Majority
Headnote
1. Appeal—Reversal—Actions Against Joint Tobt-Feasobs—Reversal as to All.This is a statutory action to recover for the death of Frederick Draper, alleged to have been caused by the negligence of the three defendants, and there has been a recovery against all. The National Conduit & Cable Company took a separate appeal and prepared a separate record. Its appeal was argued and is to be decided herewith. On that’ appeal we have decided that errors prejudicial to the appellant were committed, and we have reversed the judgment and ordered and directed a new trial. 108 N. Y. Supp. 686 .
Our attention was drawn by the points of one of the appellants to the case of Bamberg v. International Railway Company et al., 121 App. Div. 1 , 105 N. Y. Supp. 621 , and it is claimed upon the authority of that decision that the reversal as to one of these defendants requires a reversal as to all. If so, of course, it is immaterial whether or not errors were committed prejudicial to the appellants in this record. In the Bamberg Case the plaintiff charged that he sustained personal injuries through the negligence of both defendants. The plaintiff was a passenger on a street car, and he was injured by a collision between the street car operated by the International Railway Company and a
The action is not brought under the employer’s liability act. Upon the trial counsel for plaintiff stated that his claim with reference to the negligence of the Subway Construction Company was its failure to provide decedent with a reasonably safe place in which to do his work,.
The learned counsel for the respondent contends that this evidence was immaterial', unless it was shown in connection therewith that the Interborough Company did not control or direct the train. The evidence shows that the cars were loaded in the yards of the Interborough Company at 148th street by employés of the construction company; that the cars were then taken by the engine down to 143d street; and that at this point one Curran, who was a dispatcher of trains in the employ of the Interborough Company at its 145th street station, informed the conductor, in substance, that the way was clear and to get on the front end and take the train through the tunnel. The tunnel was some blocks to the northeast. Curran also so informed an employe of the Subway Construction Company, who had alighted from one of the cars for the purpose of preceding the train through the tunnel, but by. whose direction, if any, does not appear. It appears, according to the evidence introduced in behalf of these appellants, that one De Wyrall, who was in the employ of the construction company and had full charge of the concrete construction, including ordering and directing trains for the transportation of material for use in his work, but not of this crew on the flat cars, had come through the tunnel from the north, and had within 30 minutes before the accident notified the employés of the cable company to remove the ladder, plank, and reel from the vicinity of the track, as he was about to let a cable train through, and that thereafter and before the train was sent through he informed Curran that the way was clear and he could let this train go through. It appears by the testimony of Merritt, superintendent of operation for the Interborough Company, that after the train left 143d street it was not directed or controlled by his company, and that from time to time he received requisitions from the construction company for motors and trains. This evidence indicates that the employés of the construction company must at least have directed with respect to the destination of the trains.
We are of opinion, also, that there must be a reversal as to the construction company. Where, as here, three different defendants are joined in an action in which each of them is charged with separate acts of negligence, the facts relating to which are somewhat intricate and complicated, it is important that the jury should be clearly instructed with respect to the facts upon which the liability of each depends. The learned trial justice apparently realized this, and endeavored to present the case to the jury so that they would understand the nature of the charge against each defendant; but the case presents so many phases that he overlooked some very material considerations. If the conductor and engineer were in the employ of the Interborough Company and the train was being operated by it, then, manifestly, the construction company would not be liable for their negligence in operating the train, with respect to speed, signals, or keeping a proper lookout; and if, on the other hand, the train was being operated by the construction company, the engineer and the conductor would be coemplóyés of the decedent, for whose negligence it would not be liable. Neither of these matters was specifically alluded to in the main charge; but at request of counsel for appellants the court did instruct the jury that, if the train was being operated by the construction company, the engineer and conductor would be co-employés of the decedent. If, as testified to by two witnesses for the construction company, the employés of the cable company were notified that the train was to be sent through, and were directed to remove obstructions that they had placed upon the track, and they observed that this was done, and the train was sent through within 20 minutes thereafter by the Interborough Company, with its conductor and engineer in charge, it is difficult to discover any theory of the evidence on which the liability of the construction company could be predicated. It certainly could not then be said to be guilty of negligence in not providing a safe place for decedent to perform his duties of employment. The negligence, then, would be on the part of those in charge of the train and of the employés of the cable company.
The plaintiff, in joining the three defendants in a single action, has so confused the issues that it is difficult for a jury to fairly weigh
It follows that the judgment and order should be reversed, and a new trial granted, with one bill of costs to appellants to abide the event All concur.
Cases cited
- Bamberg v. International Railway Co. 121 App. Div. 1 at 105 p. 692
- Stedeker v. Bernard 102 N. Y. 327 p. 693
- Newburgh Saving Bank v. Town of Woodbury 64 App. Div. 305 p. 693