Majority
Headnote
Contracts—Interpretation.There seems to be no dispute but that the quicksand which filled the tube entered through the bottom of the 38-inch tube in the water stratum. There is dispute as to where the quicksand came from,—whether it was in the water stratum before the 38-inch tube was sunk, or whether it went down from above the hard-pan stratum during the time the work was being done or after it was completed; and whether, if it went down from above the hard-pan stratum, it went down through an opening around- and next to the outside of the tube, or through other openings originally existing, or which had been made by defendant while sinking the 42-inch tube, or while making borings to ascertain the condition of things below the bottom of the 42-inch tube. It cannot reasonably be claimed that the duty of the plaintiff to prevent the quicksand from going down from above the hard-pan stratum extended beyond the closing up of any opening around and next to the 38-ineli tube, so as to prevent sand going down there. Considering the manner in which the 38-inch tube was sunk, and the work was done, it is quite doubtful whether any opening was left about the tube through which the quicksand could have found its way into the water stratum below, and whether the presence of the quicksand in the tube should not be accounted for in one of the other ways suggested. But, whether this be true or not,- there seems to have been no way, considering the manner in which the work -was done, in which any opening outside the 38-inch tube, and between it and the hard-pan stratum, could, by the,use of Portland cement or other suitable materials, have been closed up. The only place in which such material could have been applied was between the 38-inch and 42-inch tubes by way of making the joints between the two sized tubes firm and solid, so as to prevent quicksand entering the tubes at that point. The connection with the hard pan was necessarily made by sinking the 38-inch tube through it, and there was no way in which material could be applied outside the 38-inch tube so as to strengthen such connection between the tube and the hard pan next to it. The contract could be construed in view of these considerations. It could not well be said that the parties intended the plaintiff
“* * * On taking out the sand, the joint between the 42 and 38 inch pipe, which was a part of your contract to make, was found to be gone, and this accounted for the presence of the sand in the tube. I want nothing but what is fair, but I want to know that the tube is tight; that the joint is well made, so that the sand won’t come in; and there is no way of ascertaining that fact without making a test of the tube with the air taken off. * * * The very object of the tight joint was to keep out the quicksand just above the hard pan, as you will see by referring to the contract.”
In view of the suggestions here made, and of the reasons stated by the learned referee in his opinion, we regard the construction given by the referee to the clause of the contract in question as the proper one, and we see no reason to doubt the correctness of the decision made in the case. We concur in the conclusion arrived at by the referee that the proofs failed to establish any negligence on the part of the plaintiff in the performance of the work, rendering it useless and of no value.
The judgment appealed from should be affirmed, with costs. All concur.