■Contracts <§=>322(1)—Allowance for Failure to Perform—Burden of Proof.In the course of this protracted trial we think plaintiff’s counsel fell into error through overconfidence, so that eventually recovery was staked upon the results of the measurement of the inside of the boilers. Upon an official measurement in the presence of court, counsel, and plaintiff in person, the inside diameter of both boilers averaged 2 inches less than the specified 66 inches, with a smaller reduction in the lengths. There was evidence likewise of imperfections in the erection of the smokestack subsequently ordered.
In case of inadvertent omissions, variations, or defective workmanship, not vital to performance, plaintiff has the burden of proving the amount of any allowance to be made therefor. Spence v. Ham, 163 N. Y. 220 , 227, 57 N. E. 412 , 51 L. R. A. 238 . For a more correct determination of the rights of the parties, we think there should be a new trial. It is not too late to amend the complaint in respect to the allegation of due performance of .all the contract conditions.
Cases cited
- Spence v. Ham 163 N. Y. 220 at 227, 57 p. 96