dissenting), that by the grant to M. & B., they were not only permitted but required to adopt all proper and practicable means to obtain the use of the waters without erecting a dam on the lands of D., and when the original necessity for its erection ceased, and the use could be obtained by a dam on the premises conveyed, without an increase of the flow upon plaintiff’s land, defendant had the right to make the change; that while the erection of the old dam, and the subsequent use of the water so acquired, may have fixed and limited the right of flowage, the erection of the new dam and the abandonment of the old did not terminate the right; and that plaintiff could not maintain his action.It is claimed on behalf of the plaintiff that the referee has not found facts sufficient to establish a prescrip
First. That in the year 1816, the said grantees, or their assigns, erected a building for a cotton factory upon the land so conveyed to them, and also a dam across said creek on the land of said Dill, within forty rods of the great falls thereon, and thirty rods, or thereabouts, above said factory, for the purpose of supplying water to the said factory ; and that the factory was used and supplied with water by the said dam and the race-ways therefrom, since the time of its erection until the construction of a new dam in the fall of 1864, as hereinafter stated.
Second. That the plaintiff, in the year 1845, acquired the title (subject to the rights of the grantees of the land so granted to Hiller and Beach) to his lands through sundry mesne conveyances from Dill, and that he has erected mills and machinery thereon to be operated by the water power of the said creek, but those lands do not include that on which the said dam was erected.
Third. That in the fall of 1864, a new dam with a waste-
It is further found specifically as follows : “ That the dam of 1816 set back, to some extent, the water of the creek upon the said premises of the plaintiff; that after it became dilapidated it' did not do this to the same extent as when it was new and tight; that the present dam is no higher than the dam of 1816, as originally built, and with the waste-way aforesaid has equal or greater capacity to discharge the water of the creek ; that although the water of the creek sets back upon the premises of the plaintiff to a higher point with the present dam than with.the old one, as it was for several years before the-new dam was built, this result is owing to the settled and dilapidated condition of the dam of 1816 during the time last aforesaid.”
The referee, on his construction of the grant in question and the facts so found, came to the conclusion, as a matter of law, that the plaintiff was not entitled to recover, and rendered judgment for the defendant, which was reversed at the General Term. Such reversal was made, as stated in the opinion then given by Mullin', P. J. (after a suggestion by him that the grant gave the defendant no right to flow lands by a dam erected on his own land), upon the ground “ that to authorize a judgment in favor of defendant a prescriptive right to flow plaintiff’s land must be established.” He, in a subsequent opinion given on a motion for reargument, stated that the court had also decided that the dam erected under the deed from Dill fixed the rights of the parties, and that no higher dam could be erected; that the defendant, under the grant, could not build another dam at a different place on Dill’s land, but .that it must remain on the site originally selected, and, therefore, when he built a new dam on his own land and abandoned the old, his right under the old grant terminated. The last of those propositions presents the mate
Dissent
It consequently follows that the General Term, in reversing the judgment entered, in accordance with such decision, in favor of the defendant, and granting a new trial, was erroneous. That order must, therefore, be reversed, and the original judgment must he affirmed with costs.
(dissenting). The facts of this case, as found by the referee, show that, in the year 1814, one Dill was the owner in fee of certain premises on the Owasco creek, in the town of Auburn, Cayuga county, lying on both sides of the creek. On September twelfth of the same year, he conveyed to Miller and Beach ten acres, part of these premises on the creek lying below the land now owned by the plaintiff, with the right, should it he necessary for the purpose of driving
In 1816 the grantees erected a building for a cotton factory upon the premises so conveyed to them as aforesaid, and a dam on the land of Dill, within forty rods of the falls and thirty rods above the factory, for the purpose of supplying water to the factory. This was the source of the water supply to the factory until the construction of the new dam, hereinafter referred to. The defendant, prior to 1864, succeeded to the rights of Miller and Beach, and also to the title to the land on which the dam was erected.
After the erection of the factory and the dam, Dill conveyed another parcel of land on the creek to the plaintiff. This was higher up than that conveyed to Miller and Beach, and subject to their rights.
In 1864, the dam of 1816 having become dilapidated and settled, the defendant built a new dam upon his own land, about thirty rods below. At that time the timbers of the old dam had in part gone out, and in 1865 it was practically destroyed.
The dam of 1816 set back, to some extent, the water of the creek upon the plaintiff’s premises. After it became dilapidated it did not do this to the same extent as when it was new and tight. The present dam is no higher than that of 1816, and has equal capacity to discharge water. Though the water of the creek sets back upon the premises of the plaintiff to a higher point with the present dam than with the old one, as the latter stood several years before the new dam was built, this difference is owing to the settled and dilapidated condi tion of the dam of 1816, during the latter part of its existence.
Under this state of facts the question is, (1) What are the rights of the defendant under the deed of 1814, considered as a grant ? (2) What are his rights, if any, under the theories of prescription ?
Illustrations of this subject may be derived from grants of rights of way. A distinction is taken between a grant which is indefinite in its limitation and one where, from the nature of the use or from its terms, it is restricted and defined. Thus, if a way be granted to a particular corner of a field, the grantee of it may not enter at any other point. (Henning v. Burnet, 8 Exch., 187.) So a right of way “ over and along ” a strip of land does not give a right to go “ across ” it. (Senhouse v. Christian, 1 Term R, 560.)
Had there been in the ease at bar a general right to flow for the purposes of a water power, the land now the property of the plaintiff, it would have been immaterial where the dam was placed. The contract would then have been for a certain amount of burden upon the land. But that is not this case. The contract here is to erect a dam in a specified place, and to obtain a water power in that manner. Although the land on which the dam stands may now belong to the defendant, yet
In Jennison v. Walker ( 11 Gray, 423 ), the defendant had a right to lay an aqueduct across the plaintiff’s land, from a spring to his own land. Having laid down logs for this purpose, it was held that he could not afterwards change their direction. The principle was laid down in the following terms: Where an easement in land is granted in general terms, without giving definite location and description to it, so that the part of the land over which the right is to be exercised cannot be definitely ascertained, the grantee has not thereby a right to use the servient estate without limitation as to the place or mode in which the easement is to be enjoyed. When the right granted has been one exercised in a fixed and defined
In the case at bar, the plaintiff is in no way affected by the fact that the defendant has acquired the ownership of the land on which the dam originally stood, in addition to that on which the new dam is constructed.
He purchased simply subject to a dam to be erected on
2. If the defendant could maintain a prescriptive right to the property, another rule would be applicable. That would have given him a right to flood the land to the hight which his dam had set the water back for twenty years, without any reference to the place where the dam had stood. The substance of a prescriptive right is the burden or easement upon the land, and the mode in which it is exercised is immaterial. So a change in the place of a dam is of no importance under a claim by prescription. (Davis v. Brigham, 29 Me., 391 ; Stackpole v. Curtis, 32 id., 382; Whittier v. Coeheco Mfg. Co., 9 N. H., 454 ; Washb. on Easements, 105, parag. 53.) In this respect it differs materially from a right created by a specific grant, which can only be exercised in accordance with its terms.
The defendant, however, cannot claim by prescription in the present case, but must confine himself to his grant. Where an easement has been created by grant or reservation, no use of it will be held to be adverse, which can be construed to be consistent with the terms of the grant or reservation, and consequently the extent of the easement will be limited by the terms of such grant or reservation. (Washb. on Easements, 94, par. 37; Atkins v. Boardman, 20 Pick., 291 ; S. C., 2 Metc., 457 ; Gayetty v. Bethune, 14 Hass., 49; Wheatley v. Chrisman, 24 Penn. St., 298 .) In other words, the law never presumes a grant nor raises a prescription from actual use where there has been an express grant to which the use substantially conforms. (Same cases.)
But if a prescriptive right could be set up there is another difficulty in the present case. There is no finding of fact that the dam maintained its original hight for twenty years. It was found to be settled and dilapidated when the new dam was erected. How long this had been so was unknown, or at least was unascertained by the referee. If, during a portion of the prescriptive period, the dam had been leaky and for that reason the water had not been set back to the full
The case, when summed up, amounts to this : The plaintiff must rely upon his specific grant. This does not authorize him to change the location of his dam. He cannot claim by prescription for two reasons: First, because that doctrine does not apply where the use substantially follows the grant. Second, because the use has not been shown to be continuous in such a sense that the water has been kept up for twenty years to the hight to which the new dam now sets it back.
The judgment of the court below should be affirmed.
All concur with Lott, Oh. 0., except Dwight, 0., dissenting.
Order reversed, and judgment on report of referee affirmed.