of another, to the height of fiom 25 to 30 feet. To cut them down, the rivet heads, on the inside of the tank, are cut off, or so reduced in size as to admit of the rivets being driven through, outward. This is done from the top of the tank downward, and necessitates the construction of a scaffold around the entire inner circumference of the tank, which may be lowered by stages as one after another ring is removed. The scaffold is composed of bents, of two posts or standards each, one against the inner face of the tank, the other four or five feet towards the centre, with crosspieces nailed on at the proper height to support the planks on which the workmen stand at the successive stages of the work. As each one of these bents is set up, it is connected to the last one by stay laths of inch boards, nailed on obliquely to the inside posts, which serve to hold the bent upright. When one row or ring of the iron sheets has been unriveted and removed, the workmen lower their platform of planks to the next tier of crosspieces below, and knock off the crosspieces from which the planks have just been lowered, which otherwise would be in the way of their passing from one part of the scaffold to another; and it is their habit, at the same time, as they lower their platform, to knock off the stay laths or “ braces,” as they are called by some of the witnesses. At the time of the accident to the plaintff, one ring or row of sheets had been removed, the platform had been lowered one stage, and the crosspieces knocked off; but the plaintiff testifies that the corresponding brace or stay lath, just at the point where he was at work, was left on, by order of the foreman, <l because the platform was weak.” In what respect it was weak is not mentioned, nor is the fact at all material—except, collaterally, to account for the presence of the stay lath a little later—because the fall of the plaintiff, as will appear, was not due to any weakness of the scaffold. Having lowered the platform, the men went down to grind their tools before resuming the work. This done, the plaintiff went up again, by the ladder, leaving his tools to be thrown up to him. Then, standing on the platform, and leaning over to catch the tools, he put one hand on the stay lath above him. It gave way, and he fell to the ground, receiving the injury, the responsibility for which he seeks to charge upon the defendant. 1
It seems to us that the action was not properly maintainable, on the case as made by the record before us. The plaintiff seeks to maintain it on the ground that the defendant failed of its duty, as master, to provide a reasonably safe place for the plaintiff to do his work in. We do not think there was evidence upon which the jury was warranted in finding that there was any neglect of duty on the part of the defendant in this respect. There is no complaint—certainly no evidence—that the scaffold was not strong enough, in every way, for the work which the plaintiff and his fellow workmen had to do. The stay laths added nothing to the strength of the scaffold. They were not put there for men to hang upon, or to lean against. Their sole purpose was to keep the post upright, and there is nothing to show that they failed to accomplish that purpose completely. Besides, there is not