Majority
Headnote
Carriers—Injury to Passenger—Negligence—Presumptions.The plaintiff was injured on January 5, 1897, between 6 and 7 o’clock in the afternoon, while a passenger on the defendant’s Lexington avenue line in Manhattan borough, New York. The cars are run by cable power, and a break in the cable caused the car behind the one in which the plaintiff was riding to run away at or about 87th street, whereupon it collided with the one in which the plaintiff was at or near 94th street, and the two continued to 96th street, where a second collision occurred with a car ahead, and the plaintiff received her injuries. The speed of the cable was said to bé 10 miles an hour, but from the time required to make its circuit it is evident that its actual .speed was between 11 and 12 miles an hour. The learned counsel for the appellant argues, with his usual force and acumen, that the presumption of the defendant’s negligence arising from the happening of the accident was completely overcome by the testimony, and that the complaint should accordingly have been dismissed. The evidence did, indeed, establish the fact that the cable was the best in use; that a system of constant inspection was in operation; and that the defect in the cable which caused the accident was not discovered in time to prevent the occurrence; nevertheless it was proper to submit the case to the jury, and a nonsuit would have been error. The cable is 43,000 feet long. It traverses the distance covered by its operation, viz. from 25th street to 125th street, and returns,-every 42 minutes. The system of inspection consists chiefly in stationing men at the power house at 25th street, to watch the cable as it is paid out, in order to discover defects, and a given point is thus under observation once in every 42 minutes. The watchers on the afternoon in question, Mansfield and Nelson, were not called as witnesses. Mansfield was said to be in Mexico, but Nelson was in New York, and the evidence of the defendant’s inability to procure his attendance might very well be regarded by the jury as unsatisfactory. The cable was stranded at the point where it had been spliced. Moore, who had the supervision of the operation of the cables, and whose duty it was to splice and repaid them, testified that he made the splice eight days before the accident. He also testified that a splice would last on the average five or six weeks.. The fact that this particular splice broke so unusually soon after it was made is certainly some evidence that it was defectively done, and although Moore is corroborated by another
“As to the machinery and appliances by which an elevator is moved and controlled in its ascent and descent, an owner is bound to use the utmost care as to any defect which would be liable to occasion great danger or loss of life, and that he is in that respect subject to the same rule that applies to a railroad company in regard to its roadbed, engine, and other similar machinery.”
Under the circumstances, the exclusion of the written reports of the two watchers, Mansfield and Nelson, was not reversible error. These reports were marked for identification, and are printed in the case, and it is evident that nothing contained in them could affect the determination of the question' of the care' with which the splice was made, or that of the credibility of the witnesses in regard to it. The damages are not excessive, and the judgment and order should be affirmed.
Judgment and order affirmed, with costs.- All concur. GOODRICH, P. J., however, is of the opinion that the recovery should be reduced.
Cases cited
- Volkmar v. Manhattan Railway Co. 134 N. Y. 418 p. 178
- O'Flaherty v. Nassau Electric Railroad 34 App. Div. 74 p. 178
- McGrell v. Buffalo Office Building Co. 153 N. Y. 265 p. 178