Majority
Headnote
Í. Contracts (§ 287*)—Construction—Decision op Engineer.On August 17, 1906, John J. Young entered into a contract with the city of New York for the regulating and grading of Washington avenue in the borough of Queens'. This contract was awarded to Young on proposals after competitive bidding upon printed specifications which were made expressly a part thereof. The expense of the public improvement in question was to be met by assessment on the property benefited thereby. The street in question was to be graded between Vernon avenue and Academy street. Over a portion of the route there was considerable excavation to be done to bring the street to the prescribed grade. For a considerable distance the street, some 60 feet wide, passed over low-lying marshy lands, parts of which were covered with water at high tide. The surface of the street as graded was considerably above the level of the marsh over which it was to be carried by a causeway or embankment of earth. The contract was a unit contract; that is, the work was divided into respective units for which respective prices were fixed in accordance with the quantities embraced in each unit. The proposals for bids stated these units approximately only, and provided for approximately “80,000 cubic yards of earth filling (furnished).” The contract as awarded to Young contained a clause that he should be paid “For all embankment, in excess of excavation per cubic yard, the sum of ninety (90) cents ($0.90).” The contract in question was made on a printed form, ordinarily employed in the borough of Queens, for street improvements. In this form, as printed originally, the clause ^appears as follows: “For earth filling furnished, per cubic yard.” Before the execution of the contract this clause was altered by drawing a pen through the words “earth filling furnished” and inserting in place thereof the words “all embankment, in excess of excavation.” During the progress of the work, Young assigned his interest under the contract to the plaintiff.
The plaintiff claimed that, in constructing the causeway or embankment across the marsh, the contractor used 99,988% cubic yards of material, a very large part of which was ashes of hard coal, and that of this total there were 85,494% cubic yards “in excess of excavation,” for which it should be paid at the rate of 90 cents a cubic yard. The engineer in charge of the work, however, refused to allow the claim of the contractor and made a certificate which fixed the amount payable to the contractor at $40,425.75 less than the contractor’s claim. The controversy presented on this appeal does not arise from any dispute as to the quantity of material that went into the completed embankment, but arises from the interpretation of the provisions of the contract and specifications governing the method of measurement of the material used to form the embankment. It appeared on the trial that, when the contractor came to construct the embankment within the street lines across the marsh, large quantities of the deposited material sank below the surface of the marsh, and upon which further deposits were required until the embankment became firmly bedded and was carried to the required grade of the street. The contractor, and his assignee the plaintiff, claims that the measurement for purposes of payment should be from the bottom of the embankment,
[1] In so doing, the engineer considered certain clauses of the specifications as controlling on this point, and unless his interpretation of said clauses is palpably erroneous, for by the contract he was made the arbiter of all controversies arising from claimed ambiguities, his certificate was conclusive. Molloy v. Village of Briarcliff Manor, 145 App. Div. 483 , 129 N. Y. Supp. 929 ; Burke v. Mayor, etc., 7 App. Div. 128 , 40 N. Y. Supp. 81 .
[2] It is contended by the plaintiff that the specifications contain no agreed rule for the measurement of “embankments” required in the performance of the contract, while the respondent asserts that this question is determined plainly by the specifications. Before turning to the latter, it is well to bear in mind the exact situation before the parties when the contract was made. The street was to be graded to a level or grade shown on certain plans. To make this grade required excavation to a lower level on certain parts of the street and a continuation of this fixed grade across the lowlands of the marsh. To do this, an earth embankment, properly sloped, was provided for. So to bring about the grade established, material was taken out in places to cut down the natural grade, and material had to be deposited in certain places to fill up to the established grade. Where the street crossed the marsh, the result of filling up was an embankment with prescribed slopes. The specifications contained a subdivision headed “Billing and Embankments.” This subdivision contained, among others, two clauses numbered respectively 13 and 14, which read as follows :
“(13) When the material excavated, fit for filling, is insufficient in quality ■to regulate the street, such additional material necessary shall be furnished, and placed by the contractor, and the quantity thereof to be paid for as ‘filling to be furnished’ shall be the difference between the total amount of filling done and excavation made, with slopes' in case as herein described and to the grades shown on the cross-sections of the street.
“(14) The total amount of filling done will be determined by calculation, and will be only so much as is included between the elevation of said surface of deposit, as recorded by the engineer, and the grades hereinbefore set forth (where such filling comes up to such grades), and no allowance will he made the contractor for any shrinloage, sinking or settlement.” (Italics ours.)
Then follows a clause as follows:
“All filling shall be good, wholesome earth, free from all frozen materials, garbage, vegetables, spongy or unsuitable matter.”
The words in the fourteenth clause that “no allowance will be made the contractor for any shrinkage, sinking or settlement” are very clear and significant. They cover unmistakably a case where the deposited material may sink or settle beneath the original surface of deposit. Thus; if these clauses control, then the engineer was right in giving his certificate, and the learned trial court dismissed the plaintiff’s complaint properly. But, urges the appellant, clauses 13, 14, and 15 do not use the word “embanlcment,” and therefore do not apply to “em
[3] As before indicated, the expense of this contract, as recited in the instrument itself, was to be borne by the property benefited through local assessment. Under well-settled rules of law, the city was acting only as the agent for the property owners so affected. The contractor had notice of this fact, the specifications were before him, he was bound to exercise good judgment, and to acquaint himself with the actual conditions which confronted him, in the performance of the work. For any error of judgment on his part, the courts cannot come to his rescue by conjuring up an ambiguity where none exists reasonably, especially where the result would be either to increase the burden of the local assessment or to imperil the validity of the assessment- itself.
The judgment should be affirmed, with costs. All concur.
Cases cited
- Burke v. Mayor of New York 7 App. Div. 128 p. 980