Majority
Headnote
Injury to Servant—Assumption op Risks.The defendant, the Livonia Salt & Mining Company, was engaged in sinking a shaft to the salt deposit in the town of Livonia, in Livingston county, for the purpose of mining salt in the summer and spring of 1891. The shaft was sunk mainly through the solid rock, which was removed by blasting into fragments, and being hoisted and carried away. Then the usual timbers were put in. The dimension of the shaft inside of the timber was 10 by 20 feet, the longest dimension running north and south. On the 9th of July, 1891, on the day the plaintiff was injured, the shaft had been sunk to the depth of 525 feet. In timbering it, the shaft was divided into three divisions, each being 6 by 10 feet, the longest dimension extending east and west. These divisions were planned to extend from the top to the bottom of the shaft, and were separated by timbers put through east and west, about 8 or 10 inches apart. The boards placed on the outside of the shaft against the rock were called “lagging” by the witnesses. The middle apartment or division of the shaft was used for a hoistway, and generally a bucket was used in which the fragments of rock were hoisted, and by means of which lumber and timbers were let down into the mine. Laborers were also lowered and raised in this bucket. The northern division was used for a ladder way and air chamber. At intervals of about 16 feet down this northern division, platforms were built, in the southwest corner of which a space 20 by 24 inches was left open, for the ladder way; the ladder itself being set on the platform, with the bottom about 2 feet out from the west wall, and the top leaning against the west wall. Each succeeding ladder was placed in the same manner on the next platform, so that, in going down, a person, having come to the foot of one ladder, would step right around onto the top rung of the next ladder, which set back of the foot of the ladder above. Four feet of the east end of the northerly division was used as an air shaft, an aperture being left therefor, which was sheathed up after the platform was laid. The sheathing of the air chamber was the very last thing to be done in connection with the completion of the northerly division. The sinking of the shaft being through rock, considerable space had to be left below the permanent timbering for the drilling and blasting. A heavy double platform across the whole shaft was built, about 25 feet above the bottom of the shaft, to protect it from blasts, etc., to the permanent shafting above; and this double platform was removed, and placed lower down, from time to time, as the work progressed. When such lowering of the double platform was made, the platforms for the ladders were built down to within a proper distance up. The construction of the lower part of the timbering of the shaft, including platforms, was always in
Although the plaintiff testified that he did not know the hole into which he fell was there at the time of the accident, we have reached the conclusion, from the whole evidence in the case, that, from plaintiff’s knowledge of the situation, he must have known, or, if he did not
The plaintiff seeks to fix the responsibility upon the defendant by invoking the familiar principle that it is the duty of the master to furnish a safe place for his servants to work, or, at least, to use reasonable care to that end, and in case of a hidden danger, or one of which the servant is not advised, and cannot b’e without experience of the situation, it is the duty of the master to give the servant warning of such danger. Neither of these principles applies to this case. The work in which the plaintiff was engaged was evidently hazardous. The place where he was working was in process of creation or construction. It was incomplete at the time of the accident. The plaintiff had full knowledge of the condition^ surrounding him, and of the dangers attending his employment, and was called upon to exercise the care commensurate with his situation, and accepted by his employment at such a place the risks of the situation. The shaft was deep and dark. The platform that had been constructed was narrow, and a step in the darkness would precipitate the workmen "into the abyss below. To protect the servant, the master had provided him with a lamp and with candles ready at hand, where he could explore the mine, and become aware of any obscure danger. The master does not insure the safety of the servant. His contract with his servants is for a reasonable care of them under all the conditions surrounding the employment. It seems unnecessary to cite cases to sustain this view, but reference may be made to Kennedy v. Railway Co., 145 N. Y. 288 , 39 N. E. 956 ; Donnelly v. Brown, 43 Hun, 470 ; Kaare v. Iron Co., 139 N. Y. 369 , 34 N. E. 901 .
The judgment and order should be reversed, with costs to abide event. All concur.
Cases cited
- Kennedy v. Manhattan Railway Co. 145 N. Y. 288 p. 52
- Kaare v. Troy Steel & Iron Co. 139 N. Y. 369 p. 52