Addison H. Delamater and Edward W. Everson, App’lts, v. David Folz, Frank Folz and Alfred B. Ashman, Resp’ts.
(Supreme Court, General Term, Fifth Department,
Filed January 11, 1889.)

Headnote

1. Contract—Buffalo (city of)—United States lands—Provisions of contract—Trespass on lands—Action for damages by contractor AGAINST ADJOINING CONTRACTOR—QUALIFIED POSSESSION—RIGHT TO PROTECTION.
The plaintiffs had constructed a sewer for the city of Buffalo, through lands vested in the United States, from the constituted authorities of which the city had obtained permission to make the excavations and put in the sewer. By the contract of the plaintiffs with the city, the plaintiffs were permitted to and did appropriate to their use, the land where they d.d their work, and built the sewer. The contract with the city provided, 1. That any work not specified in the contract which may be fairly implied or included in the contract, “ of which the engineer shall judge,” shall be done by the contractor without extra charge. 2. That the engineer shall decide as to disputes between the contractors on adjoining sections as to the manner of connecting the work, or otherwise. 3. That all work shall be done to the satisfac ion of the engineer, and any unfaithful or imperfect work shall be corrected. After the plaintiffs had constructed their section of the sewer, but before the engineer had inspected it, the defendants, who were contractors for an adjoining section, in proceeding with the work on their section, made excavations and deposited the stone taken from their work, upon a portion of the plaintiffs’ section in which the latter had constructed the sewer. Afterwards, the engineer inspected plaintiffs work there, found it unsatisfactory, and required them to uncover the sewer and perfect their work To do this, it was necessary to remove a portion of the stone which had been deposited upon it by the defendants, which the plaintiffs did on the refusal of the defendants to do so, and the expense of doing it constitutes a portion of plaintiff’s alleged claim for damages. Held. 1. That the contract gave plaintiffs a quaified possession of the land for the time being, of which they had the right of protection; and the fact that the title was in the United States, does not aid the defendants, as they derived no right from the sewer, but were mere strangers to that title.
3, Same—Damages.
Held (2), nor is it necessary to inquire whether the defendants are liable to the United States for the damages resulting to the land by putting the stone on it. The plaintiffs’ claim is confined to the damages resulting to them in the use of the premises so far as necessary for the performance of the work which they were required and had the right, as against the defendants, to perform
3. Same—Qualified possession—Continuance of—Acceptance by engineer—Right of action.
Held (8), that although the plaintiffs, several months before the stone was placed there, had treated their work as completed and left it as such, yet as their duty was imposed by and their rights were derived from the contract, as they understood that the obligation under the contract was only contingently discharged and- was dependent" upon the result of the inspection of the engineer, subject to which they had left the work, their qualified possession of the land continued until their work was completed and accepted by the engineer. And the defendants by depositing the stone _ where they did, interrupted the performance by the plaintiffs of their incompleted work and to the extent of the cost of the removal of the stone injured the plaintiffs, for which they have a right of action.
4. Same—Estoppel in pais—-What will not operate as.
Held (4), chat although the act of the plaintiffs in leaving their work as
p. 822
completed might have induced the defendants to put the stone there, believing that it could not interfere with any right of the plaintiffs, yet this conduct will not operate as an estoppel in pais upon the plaintiffs m bar of this action, as the defendants placed the stone there without the knowledge of the plaintiffs who could not be prejudiced by the fact that it was done with the knowledge of the sewer commissioners and engineer. There is nothing in the case tending to render the plaintiffs chargeable with intent to influence the defendants to place the stone there or with reasonable, apprehension that they would be induced to do so by any act of the plaintiffs. .
5. Same—Trespass taon land—Continuance ow qualified possession
Held (5), that while the maintenance of an action of trespass upon land strictly as such is dependent upon possession," actual or constructive, the facts as alleged in the complaint do not necessarily characterize this as. such an action; and besides the qualified possession of the plaintiffs continued until the work was fully performed, and this possession did not depend upon a continued corporeal relation to the premises, and plaintiffs did not lose the possession which they had acquired by mere separation from it, but their possession was continued until the work was completed as against those who had no right to it.
6. Same—Jurisdiction of county court—Lands of the United States— No question of title involved.
Held (6), that the county court had jurisdiction to entertain the action» although state courts may have no jurisdiction over lands of the United States within the state; the place in question is within the state, and in the county of Erie; the action involves no question of title or injury to» the freehold; the plaintiffs sought to assert no interest in the land other than the right unmolested by the defendants, who were strangers to the title, to proceed upon it in the performance of their contract, and their possession was such only as was essential to that purpose.
Appeal from judgment entered upon report of réferee dismissing the complaint.
Edmund J. Plumley, for app’lts; Tracy O. Becker, for respt’s.

The action was brought to recover damages, alleged to have been sustained by the plaintiffs, by the wrongful acts of the defendants, in depositing a quantity of broken stone upon the ground over a portion of the sewer constructed by the plaintiffs pursuant to a contract made by them with the city of Buffalo. The plaintiff Delamater entered into contract with the city to construct a-public sewer, and the plaintiff Everson joined and was interested with him in the performance of the work. The defendants also had a contract with the city for the construction of another section of the sewer, and the two-sections joined, and when completed would constitute a continuous line of sewerage.

We are advised that the terms essentially■ requiring consideration of the two contracts were the same, and that each of them contained the provisions:

First. That any work not specified in the contract which may be fairly implied or included in the contract, ‘"of which the engineer shall judge,” shall be done by the con

p. 823
tractor without extra charge. Second. That the engineer shall decide as to disputes between the contractors on adjoining sections as to the manner of connecting the work or otherwise. Third. That all work shall be done to the satisfaction of the engineer, and any unfaithful or imperfect work shall be corrected. After the plaintiffs had constructed their section of the sewer, but before the engineer had inspected the work, the defendants in proceeding with the work upon their section, made excavation through rock by blasting, and deposited the broken stone taken from their work upon a portion of the plaintiffs’ section in which the latter had constructed the sewer. Afterwards the engineer inspected the plaintiffs’ work there, found it unsatisfactory and required them to uncover the sewer and perfect the work of construction as directed by the engineer. To do this it was necessary to remove a portion of the broken stone, which had been deposited upon it by the defendants. This the latter refused to do The plaintiffs did it. The expense of doing it constitutes a portion of ■the alleged claim for damages. And in view of the findings ■of the referee in that respect which were supported by the ■evidence, no other injury to the plaintiffs was occasioned by the deposit of the stone there.

The title to the land through which this portion of the sewer was constructed by the plaintiffs, was vested in the United States, from the constituted authorities of which the board of commissioners of sewers of the city of Buffalo ■obtained permission to there make the excavation for and put in the sewer. And by the contract made by the city with Delamater, the plaintiffs were permitted to, and for the purposes of the work they undertook to perform, they did appropriate to their use the land where and upon which they necessarily did such work. This was a qualified possession by them for the time being of which they had the right of protection against strangers to the title. Dyson v. Collick, 5 B. & Ald. 600.

The deposit of the stone over this work of the plaintiffs, resulted in an injury to them, to the extent of the expense requisite to the removal of the stone, rendered necessary for the work of perfecting their job upon the sewer. The question arises whether any right of the plaintiffs was invaded by this act of the defendants or in consequence of such act. The work of construction of the sewer within the meaning and purpose of the contract was not completed until it was inspected and accepted by the engineer. Until then the plaintiffs were subject to liability to overhaul the work they may have done, and to remedy any defects in it, and for that purpose they were entitled to the opportunity of doing it. It is, however, said that as the plaintiffs, several

p. 824
months before the stone were placed there, had treated their work as completed and left it as such; they then had neither the possession of the premises or any existing right there. Th.eir duty was .imposed by and their rights were derived from the contract, and they were concurrent in the sense that such duty and the right to perform it, were essentially united, and when the former existed the plaintiffs were not denied the latter. When they first treated their work as done, the plaintiffs understood that their obligation under the contract was only contingently discharged, and that whether the performance of their work was complete, was dependant upon the result of the inspection by the engineer, subject to which they must be deemed to have left the work. This it may be assumed the defendants also knew. By depositing the stone where they did, the defendants interrupted the performance by the plaintiffs of their uncompleted work, which the latter was required and had the right to perform. The consequence was an invasion of their rights. The good faith on the part of the defendants was no protection to them, unless they were relieved from liability by estoppel. The fact that the plaintiffs left the work as completed, may have induced the defendants to believe the stone could interfere with no right of the plaintiffs. But there was no estoppel to aid the defendants. The stone were placed there without any knowledge or consent of the plaintiffs, and they could not be prejudiced by the fact that it was done with the knowledge of the sewer commissioners and engineers. And in view of the fact" that the time when the inspection of the work by the engineer and the determination whether or not it was satisfactory to him should be made, was not within the control of the plaintiffs, their leaving the work ready for inspection did not have the effect to conclude them from asserting as against the defendants that in consequence of the result of the inspection, to which the work was subject, the performance of their contract was not completed. Nothing appears in the case tending to render the plaintiffs chargeable with intent to influence the defendants to put the broken stone where they were deposited, or with reasonable apprehension that they would be induced to do so by any act on the part of the plaintiffs. This is essential to estoppel in pais although no intent to mislead is necessary to create it. Cont. Nat. Bank v. N. B., etc., 50 N. Y., 575 ; Muller v. Pondir, 55 id., 325; Payne v. Burnham, 62 id., 69; Blair v. Wait, 69 id., 113; Real Estate Trust Co v. Balch, 13 J. & S., 528, 537, New York Rubber Co. v. Rothery, 107 N. Y., 310 ; 12 N. Y. State Rep., 53.

It is contended that the actual possession of the locus in quo by the plaintiffs, at the time the defendants put the stone there, was requisite to the support of the action, and' that they then did not have such possession. It is true that the maintenance of an- action of trespass upon land

p. 825
strictly as such is dependent upon possession actual or constructive by the plaintiff. The facts, as alleged in the complaint, do not necessarily characterize this as such an action, but it may, if essential to its support, be treated as an action on the case, as that term was understood in the former classification of actions. As before suggested, the qualified possession of the plaintiffs continued until their work was completed. The continuance of possession does not necessarily depend upon a continued corporeal relation to the premises. Hence a person does not lose the possession which he has once acquired by mere separation from it. When the plaintiffs took the possession for the purpose of doing the work it was contemplated that they would retain it until that purpose was accomplished and no longer, mid until then as against those having no right to it, the possession, thus qualified, in them may be deemed to have been maintained by a continued purpose to retain it This controversy is wholly between the parties to the action. The fact, therefore, that the title was in the United States does not aid the defendants, as they, derived no right from the owner, but were mere strangers to the title. Wheeler v. Lawson, 103 N. Y., 40 ; 2 N. Y. State Rep., 791; Miller v. Decker, 40 Barb., 228 .

Nor is it necessary to inquire whether the defendants are liable to the U nited States for the damages resulting to the land by putting the stone upon it. The claim of the plaintiffs is confined to the damages resulting to them in the use of the premises, so far as necessary, for the performance of the work, which they were required and had the right as •against the defendants to perform there. That was the extent of their right and their relief must be limited accordingly. And, we think, that there was no want of jurisdiction in the county court to entertain the action for the purpose of the relief sought, although the courts of the state may have no jurisdiction over the lands of the United States within the state. Dibble v. Clapp, 31 How., 420 . Actions for injuries to lands are local and jurisdiction of them is confined to the states in which the land is situated. Am. U. Tel. Co. v. Middleton, 80 N. Y., 408 ; Cragin v. Lovell, 88 id., 258; Dodge v. Colby, 108 id., 445; 13 N. Y. State Rep., 848.

That proposition is not applicable to the present case. The place in question is within the boundaries of the state and of the county of Erie. The action involves no question of title to the land or injury to the freehold. It is founded upon the alleged invasion by the defendants of a right of the plaintiffs, in consequence of which the latter, in the exercise of such right, were damnified. The plaintiffs

p. 826
sought to assert no interest in the land other than the right,, unmolested by the defendants, who were strangers to the-title, to proceed upon it in the performance of their contract, and their possession was such only as was essential' to that purpose.

The provision of the contract, that the engineer shall decide as to disputes between the contractors of adjoining-sections, as to the manner of connecting the work or otherwise, is not in the way of the maintenance of the action. The contract is not set out in the case, and it may be assumed that the claim referred to embraces all that has-any beáring upon its construction and effect.

The controversy in question does not seem to be within-its purpose. It evidently was designed to apply only to-disputes relating in some manner to the performance of the-contracts of the parties. The contracts were made with, them severally by the city. These several contractors did not join in the contracts. But without reference to this-view of the effect of that portion of that contract, it is clear that such decision of the engineer cannot be deemed a condition precedent to the right of action. The rule on that subject, and the reason of it,, needs no amplification here,, since it has been distinctly announced in Delaware and Hudson Canal Co. v. Pennsylvania Coal Co. ( 50 N. Y., 250 ) and in Seward v. City of Rochester (109 id., 164, 169; 15 N. Y. State Rep., 193), and is not inconsistent with the doctrine of Hurst v. Litchfield ( 39 N. Y., 377 ).

The finding of the referee to the effect that the engineer disclaimed having anything to do with the subject of the controversy between these parties, and therefore did not assume to make a decision in the matter, was supported by the evidence.

No other question seems to require consideration.

The judgment should be reversed and a new trial granted; costs to abide the event.