Majority
Headnote
Expert Evidence—Weight and Sufficiency.The plaintiff entered into a contract with the defendant by which he was to excavate Newbridge pond, on the line of defendant’s water supply, and construct the dam, banks, and slopes of the pond. For this work he was to be paid, not a gross sum, but certain specified prices for each item of work done, according to its quantity. For excavating the bed of the pond, and the disposal of the material excavated, he was to receive 32 cents per cubic yard. The site of the Newbridge pond, before the commencement of the work, was a swamp or swale, through which there ran two streams. The material to be excavated consisted principally of muck on the surface, and sand or gravel beneath. The plan of the work provided, not only for the excavation of the bed of the pond, but for the construction of banks along its margins. For his second cause of action, the plaintiff complained that the defendant interfered with him in the prosecution of his work, and compelled him to excavate the muck and the sand or gravel separately, thus materially increasing the expense of the work. For this interference he claimed to recover damages.
It seems to me that the question presented by this case is an extremely narrow one. The specifications provided that the engineer should decide upon the quality and character of the excavated materials to be used at various places in forming the embankments of the conduit and supply pond; and the remainder was to be disposed of in grading and filling at such places as the engineer might designate, or, to use the technical term, was to be “wasted.” Under these provisions, it is unquestioned that the engineer of the defendant was empowered to direct that no muck should be placed in the embankments surrounding the pond. His direction given for this purpose, that the muck and the sand should be excavated separately, was therefore proper. The appellant does not deny this proposition. If this were all there were of the case, the decision below was correct. But neither the contract proper, nor the specifications, gave any figures of the extent of the improvement to be made, or any dimensions of its details. To obtain these it was necessary to go to the .plan. The plan prepared at the time of the execution of the contract between the parties represents the location and contour of the pond. The whole area is plotted into squares drawn to a scale. Along the margins of the pond are strips colored blue, and included within black lines. The width, though not given in figures, is easily ascertainable
The interlocutory judgment appealed from should be reversed, and a new trial granted; costs to abide the event. All concur.