Majority
Headnote
1. Master and Servant—Negligence of Master.The plaintiff, a locomotive engineer in the employ of the defendant, was injured February 5, 1904, while operating his engine on the defendant’s track between Buffalo and Niagara Falls, and claims that the .defendant is responsible for the injuries sustained by him. The line of-the defendant from Buffalo to Niagara Falls consists of two parallel tracks extending in a general northerly and southerly direction. The westerly one of these is for east, or more properly south, bound trains, and is called the “east-bound track”; and the other the west-bound. Tonawanda Junction and Williams-ville are two stations, about six miles apart, on this route, and the accident occurred in a cut between these two places. The plaintiff had been running an engine on a passenger train over this route for seven years, and each day made the round trip two or three times. On the
The complaint alleges two causes of action. The first one charges that the defendant had “carelessly and negligently thrown” this snow upon the track, and “carelessly and negligently allowed and permitted” it “to remain upon said track,” and then alleges the service of the notice in pursuance to the employer’s liability act (chapter 600, p. 1748, Daws of 1902). For the second cause of action it is alleged that the train which the plaintiff was operating was run and operated by telegraphic orders issued in the usual manner advising him that the track was clear, and “that said orders so issued to- this plaintiff and conductor were false and untrue, and were falsely and untruthfully, carelessly and negligently issued by this defendant, or by and through the carelessness and negligence of its superintendent or foreman or person entrusted with and exercising superintendence over the operation of said train”; that the plaintiff ran his train in reliance upon these orders. No evidence was given showing the way in which the snow came upon the track, if it was there at all. After the snow plow had removed the snow, the space between the tracks, about eight feet, contained a pile of snow about five feet wide at the base and slanting upwards from four to six feet. The gist of the first cause of action was that the snow had been thrown upon the-track by the snow plow, but the witnesses testified otherwise; and at the close of the evidence the counsel for the plaintiff "disclaimed a right to recover under the first cause of action.” This disclaimer is not very important, as there was no evidence to support the claim. There was no evidence to sustain the charge that the defendant falsely issued the telegraphic orders, which is the gravamen of the second cause of action, and the trial judge expressly charged that no negligence could be founded upon any act or omission of either the train dispatcher or the operator
“I think it may be said that it is self-evident that according to the testimony, all of the testimony in this ease, if there was any snow upon the westbound track, it came from the body of the snowbanks on the one side or other of the tracks, or from both.”
There was no evidence that the snow came from either side of the track. The rotary plow was one in common use, was operated in the usual way, and there is no evidence that its impact with the snow on the east-bound track crowded the snow between the tracks on the westbound track, and none which would justify that inference. The jury were left to speculate over the way in which the snow was piled on the track. Negligence is imputed to the defendant, and the specific acts constituting it. should have been shown; otherwise, the defendant could not meet the accusation. The complaint alleged one ground of negligence, another was submitted to the jury, and there was no evidence in support of either. The judgment and order should be reversed, and a new trial granted, with costs to the appellant to abide event.
Judgment and order reversed, and new trial granted, with costs to the appellant to abide event. All concur.