Majority
Headnote
In 1870, S. & K., at the request of J,, who was constructing a bridge, and upon his promise to pay therefor, furnished materials and performed labor upon the bridge, mostly for temporary work necessary for the permanent structure. In November, 1871, defendant, for a good consideration, agreed with the administratrix of J. to pay S. & K. such sum as should appear due to them from J. for such work and material, “ under a certificate from the engineer in charge of said work.” In an action upon the agreement held, that it called for a certificate from ■ the engineer in charge of the work at the time the materials were furnished and labor performed; also that a procurement and presentation of the certificate or notice to defendant of its contents, and a demand of theAccording to the case made by the original complaint, one Jackson was engaged during September and October, 1870, in the construction of a bridge (for the city of Brooklyn) over Bushwick creek, and induced Sherman and Kiyler to furnish materials and perform labor thereon during those months to the amount of $2,584.39, which he agreed to pay. Without doing so he died, and Mary Jackson was appointed administratrix of his estate.
Thereafter, on the 23d of November, 1871, for a satisfactory consideration to him paid, the defendant agreed with her that he would pay Sherman and Kiyler such sum as should appear due to them from her intestate “ for work and material done and furnished by them in the construction of said bridge, under a certificate from the engineer in charge of said work * * * and hold her harmless from any claim of the said Sherman and Kiyler, which should be justified by the certificate of said engineer; ” they assigned their claim against the estate of Jackson to the plaintiff. In September and October, 1870, one John McOloskey was the engineer in charge of the construction of the bridge, and he, in writing, certified the above sum with interest to be due Sherman and Kiyler from said estate, by reason of such work and material. The certificate of McOloskey was before suit exhibited to the defendant by the plaintiff, and payment of the amount therein certified to be due has, since its presentation, been demanded by the plaintiff of the defendant, but he refuses to pay.
The defendant by answer denied, among other things, that McOloskey was the engineer in charge of the construction of the bridge at the time stated, and upon this issue much evidence was given upon the trial.
Before its conclusion, however, the trial judge ruled: that the certificate of the engineer was a condition precedent to the plaintiff’s right of recovery; that McOloskey was not engineer at any time, and that what he did amounted to nothing, so far
Two questions arise : First, Did the agreement require a certificate from the engineer in charge of the bridge during September and October, 1870, the time the work and material were furnished by Sherman and Kiyler ? Second, If not, was the plaintiff’s cause of action complete without notice to the defendant of Faron’s certificate, and a demand under it of the sum ascertained to be due ?
First, We have no evidence of the agreement between the parties, except as it is set out in the pleadings, and from that our conclusion accords with the theory on which the action was brought and which led to the averment that McCloskeyj the engineer in charge of the work in September and October, gave the certificate and so enabled the plaintiff to allege performance of the condition precedent on which the defendant’s liability depended.
Jackson was dead. The defendant had no knowledge of the work done or the material furnished; the sum due was an unliquidated and uncertain amount to be ascertained by reference to matters known to Sherman and Kiyler, the other party
The bill included piles, excavation, bailing and drawing off water, lumber and plank for scaffold, labor in building and re-constructing it, driving piles, taking up and replacing the same. Much of the materials and work was evidently of- a temporary nature, necessary for the permanent structure which was to follow it, and of a character to be estimated only by a daily eye-witness, or one whose duty required his actual supervision of the work.
The defendant agreed to be bound by the determination of such a person, because from his knowledge the necessary information could be drawn. It is impossible to suppose that one having no personal knowledge of the work, or means of acquiring it, and whose connection with the structure began long after the services were rendered and material furnished, could have been selected by a person wholly ignorant as to these things, to determine, not only the quantity of each, but the amount due therefor.
The theory of the complaint accords with this view, and is, we think, the correct one. It agrees with the nature of the contract and the object which the parties had in mind in calling for the certificate. This conclusion leads to a new trial.
The case comes within the principle that notice is necessary ■ where the thing lies more properly in the cognizance of the plaintiff than of the defendant (Vin. Abr., Notice, A, 2, Pt. 12, or as stated in Vyse v. Wakefield (6 Mees. & Weis. 451) when “it is to do a thing which lies within the peculiar knowledge of the opposite party, then notice ought to be given to him.” Whether we take this literally or as interpreted in Lamrphere v. Cowem ( 42 Vt. 182 ), to mean to do a thing “in an event which lies,” etc., it applies here.
The certificate is the fact upon which the obligation of payment depends, and is wholly within the control of, and for the plaintiff’s advantage, and so the case is also within the last clause of the rule stated by Chitty, which makes notice necessary where there is an express stipulation in the contract, or where it is requisite from the nature thereof that demand of performance be made.
The very nature, if not the form, of the defendant’s covenant
His proposition implied correlative right and privilege, not only to see and examine the certificate, but to pay the amount certified, without suit. These rights could not be available until the ignorance under which he labored as to the sum due from Jackson was dispelled. The debt was the debt of Jackson, and the legal effect of the undertaking to pay that debt is “ procure the certificate and let me know its contents and I will pay the sum justified by it.” Hotiee was, therefore, a condition precedent to the defendant’s liability, the same as if such stipulation had been expressed in the contract. It follows that without proof of the proper certificate, and notice and demand based upon it, and a refusal to pay according to its terms, there could be no breach and consequently no right of action. The eases cited by .the respondent upon this point do not hold the contrary. In Locklin v. Moore ( 57 N. Y. 360 ), a specific sum was due for goods sold by plaintiff to defendant; in Lamphere v. Cowen, 42 Vt. 182 , “the defendant knew of the existence of the debt, the amount, and to whom due.”
■ The learned counsel for the respondent has, since the oral argument of this case, submitted a supplemental brief, by which he claims the benefit of McOloskey’s certificate, in case it should be held that one was required from the engineer in charge of the work in September and October, 1870.' It is a sufficient answer to this position that the trial court excluded it and put its decision upon another and inconsistent ground. But it should also be added that whether McOloskey or Meserole, of whom mention was made in evidence, or some other person was the engineer in charge in September and October, 1870, is a question of fact, and may very well go before a jury. It is enough now to say that the plaintiff cannot sustain the
As the decisions of the trial court turned upon a different construction of the agreement, and were inconsistent with the views above presented, we think the judgment should be reversed, and a new trial granted, with costs to abide the event.
All concur, except Tract, J., absent.
Judgment reversed.
Cases cited
- Genesee College v. Dodge 26 N. Y. 213 p. 39
- Halleck v. Moss 22 Cal. 266 p. 39
- O'Connor v. Dingley 26 Cal. 11 p. 39
- Locklin v. Moore 57 N. Y. 360 p. 39, p. 44
- Prentice v. Knickerbocker Life Insurance 77 N. Y. 483 p. 39
- Koehler v. Adler 78 N. Y. 287 p. 40
- Elsey v. Metcalf 1 Denio. 323 p. 45
- Stanton v. Wetherwax 16 Barb. 259 p. 45
- Rogers v. Murray 3 Bosw. 357 p. 45