Majority
Headnote
1. Buildings—Subcontract—Readiness to Perform.This appeal involves the question of the liability of the plaintiffs to respond in damages to the defendant Haven for the destruction of the walls of shop B that were blown down at Depew, Erie county, on the night of September 13, 1892. The court found that “during the night of Tuesday, the 13th day of September, a high wind or gale arose, and blew down that portion of the side walls of erecting shop B, which had been carried up to the height of thirty-four feet, and which had not been covered by said trusses; the portion blown down being of the length of one hundred and eighty feet.” He also found that the place where the shops were erected is a level, open country, about 10 miles east of Buffalo, where the prevailing winds are from the southwest, and where, in the fall of the year, there are frequent storm winds. The evidence does not disclose, nor does it seem to be claimed by the learned counsel for the appellants, that this storm was an exceptional one for that locality for that time of the year, but was only such a one as might have been within the contemplation of the contracting parties as likely to occur. The plaintiffs notice to the defendant Haven to raise the walls to 34 feet, so that the ironwork could be erected upon them, implied an assurance to Haven that, as soon as the walls were ready, the ironwork would be placed upon them. The trusses weighed about two tons apiece. When placed upon the walls, they operated to bind them, and make them firm, and gave them greater capacity to resist the effect of storms. It was not expected that any bracing of the walls to resist outside forces should occur after the trusses were put upon the walls, and, as Haven had reason to expect that the ironwork would be placed immediately after the walls were raised, it was not negligence in him not to have braced them. He had taken the precaution to notify the plaintiffs immediately after the first portion of the walls had been raised to 34 feet that the walls were ready for the ironwork, and that there was great danger of injury from the elements in their present condition, and that the ironwork was absolutely necessary for the protection of the walls. And the trial court had the right to assume that negligence on the part of Haven had in no manner contributed to the destruction of the walls. The implication in the first notice of Bead & Gilman to Haven to raise the walls is strengthened by the second notice, of the evening of September 9th, to continue the raising of the walls to the height of 34 feet, which notice was complied with by Haven immediately. The notice from Haven, and the two notices to Haven, and the exigency of the conditions surrounding the work made the duty imperative upon the plaintiffs to use all the force necessary to erect the ironwork upon the walls as soon as practicable. The plaintiffs concededly had the ironwork on the ground, sufficient for that purpose had it been suitable; and with proper machinery, which it was their duty to have, could have completed the work before the disastrous storm that followed. The "walls
The appellants insist that their failure to place proper ironwork upon the building was not the proximate cause of the damages; that the proximate cause was the storm, and the plaintiffs’ breach but a .remote incident. The storm was undoubtedly a concurring cause. But for the storm, the damages would not have occurred; neither would they have occurred but for the failure of 'the plaintiffs that we have indicated. Two suggestive facts in the case greatly strengthen this view. One is that the portions of the wall that had been raised •34 feet high, that were protected by the seven trusses that had been ■put upon them, did not go down. The remainder of the wall, that ‘.had only been raised 26 feet high, withstood the storm in safety, so that it is almost demonstrated that the cause of the fall of 180 feet cof the unprotected wall that had been raised 34 feet high was because it was not protected by the ironwork. As sustaining this view, see Quill v. Telegraph Co., 92 Hun, 546 , 34 N. Y. Supp. 470 , and 37 N. Y. Supp. 1149 ; Laible v. Railroad Co., 13 App. Div. 574 , 43 N. Y. Supp. 1003 , and cases cited.
There is no question about the measure of damages, providing the plaintiffs’ responsibility is established. Those damages would be the necessary expense of repairing and rebuilding the walls that were blown down. Haven was bound by contract with the railroad company to have these walls constructed, and his damages are the natural and necessary result of the combined causes to which we have referred.
The appellants also complain that they were hindered in the erection of the trusses by reason of the omission of Haven to remove the staging which had been used to erect the walls. There does not seem to have been any complaint at the time about the staging remaining there, and it may be questioned whether it was not useful in erecting the ironwork. The trouble with the plaintiffs, as we have explained, lies deeper than the staging. If their ironwork had been in a condition to have been used, there would have been no substantial difficulty in the way of the performance of their contract.
Upon the trial, evidence was offered upon both sides of the custom or usage, if any existed, of the masons to brace their walls after
The appellants also urge that, where no time is mentioned for the performance of the contract, the law annexes to that contract the condition that the party has a reasonable time within which to perform it. This is a reasonable rule, and applicable to contracts generally; but what is a reasonable time must be governed by the circumstances of each case, and we have shown in this case that the plaintiffs’ duty to erect the ironwork was immediate and absolute.
We find no reversible error in the proceedings below, and the interlocutory judgment should be affirmed, with costs, and that the reference ordered thereby should proceed to ascertain the amount of the damages. All concur.