Majority
Headnote
Master and Servant — Injuries to Servant — Evidence—Sufficiency.The plaintiff was in the employ of defendant as an iron worker on its elevated structure, and on the day of the accident from which he suffered injuries was one of a gang engaged in drilling holes directly under the top girder of the track. A foreman had previously marked the places at which the holes were to be drilled. The plaintiff had been engaged in similar work in the immediate neighborhood for several days, and for about nine months had been engaged in doing similar work on various parts of defendant’s structure, during which time the road had been operated electrically through what is known as the “third rail system.” At the point at which plaintiff was working at the time of the accident certain wires, four or six in number, pass under the structure, attached thereto rather loosely, so that they are movable, and serve to carry the electrical current to the third rail. In drilling the holes the plaintiff and his co-workers used a series of contrivances or tools known as a “knee,” a “ratchet,” and a “clamp.” The knee, consisting of a piece of double-angled iron, weighing about 29 pounds, is attached to the ironwork in which the hole is to be drilled by the clamp, weighing about 25 pounds, and between the iron and the knee is inserted the ratchet, weighing about 14 pounds, into which the drill is fixed. The gang was engaged in setting up the ratchet upon an upright girder, preparatory to drilling a hole therin; plaintiff holding up the knee, which was being clamped to the structure. Plaintiff and his "companions observed the feed wires in close proximity to their tools, but paid no particular attention to them, and took no precaution against touching them with their tools while engaged in clamping the knee and the ratchet. Before this work was completed, there was an explosion and blinding flash, whereby plaintiff was seriously burned and injured. There can be no doubt that this explosion was caused by contact between one of the iron tools and one of the feed wires, resulting from some break or defect in the insulation of the wire. No direct evidence of .insufficient, imperfect, or defective insulation was offered; the plaintiff contenting himself with showing that the explosion could not have occurred unless there had been some break or defect in the insulation at the point of contact and at the moment o.f contact, and arguing therefrom that this proof, with proof of the explosion, warranted the jury in finding that the' defendant had been negligent either in failing to provide properly insulated wire in the first instance, or in failing to keep it properly insulated after it had been installed. This seems to us to be an attempt unwarrantably. to extend the doctrine of res ipsa loquitur, for it implies the drawing of an inference from the mere happening of the accident, that the defect in the insulation, which concededly must have existed at the moment of the explosion, had existed previously for a sufficient time to impute notice to the defendant. The circumstances as disclosed by the evidence warrant no such inference. It was clearly shown that the insulation was originally quite sufficient for the use to which the wire was to
Judgment reversed, and new trial granted, with costs to appellant to abide the event.
All concur.