Majority
Headnote
1. Street Railroads (§ 38[2] ) — Construction—Pavement between Tracks.The plaintiff, a railroad corporation, operating a trolley line in the city of Newburgh, brings this action against that city and its collector of taxes to restrain the collection of an assessment for paving a part of Broadway in said city, in which the plaintiff operates a part of its trolley system, and to have said assessment and the warrant for its collection declared invalid, and canceled.
The original franchise given by the plaintiff’s predecessor in 1884 provided for the construction and operation of a single track street surface railway, operated by horse power, with switches, sidings, turnouts, etc., and contained the following provision:
“5th. Said street railway company shall whenever, and as required, and under the supervision of the common council of the city of Newburgh, keep in permanent repair the portion of every street between its tracks, the rails of its tracks, and a space two feet in width outside and adjoining the outside rails of its tracks, so long as it shall continue to use such tracks so constructed as aforesaid, at its own cost, and expense, and said company shall enter into a good and sufficient agreement with the city of Newburgh so to do.”
The provision with respect to the space tietween the tracks applied where there were sidings, switches, etc. In 1894 a further and supplemental franchise was granted to the Newburgh Electric Railway Company, successor of the original company, and plaintiff’s predecessor, granting to it permission to change its motive power from horse to the overhead trolley system of electrical power, and which franchise contained the following provision:
“The foregoing consent is upon the express condition that the provision of article 4, chapter 565 of the Laws of 1890, and the laws amendatory thereof, and supplemental and pertinent thereto, shall be complied with, and it shall be filed in the office of the clerk of Orange county.” «
Article 4 of chapter 565 of the Laws of 1890, which is the general railroad'»law, contains'the following provision:
• “Section 98. Every such corporation so long as it shall continue to use any of its tracks in any street, avenue, or public place in any city or village, shall have and keep in permanent repair that portion of such street, avenue, or public place between its tracks, the rails of its tracks, and two feet in width outside of its tracks,” etc.
This supplemental franchise also contained a provision that upon Broadway, the trolley railroad should consist of two tracks “with center poles,” together with suitable switches, sidings, etc. Under and
Two questions are presented by the pleadings and the briefs: First, had the city a right to assess the plaintiff for the paving of the entire space of 7 feet and 10 inches between the trolley tracks ? Second, had the city council power to make the assessment payable in one amount, and to issue a warrant to the collector, directing him to collect the entire assessment immediately? These two questions we will consider in the order in which they are here stated.
[1] The plaintiff’s claim is that the usual and ordinary space or width between the tracks of a double-track trolley railroad is 4 feet and 6 inches, and that, having been required by the city authorities to lay its tracks 7 feet and 10 inches apart, it should not be required to pay for paving the whole width between the tracks, but only for such width as is ordinary and usual between the tracks of a double-track trolley system, and contends that the provision of the Railroad Raw above quoted, requiring the pavement to be maintained between “the tracks,” is to be construed as meaning between tracks as they are ordinarily laid down in a double-track trolley system, and that is my interpretation of this provision of the Railroad Raw; and, in the absence of any express agreement or franchise provision to the contrary, I would hold that where the city authorities locate and require the tracks of a street surface railway system to be laid farther apart than is usual and ordinary, and, in the absence of an express agreement or franchise provision to the contrary, that such railroad company would
[2] The decision of this case, however, does not depend upon the railroad law alone, but rather upon the terms and conditions of the plaintiff’s franchise. That expressly provides that a single line of center trolley poles shall be erected and maintained, and it is agreed that with that method of construction, the tracks were necessarily placed where they are, with a space between them of about 7 feet and 10 inches. It was testified by Mr. Odell, the plaintiff’s president, that the cars of the company could not be conveniently and safely operated were the tracks closer together, and the center line of poles provided for by the franchise required that the tracks be placed on either side of the line of poles, in approximately the center of the street, and in the franchise which contained this provision in reference to the use of center poles is the following provision: “The foregoing consent is upon the express condition that the provision of article 4, chapter 565 of the Laws of 1890, and the laws amendatory thereof and supplemental and pertinent thereto, shall be complied with,” and that statute requires that the company permanently maintain the pavement between “its tracks,” so that, in my opinion, the effect of the franchise and its acceptance by the plaintiff, and the construction and operation of the railroad under its terms, constituted an express agreement on the part of the plaintiff to pave the entire width or space of 7 feet and 10 inches between its tracks. If the plaintiff’s liability depended alone upon the provisions of section 98 of article 4 of the Railroad Law, it might well be argued that the plaintiff should only pay for such width of pavement as is usually and ordinarily maintained between the tracks of a double-track trolley system, but the plaintiff’s obligation in this respect seems to me to be fixed by the terms of the franchise granted to and accepted by it, because the tracks are concgdedly where they must be, in order to safely operate a trolley railway from a line of center poles, for which the franchise provided.
So that my conclusion respecting the first question is that, the plaintiff and its predecessors having accepted a franchise providing in effect that the tracks shall be laid in the center of Broadway, with a line of center poles, and having constructed and operated its road in accordance therewith, and it being conceded that the tracks are as- close together as they may properly and safely be for that manner of construction, and the franchise having been granted by the city upon plaintiff’s agreement to keep the pavement between its tracks in permanent repair, and the plaintiff having been notified to do the paving work for which this assessment was made, and having thereupon requested the city to have it done along with the paving of the rest of the street, and the city having had the work done in accordance with that request, at a price that is not questioned, the plaintiff is liable for the cost of all the paving between its tracks, as well as between the rails of its tracks, and two feet outside of the rails.
The fact that some of the space between the tracks is used by the electric light company for the maintenance of a line of poles seems
[3] As to the second question, I think the city council had authority to make and confirm the assessment, but was without legal right to direct the collection of the full amount immediately, inasmuch as the cost of the entire work had been provided for, by an issue of bonds covering a period of 25 years, and the city charter provides that:
“After the same has been assessed upon such street surface railroad or property, shall be repaid to the city in such annual installments, including the proper proportion of interest due or to become due upon the bonds issued as aforesaid in each and every year, as may be fixed by the city council.”
This provision, it seems to me, required the city council to provide for the collection of the assessment in installments, and not by one payment. This act of the common council, however, in directing the collector of taxes to make the collection immediately and in one payment, does not affect the validity of the assessment, nor give ground for the maintenance of this action, for the reason that the error or defect in the warrant is apparent upon its face, and upon the face of the proceedings of the common council, and in such a case, where there has been no sale of the assessed property, an action to cancel the assessment and remove the cloud from the title of the property assessed cannot be maintained.
The making of the assessment, and the issuing of the warrant directing the collection of the assessment, in annual installments, are two separate and distinct acts. The provision of the city charter is:
“The portion of the expense of such improvement to be paid by any street surface railroad, * * * after the same has been assessed upon such street surface railroad or property, shall be repaid by the city in such annual installments, including the proper proportion of interest due upon the bonds issued as aforesaid, in each and every year, as may be fixed by the city council.”
[4] My conclusion upon this branch of the case is that the cost of the improvement, which the railroad company is liable to pay, may be assessed in one amount, and that such assessment would not be invalidated by the fact that the warrant issued to the collector of taxes improperly directed the collection of that assessment forthwith and in one payment, and that the warrant in such a case would be irregular and defective upon its face, and that the proceedings of the common council directing the collection of the assessment in that manner would, upon their face, show the illegality and error, and would not therefore afford ground for such an action as this, which can only be maintained where the defect is dehors the record.
I think that the common council, after assessing the proper cost of the improvement against the railroad company, should have adopted an additional resolution fixing the number of yearly installments to be paid by the plaintiff, and that the warrant to the collector should have been in accordance therewith, but I am convinced that the failure
Judgment for the defendant dismissing the complaint upon the merits, with costs.