Majority
Headnote
1. Estoppel — Laches.The plaintiff claims to be the owner of a lot on the south side of Bridge street in East Oswego, upon which is a building called the Hungerford Block. Under this building and across the lot the canal of defendant passes. One of the supports ■of plaintiff’s building is a wall along the centre of the canal. This wall is becoming dilapidated so as to render the building insecure, and this action is brought to compel the defendant to turn the water out of its canal a sufficient length of time to enable the plaintiff to repair the wall, and to recover damages through loss of rent occasioned, as it claimed, by the refusal of the defendant on the 21st December, 1888, to accede to the demand of plaintiff that the water be turned off.
The defendant is a corporation, created by chap. 241 of the Laws of 1823, passed April 23, 1823. By § 5 of that act it was provided that the directors of the company “shall have power to explore and designate the route of a canal or mill feeder, and a proportion of the waters of the Oswego river may be taken and conducted out of said river, at or above the Oswego rapid, so called, at such point or place, and in such manner, as may be deemed proper, so that the water can thereby be carried down upon the east side and bank of said river, to such point or place .as may be required by those interested therein,” the route designated and the manner of making the canal to be determined upon by an engineer who shall be appointed by and be under the direction
By § 10, it was provided that, if any time thereafter it became necessary to adopt the said canal as a part of the contemplated improvement between Lake Ontario and Erie canal,-“the .canal commissioners shall at all times have full power, in behalf of the state, to enter upon and make all necessary alterations that by them shall be deemed advisable, to take and make use of the watei’S therefrom, for the use and purposes of filling and supplying all locks that may be constructed to connect the said canal with Lake Ontario; and the said canal shall thereafter become the property of this state, without any payment or compensation whatever to said company; provided however, that the right to all the surplus waters of said canal shall be vested in the company hereby incorporated, and all persons legally claiming-under them; and that they shall be permitted to take, make use of and enjoy the surplus waters of said canal, not necessary for filling or supplying the locks that may be erected by the said canal commissioners.”
The defendant, under this act, commenced in 1824 the construction of its canal along the easterly bank of Oswego river, but before its completion across the plaintiff’s lot and in the same year the state adopted and took possession of it as a part of the canal system of the state, and thereupon it became the property of the state, except the rights to surplus water as reserved in the act. The state made some alterations and continued to use it as a canal for the passage of boats from its completion in or about the year 1825 until the completion by the state of a new and enlarged canal in or about the year 1853, when its use as a canal was discontinued. In the mean time the defendant had made use of the surplus water, giving leases to various parties, and resumed the full control of the canal when it was abandoned by the state.
On the 25th February, 1823, the surveyor-general of the state gave a certificate of sale to Theophilus S. Morgan of lot 19 in the village of East Oswego, block 99. The lot of plaintiff is part of lot 19. On the 22d December, 1828, letters patent were issued to Morgan of lot 19 which were recorded March 26,1834. Lucius B. Crocker became the owner prior to May 1, 1849, and he at that date conveyed to Jesse Bennett and Bennett on the 4th December, 1852, conveyed to Hiram Allen. Each of their deeds contained the clausesubject to the rights of the Oswego Canal Company and the rights of the state.”
In 1871 William W. Pulver, through whom plaintiff derives his title, made an agreement with the defendant in regard to the matters here in controversy. This agreement was under seal, and was duly acknowledged, and recorded, and both parties now claim advantages under it. Prior to the execution of this agreement, Pulver had become the owner of the title of Allen. On the 28th February, 1871, the canal board, by resolution passed pursuant to chapter 267 of the laws of 1857, determined and declared the canal lands in question abandoned, and afterwards, in the same year and. before the agreement above referred to, all the the interest of the state in plaintiff’s lot was quit-claimed to Pulver’s grantor, so far as it could be done consistent with the act of 1857, which provided that when any of such abandoned canal lands were then used for a hydraulic canal the conveyance should not prevent the future use of the land for the same purpose, but should expressly reserve the right to continue such hydraulic canal
This agreement bears date July 31, 1871, and after describing the defendant as party of the first part and Pulver as party of the second part, próceeded as follows:
“ Whereas (the party of the first part have and own a hydraulic •canal on the easterly side of the Oswego canal which crosses lot number nineteen in block ninety-nine in the fourth ward of said city, and whereas the party of the second part is the owner of a building known as Hungerford Block, which is erected over the said canal where it crosses said lot, which building is supported by stone walls on the easterly and westerly sides of said canal and by stone piers or central walls and iron columns placed in said canal, and whereas the parties hereto desire that their respective rights be clearly and specifically defined to the end that all contention and controversy may be avoided.
Therefore it is hereby mutually agreed by and between the parties hereto, their successors, heirs and assigns, that the said party of the second part is, or claims to be, the owner of the fee simple of that portion of said lot crossed by said building, and that the party of the first part has a right of easement across said lot for the purposes and uses specified in its charter, and to have and maintain its canal free from obstruction, and has the right to
enter into and upon the same for the purpose of improving or repairing said canal so as to render it most available for hydraulic-purposes during its legal existence, and that the party of the second part has the right to keep and maintain the building aforesaid over the said canal and to erect another building in its stead in case of the destruction or removal oE the one now standing, and the said company consents, so far as its own rights are concerned, that the said iron columns and any others that may be substituted to replace the piers and central walls aforesaid may remain as supports to said building so long as it stands and that the said piers and central walls may remain until they are replaced by iron columns, not to exceed one year from the second day of October, one thousand eight hundred and seventy-one, and that-whenever another building is erected in its place and stead it shall be supported by a stone wall on the easterly and westerly sides-of'said canal and the present iron columns, and the iron- columns replacing the central stone wall in said canal shall be removed and the building shall be supported by iron or other trusses extending from the said walls over the canal so as to sustain and support-said building, and that the said iron trusses shall be so erected, placed and’ situated as to cause no material obstruction to the now or passage of water through said canal. And the party of the second part for himself, his heirs and assigns, covenants and agrees that they will remove all rubbish, debris and obstructions from said canal caused by the falling or burning of said building over said canal or by any materials falling or thrown from said building, without any unnecessary delay; to pay to said party of the first part the expenses of such removal if done by said company, and that they will suffer no unnecessary obstructions to be occasioned by said building except said columns, central walls- and piers to remain in said canal as aforesaid.”
After the execution of the agreement the matter, as between the parties, seems to have rested until 1888. The plaintiff became owner August 31, 1878, and its title from Pulver, through intermediate deeds, is in terms made subject to the rights of the Oswego Canal Company.
On the 21st December, 1888, the plaintiff served on the defendant a written notice, stating that the building was in a dangerous condition “ owing to the weakening and partial removal of the supports of said building, due to the action of the water of your canal,” and that it desired “to make the necessary repairs to the supports of said buildings,” and requesting that the water be emptied from the canal so that such repairs might be made, notifying the company that if it was not done the plaintiff would hold it responsible for all damages caused to the plaintiff, either by reason of its inability to rent the, premises on account of the unsafe condition, or by reason of the falling of the building. To this request the defendant did not yield, but in its reply on December 21, 1888, claimed that the plaintiff’s building was wrongfully located over the defendant’s canal, and that in case it fell into the canal the plaintiff would be responsible for all damages. ' Thereupon this action was commenced on July 23, 1889.
The first question to be determined arises over the claim of defendant that its lessees of water are necessary parties to the action. They are affected by the stoppage of the water, and, therefore, it is urged they should be heard before the right of plaintiff to have the water turned off is determined. There are a large number of leases, and they give the right and privilege of taking and drawing from the canal a certain defined quantity of water for a long term of years at a fixed yearly rent, the water to be drawn in flumes or spouts placed and constructed by the lessees in the manner directed by the company. It is also provided that the company “ shall have the right at all times, and from time to time, to stop the water above demised, or draw off the water from said canal for a sufficient length of time to make any necessary repairs or alterations in the canal.”
We are of the opinion that the lessees were not necessary parties. The defendant in a certain sense represents them, and it has the title and control of the canal as a whole, and any controversy as to such control is properly with .the defendant alone.
Is the plaintiff entitled to have the water turned out of the canal to enable it to make the repairs it claims the right to make?
In order to determine this question the agreement of 1871 is to be carefully considered. Pulver then was the owner of the fee, but subject to the rights of the defendant. The claim had apparently been made by the defendant or its lessees that the building or its supports was improperly obstructing the flow of the water.. In view of this the agreement was made. It provided among other things that the canal company had the right “ to have and maintain its canal free from obstruction.” It also provided that Pulver had the right to keep and maintain his building over the canal, and to erect another in its stead in case of the destruction or removal of the one then standing, and that the iron columns, which were then there upon either side of the central piers or walls, and any others that might be substituted to replace such central piers and walls, might remain as long as that building then there should stand, and that such piers and central walls might remain until replaced by iron columns, not to exceed one year
The central walls and piers were not removed within the year. They have been allowed to remain, in violation of the agreement, until by the action of the water they have become insecure. This was a result that might have been reasonably expected. It also appears that in the summer of 1888 the state of Hew York repaired and reconstructed the bulkhead gates leading the water into defendant’s canal, and in order to do so cut the water off entirely from defendant’s canal, so that'it was empty and dry for some four weeks in the summer, during which the plaintiff might have repaired the foundations of its block. Ho steps, however, were taken in that direction.
Does the delay of the plaintiff and its predecessors, from 1871, or the failure of plaintiff to embrace the opportunity furnished in the summer of 1888, affect the right of plaintiff, if ever it had the right, to demand of defendant the removal of the water from the canal for a sufficient length of time to • enable the plaintiff to 'make the proper change in the central supports.
In the agreement, nothing is said about the manner in which the work shall be done. There is no agreement by the defendant to turn off the-water. It is a matter to be determined upon equitable principles. The plaintiff has not (a legal right to .have it done. If there was no other way to accomplish the result, it would be inferred that this was in contemplation when the result was required. The delay might induce the court to impose conditions, and in a proper case might require the payment of damages to parties that might be injured by the temporary loss of water. In the present case there is evidence showing it to be possible, by means of coffer-dams, to perform the necessary repairs. Still the referee has found that the removal of the water from the canal
We are not disposed to interfere with this finding. It is quite clear that better work can be done in this way, and that is the better for all parties. ISTor should the delay or the failure of plaintiff to do the work when the canal was empty in the summer of 1888 preclude the plaintiff from having the benefit of this assistance on the part of defendant. The delay was, to a certain extent, acquiesced in by defendant
We therefore conclude that, as matter of equitable relief, the plaintiff was entitled to have the water temporarily removed for the purposes authorized in the agreement of 1871. Does it- follow that plaintiff is also entitled to recover the damages awarded for the loss of rents?
Concededly the plaintiff is bound by the Pulver agreement. If Pulver had performed that agreement and removed the central wall and piers-within the time specified and substituted iron columns, there would have been no loss of rents for the cause here complained of. Had the plaintiff examined the wall in the summer of 1888, and ascertained its condition, as it perhaps should be presumed to have done, and repaired it while the water was out, as the referee finds it might have done,there would have been no loss of rents. The plaintiff now seeks to charge the defendant with this loss, because it did not accede to its demand in December following, while in fact if it had performed its own duty there would have been no occasion for the demand. H plaintiff’s loss is attributable to its own neglect, it should not recover it of defendant.
In its notice, the plaintiff did not refer to the Pulver agreement or offer to perform its obligations. It claimed the right generally to repair the supports of its building, thereby inferentially claiming the right to continue its central walls, and the same claim is made in the complaint and appears in the judgment. If in its notice it claimed more than it had a right to, the defendant was not bound to accede to it.
On the part of the defendant, it may be said with some considerable force that the plaintiff, by reason of its delay and neglect, should compensate the defendant for any loss that may be sustained by turning off the water.
Having in view the situation of both parties, the more equitable course is to allow damages to neither party.
It follows that the judgment herein should be modified, by providing that the plaintiff is not entitled to maintain the present central wall or piers, but is bound to substitute therefor a row of iron columns, and that in case another building is erected, it shall be supported in the manner specified in the Pulver agreement.
The judgment should also be modified by striking therefrom the award of damages. As modified, the judgment should be affirmed, without costs.
Hardin, P. J., and Martin, J., concur.
■ Judgment modified as stated in the opinion, and as modified affirmed, without costs to either party; judgment to be settled upon five days’ notice before Merwin, J.