Majority
Headnote
Contract—Construction—Question for Court.The tests made by the defendants of the city wells were fairly made. Of this no question is presented by the plaintiffs. That the tests of the Cook well were fairly made, as far as they could be made without lowering the pumps, can, upon the evidence, hardly be questioned. The claim of the plaintiffs, however, is that that test could not fairly be made without lowering the pumps so as to exhaust the water in the Cook well. The defendants contend that the only test required by the contract was by a change of the suction from the city wells to the Cook well, and that no change in the position of the pumps was contemplated. Upon the trial the court ruled with the plaintiffs, and allowed the jury to say whether a fair test required by the contract could he made without lowering the defendants’ pumps, and refused to charge that under the contract the defendants were not required to lower the pumps in making the required test. An exception to this refusal, and to the charge of the court upon this subject, presents the only question which this court is called upon to determine.
Plaintiffs further urge that it was not contemplated that these tests should be made with the pumps as they then existed, because the test contemplated a possible flow of 4,500,000 gallons, and both pumps together are only of 3,000,000 gallon capacity. But to lower the pumps would not add to their capacity. It may well be that, if they found water in excess of 3,000,000 gallons, they would be willing to add other pumps. But it appears from the evidence that this 1,000,000-gallon pump, as guarantied, could pump about 1,500,000 gallons. In other words, the guarantied capacity of the pump is not its greatest capacity. The mere fact that these pumps have a guarantied capacity of only 3,000,000 gallons is not sufficient from which to conclude that it could not at least approximately be ascertained thereby whether the well would not yield 4,500,000 gallons.
Assume, on the other hand, that the construction of this contract, in view of the surrounding circumstances, presents a question of fact; we are still agreed that the facts do not justify the conclusion that the contract requires the defendants to lower these pumps in order to make a fair test of this well. The plaintiffs’ construction of the contract can only be based upon two facts: First, that the water in the Cook well cannot be exhausted without lowering the pumps; second, that there was a conversation, about the time the
The decision of this case upon the former appeal is not in conflict with the conclusion here reached. That decision was based purely upon the bona tides of the test made by the defendants. The construction of the contract was not determined. 29 App. Div. 49 , 51 N. Y. Supp. 371 .
Our conclusion is, therefore, that the construction of this contract, whether as a matter of law, or one of mixed law and fact, was for the court; that, under the contract, the defendant was not bound to lower the pumps in order to make the test required; and that the trial court erred in submitting this question to the determination of the jury. The judgment and order should therefore be reversed.
Judgment and order reversed, and a new trial granted, with costs to the appellant to abide the event. All concur, except HARDIN, P. J., dissenting.