Majority
Headnote
1. Appeal and Ebbor (§ 694*)—Record—Questions Presented fob Review.This is an action to recover damages for personal injuries, alleged to have been sustained by the plaintiff through the negligence of the defendant on the 11th day of January, 1911.
The New York Central & Hudson River Railroad Company’s Fiftieth Street power house, at the southwesterly corner of Lexington avenue and Fiftieth street, borough of Manhattan, was in part demolished and so badly shattered and wrecked by an explosion as to render it unsafe and to require its complete demolition. The John Pierce Company was the. general contractor for the erection of the Grand Central Terminal Station, and it was given supervising authority over the execution of certain work by other contractors. The architects of the Grand Central Terminal Station gave the Pierce Company a verbal emergency order, confirmed in writing under date of January 3, 1911, to make repairs to piping necessitated by the explosion, and directed that all steam, air, and water lines be restored to their former condition, and that necessary repairs to the plumbing be made. The defendant had been previously employed by the railroad company after the explosion to remove the débris and to completely demolish the building. The order in writing to the Pierce Company contained the following:
“Parties making repairs to the lines underneath the Battery House must confer with Terry & Tench’s representative in charge of removing the débris from the building, in order to minimize the danger of accident to workmen.”
The firm of Baker, Smith & Co., by whom the plaintiff had been employed in the steam fitting business for 22 years, had the steam fitting and plumbing contract in connection with the erection of the new station, but were required to do their work under the supervision of the Pierce Company. The order was communicated by the receiver of the Pierce Company to Baker, Smith & Co. the next day and in the same form. No formal notice was given .by the plaintiff’s employer to the defendant, and the only evidence on the subject of conferring with the defendant, as directed in the order for the work, is the testimony of the foreman of Baker, Smith & Co. to the effect that he told one of the foremen of the defendant that he was coming in to repair the pipes, and where to remove the débris from to enable that work to be done, which was corroborated in part by the testimony of one of defendant’s foremen and the testimony of Baker, Smith & Co.’s superintendent to the effect that he pointed out his mén to a watchman and foreman in the employ of the defendant and directed them “to be careful of them.”
The framework of the building was of steel construction, which was reinforced by hollow tile concrete and brick. The building was three stories in height above the level of the street and extended from Lexington avenue westerly about halfway to Park avenue, and rested
The accident occurred on the fourth day the plaintiff was working there. The defendant’s employés were engaged in clearing up the wreck and removing the material by wheeling some of it onto cars at the track level and by hoisting the rest with an engine and derrick onto Fiftieth street. The derrick stood on the southerly side of Fiftieth street just west of Lexington avenue. According to this testimony of the plaintiff, the work was prosecuted by the defendant from east to west, and he and a helper, in doing their work, followed the cleaning gang employed by the defendant. The plaintiff testified that on the day of the accident the defendant’s employés had finished removing the débris from the three easterly bays, and the material from above them, and were working on and over the fifth bay, from 30 to 60 feet to the west. One gang of the defendant’s employés were working on the second floor knocking cement off the iron girders and columns with sledges; and another gang of 35 or 40 men were engaged in filling buckets with material at the track level, and it was being hoisted and swung to the street. At the time of the accident the plaintiff had sent his helper upstairs for a piece of flange connection. A water line had fallen down where the plaintiff was working, and he lifted it into place and blocked it up over the air line with a piece of joist, and was walking out of the bay to the south on, or standing on,, a plank runway constructed to enable the defendant’s men to wheel earth out of the bays onto the cars, and passing over the lines of pipe and extending southerly toward the car track. While in this position, the plaintiff heard a noise as of something falling back of him toward Fiftieth street, and he was struck on the back of the leg and knocked off the runway by a piece of concrete, described as 12 or 13 inches long and wide and 6 inches thick, and weighing about 20 or 25 pounds. It fell in the bay
The uncontroverted evidence shows that the defendant caused wire screens about 5 feet square to be erected around the columns under the place where its employés were loosening and dropping cement, and that there was such a screen underneath where the pieces of cement in question were cut loose and dropped. There was no wire screen immediately over plaintiff at the time, but there were screens around the columns near him. There is a conflict in the evidence as to whether the derrick was moving material at the time, and as to whether the cement fell from the bucket of the derrick or was dropped by the men working above; but the uncontroverted evidence shows, and the court charged the jury:
“That from whatever source or place the piece of concrete which hit the plaintiff fell, it struck an iron beam and was in this way deflected from its course, so that it struck the plaintiff at a point between twenty-five and thirty-five feet to one side.”
The evidence also shows that in the manner in which the work was being conducted by the defendant’s employés the bucket of the derrick did not come nearer than 30 feet to a line perpendicular to the place where the plaintiff was working. The evidencé on the part of the defendant, which was uncontroverted excepting by the testimony of one witness who thought the cement fell from the bucket of the derrick, and evidently, as counsel for plaintiff virtually concedes, was mistaken, shows that defendant’s employés cut this cement loose with a view to letting it drop at a point where it would strike at least 30 feet distant from where plaintiff was. The evidence on the part of defendant also shows that it had two or more watchmen stationed to give warning when material was about to fall, and that such warning was given by shouting, “Look out below!” a minute before the cement dropped. The plaintiff testified that he did not hear the signal or any such signal that day. Evidence was adduced on the part of the defendant tending to. show that it posted notices of warning of danger at different places, about the premises, and in the vicinity of where the plaintiff was working, and that it was not aware that any employés of Baker, Smith & Co. were working on the premises, and supposed that the men working there were in the employ of the railroad company, and that it had protested to the railroad company against its permitting its employés to work there, owing to the danger involved. There is, however, -evidence tending to show that one of the defendant’s foremen knew that- the plaintiff was working for Baker, Smith & Co., and that he had been given orders to do any laboring work required in the prosecution of the work which the defendant was doing.
[1] At the close of the plaintiff’s case, a motion was made for a nonsuit, and denied with a suggestion that it be renewed at the close of.
[2, 3] The defendant was lawfully on the premises, engaged in the prosecution of contract work with the owner. The owner thereupon, at most, licensed the defendant’s employés to go upon the premises and prosecute the work for which they were employed, subject, however, to the prosecution of the work by defendant. The defendant was not obliged to suspend its work. The defendant owed no duty of active vigilance to the plaintiff; at most, it was only obliged to exercise ordinary care in the prosecution of its work, and, if there was any risk of injury from the prosecution of the work in that manner, the plaintiff, in accepting employment and working where he did, took the risk of such injury upon himself. There is no evidence of any specific negligent act on the part of any employé of the defendant. It is true the cement was allowed to fall, but it cannot be said that that was not a reasonable manner in which to perform the work for which the defendant was employed. The evidence on the part of the plaintiff tends to show, as already stated, that there was no wire screen immediately over him; but, if so, he knew that as well as did the defendant, and whatever danger was involved, from the manner in which this accident happened, was as well known to him as to the employés of the defendant. The material was not falling where he was, and he considered it perfectly ' safe, because, as he put it, he was “30 feet from where these things were falling,” and for that reason he testified “it was safe, as safe as I am here in the chair.” Negligence should not be imputed to the employés of the defendant for not considering it dangerous and taking other measures to prevent the accident. If it is not for us to say now, as matter of law, that it should not have been foreseen by the defendant, in the exercise of reasonable care, that a piece of cement of this size and weight on being dropped from a height of 40 feet or less would, on striking an obstruction 10 or 11 feet below the point from which it was dropped, be deflected 30 feet and hit plaintiff, it is at least competent for us to say that a verdict attributing negligence to the defendant for failing to foresee such an accident is against the weight of the evidence.
[4] The verdict of the jury may be accounted for owing to certain errors in the charge. The learned court instructed the jury with respect
It follows therefore that the judgment and order should be reversed, and a new trial granted, with costs to the appellant to abide the event. All concur.