Majority
Headnote
1. Dedication—Evidence—Sewerage Privileges.The plaintiff is the owner of a strip of land in the village of lying between the street, containing an extensive ledge of valuable lime rock, which the plaintiff has used and is still using in the manufacture of lime. There is a fissure in the rock about a thousand feet from the river bank, running from the surface underground to some point in the bed of the river. This fissure, for a long time, has been used as a sinkhole to carry away surface water and to drain certain dry docks situated in the neighborhood.
As to the institution of the sewer system and the appropriation and use of the fissure as an outlet to such system, I cannot agree with the plaintiff’s contention. I am of the opinion that there was a dedication by the owners of the property to a public use. It appears without dispute that the sewage system was constructed with a view to the use of the fissure as its outlet, and everything points to the conclusion that its occupation for that purpose was intended to be permanent. I think, therefore, that the defendant has a right to occupy and maintain its sewer from Warren street across the premises of the plaintiff to the opening of the fissure, and to use said fissure for the purpose of carrying away such sewage to the extent of its capacity. The fissure is simply a natural' extension of the artificial sewer, and constitutes a part of the system originally planned and constructed.
But I think there was ño dedication of the plaintiff’s.premises to any other or further use. The dedication of the fissure and the right to lay the' sewer pipes to connect therewith did not contemplate any use of the premises beyond the capacity of the fissure as a continuation of the sewer. ‘ The construction of the overflow pipe came about in a different way. Its necessity was not contemplated at the time the owners of the property dedicated the use of the fissure and land for
As to the question of damage, the testimony is very conflicting. The plaintiff contends that its limestone is exceedingly porous, and that sewage matter has been absorbed by it to such an extent as to destroy its usefulness for the purpose of manufacturing lime. I think much of this claim rests upon the sheerest speculation. It is simply beyond belief that limestone can, to any extent, be permanently injured by the flow of sewage over it. Any deposits which may result therefrom may be removed by very simple and inexpensive methods. There can be no doubt that the plaintiff has been discommoded and suffered loss from the presence of sewage flowing over the quarry, and that it will be put to expense in removing the deposits. As to all such loss and expense it should be fully compensated, but I am strongly of the opinion that when such deposits are removed the stone will be as serviceable as ever. I have carefully examined the views of the several witnesses in respect to the injury, and have come to the conclusion that the sum of $1,000 will fully compensate the plaintiff for the loss which it has thus far sustained.
The plaintiff may have judgment for the removal of the overflow pipe, and for damages caused by the loss and injury to its premises in the sum stated, together with an injunction restraining the defendant from further discharging its sewage upon the premises of the plaintiff, other than by the use of the fissure and sewer pipes leading thereto, to which reference has been made.
Let findings of fact and conclusions of law be prepared in accordance with the above, the same to be settled upon notice, when parties will be heard as to the time the injunction order should take effect. Costs to plaintiff. Judgment accordingly.