Majority
Headnote
1. Eminent Domain (§ 184[3] )—Exercise of Power—-Waiver of Statutory Requirements.Chapter 508 of the Laws of 1884 authorized the superintendent of public works to construct “a channel or canal between the waters of Shinnecock and Peconic Bays, at Canoe place, in the town of Southampton, county of Suffolk,” and for this purpose the superintendent was authorized “to enter upon all and singular the land or lands necessary for making, digging and perfecting the said channel or canal and devices pertaining thereto, and to enter into agreements or contracts for the purchase of such land if such agreement can be made and the said land purchased at a fair value.” Then followed the usual provision for filing maps, etc., in the case of disagreement, or the incompetency of the owners to convey, whereupon the title to such land was declared to vest in the state. The owner of any land so taken, it was provided, “shall be entitled to compensation in damages, to be ascertained and appraised as prescribed by law.” Section 5 of the act then provided that:
I£ “it shall be necessary for said superintendent to occupy the lands of any railroad company for the purpose of said channel or canal, or to cut through or to intersect the same, he shall give at least ninety days’ notice of such intention to said railroad company, and in case of disagreement as to the amount of compensation to be made therefor, the same shall be ascertained as prescribed by law.”
The method of ascertaining the amount of compensation to be paid in cases of this character was prescribed by chapter 336 of the Laws of 1884, which provided that in the—
“construction or improvement hereafter of any canal or feeder, whereby the superintendent of public works or other authorized agent of this state shall appropriate private lands, streams or waters, the said superintendent of public works or other authorized agent of the state shall serve upon the owner, owners or occupant of said lands, streams or waters a written or printed notice of such appropriation duly signed by him, which notice shall contain an apt and sufficient description of the lands, streams or waters so appropriated.”
The second section of the act provided that the board of claims—
“shall have jurisdiction to hear, audit and determine the claim of the owner or owners of such lands, streams or waters and to allow thereon such sums as should be paid by the state, provided such claim shall be filed within two
years after the service of said written or printed notice, as provided in section one of this act.”
Acting under the authority of chapter 508 of the Laws of 1884, the state had prior to October, 1885, excavated the canal nearly up to the Long-Island Railroad Company’s right of way through the lands of other owners. It is conceded that the superintendent of public works never served the 90 days’ notice required by the fifth section of chapter 508 of the Laws of 1884 upon the railroad company, and that there was never any written notice of an appropriation of the railroad company’s land, as provided in section 1 of chapter 336 of the Laws of 1884. As the work approached the railroad right of way, the superintendent submitted to the railroad company plans for the intersection, which plans were disapproved by the railroad company, which sought relief through an injunction, in which it was unsuccessful. Long Island Railroad Co. v. Shanahan, 39 Hun, 657 . The bridge suggested by the superintendent as a means of carrying the railroad over the' canal was constructed, and provided for a waterway 40 feet in width, with abutments and other attachments, on the right of way of the railroad company. The exact date of this construction does not appear, but it was probably some time during the year 1886. In the early part of 1892 the bridge abutments became unsafe, owing to the action of the tides and currents, and the railroad company, to protect its adjacent right of way, was obliged to strengthen and repair the structure. It thereupon filed a claim with the board of claims in May, 1893, and procured a judgment -for repairing and strengthening the bridge, and the bill of particulars appearing in the record shows that this work embraced practically the construction of a new bridge. Prior to the filing of the claim in May, 1893, upon'which judgment was found in favor of the railroad company, and in February of that year, a dam or tide gates constructed by the state in connection with the canal about 100 feet below and south of the bridge was washed out and destroyed; and it is claimed that the tides scoured or washed out the channel from a width of 40 feet to 80 or 90 feet, and that the depth of the canal increased from 4 to 13 feet, and later to 30 feet. Some or all of these facts had developed, as above indicated, prior to the filing of the claim for the reconstructed bridge in 1893, and it is conceded by the appellant (the railroad company) that:
The “award upon the claim filed in May, 1893, was for damages for a permanent .appropriation of an easement under the law of eminent domain, the nature and extent of which easement were defined by the plans of the original bridge and the actual occupation pursuant to those plans.”
The action of tides and currents persisted it appears, and in 1898 the railroad company constructed a new bridge, with a span of 210 feet, upon the site of the old bridge; the plans for such bridge being approved by the state engineer. This bridge was completed in August or September, 1889, and on the 27th day of April, 1900, the claim now under review was filed with the Court of Claims, and was for an amount equal, it is claimed, to the actual expense of constructing the new bridge. This claim has been rejected, the Court of Claims holding that the recovery under the claim of May, 1893, was a bar to the present action. The railroad company appeals from the judgment.
[2,3] As already pointed out, the conditions which it is alleged gave rise to the necessity for the construction of the third bridge, for which the present claim is made, were open and obvious in February, 1893, while the original claim was not-filed until May of that year. The underlying principle of the law of eminent domain, as we understand it, is that private property shall not be taken for public purposes without just compensation, and that such compensation consists “óf the value of the part taken, and damages to the remainder, less any special benefits to such remainder by reason of the taking and use of the part for the purpose proposed” (Lewis on Eminent Domain, § 693 [section 471]), or, as our Court of Appeals has put it, in reference to lands taken for railroad purposes:
“The owner is. to receive, first, the full value of the land taken, and, second, where a part only of land is taken, a fair and adequate compensation for all injury to the residue sustained or to be sustained by the construction and operation of the railroad.” Newman v. M. E. R. Co., 118 N. Y. 618 , 623, 624, 23 N. E. 901 , 902 ( 7 L. R. A. 289 ), and authorities there cited.
[4] This case comes fairly within the rule that a judgment of a court of competent jurisdiction is final and conclusive upon the parties, not only as to the issues actually determined, but as to every other question which the parties might or ought to have litigated. Stokes v. Foote, 172 N. Y. 327 , 344, 65 N. E. 176 , and authorities there cited.
[5] Assuming that" there was authority under section 264 of the Code of Civil Procedure, as it existed under chapter 36 of the Laws of 1897, to allow a claim as for a continuous trespass upon the premises of the railroad company, the limitation fixed by the statute was two years, and the claim here under consideration is not based upon a trespass, but is urged on the ground that it is a part of the damages growing out of the original taking of an easement through the
Concurrence
The judgment appealed from should be affirmed, with costs. All concur; SMITH, P. J., in memorandum.
(concurring). I concur in the opinion of Justice WOODWARD, and would add a single other reason for the conclusion reached. By chapter 508 of the Laws of 1884 this improvement was authorized. The original appropriation for the building of the canal and the condemnation of necessary rights was made by the state. The act provided in section 8:
“That the said channel or canal should be maintained at the expense of the county of Suffolk. * * * ”
If, therefore, by failure to protect the said channel part of defendant’s right of way had been washed out, the liability therefor would seem to have been placed by the statute upon the county of Suffolk, and not upon the state itself.
Cases cited
- Mayor of New York v. Manhattan Railway Co. 143 N. Y. 1 at 26, 37 p. 691
- Newman v. Metropolitan Elevated Railway Co. 118 N. Y. 618 at 623, 624, 23 p. 691
- Stokes v. Foote 172 N. Y. 327 at 344, 65 p. 692