Majority
Headnote
Violation of the requirements of a statute — is not conclusive evidence of negligence — the question should, be submitted to the jury.This action was brought to recover damages on account of personal injuries alleged to bave been caused by the negligence of the defendant. The proof showed that the defendant is a foreign railroad corporation, operating a railroad which passes through the town of Cromwell, in the State of Connecticut, and 'crosses a public highway of said town on a level therewith. That
“ Every person controlling the motions of any engine upon any railroad, shall commence sounding the bell or steam whistle attached to such engine, when such engine shall be approaching and within eighty rods of the place where said railroad crosses any highway at grade; should keep such bell or whistle occasionally sounding, until such engine has crossed such highway; and the railroad company in
“ If you believe the hell was not sounded and that the whistle was not blown ; if you believe, on the evidence before you, that the ■occupants of that wagon did not see the train in time to stop the horse before it became frightened,und that it became frightened in consequence of the negligence of the defendant, then I charge you the plaintiff is entitled to recover, because it has been settled if a traveler upon a highway, crossing a railroad, is himself free from fault, and does not hear an approaching train, the railroad corporation is guilty of negligence in not giving the proper signals, and that it cannot escape responsibility because the horse of the traveler, frightened by the sudden approach of the engine, suddenly starts forward, and getting beyond control, draws the wagon on to the track and so exposes the traveler to injury. It is not a legal inference that the traveler heard the approach of the train because the horse did.”
This instruction was duly excepted to so far as it instructed the jury that if they should find that the signals were not given on the train, or the ringing of the bell and blowing of the whistle, that they must find for the plaintiff. The complaint makes no mention of this statute, and only claims a right of recovery because of the negligence of the defendant, and hence the failure to comply with the directions of the statute did not necessarily give a right of recovery.
It was competent to prove the statute, because it was some evi-. deuce bearing upon the question of negligence (Archer v. N. Y., N. H. and H. R. R. Co., 106 N. Y., 589 ), but it was by no means conclusive evidence.
This instruction to the jury was, therefore, error, as the failure to comply with uhe statute was made by the charge conclusive evidence of negligence. The jury had a right to consider the statute in determining the question whether or not the defendant had
Concurrence
There are many other points raised by the appellant which it is not necessary to advert to; as for the error already pointed out there must be a new trial.
The judgment must be reversed and a new trial ordered, with costs to the appellant to abide event.
I concur. "When the defendant excepted to that part of the charge discussed by the presiding justice, the learned judge observed that what he had said to the jury was that they might fl/nd for the plaintiff. Unfortunately, his language was much broader, namely, that the plaintiff was entitled to recover, and that observation was not withdrawn. The surrounding circumstances were not left to the jury, in connection with the defendant’s failure to sound the bell and blow the whistle, as matters of fact.
And the jury must have understood that the defendant’s failure to comply with the Connecticut statute in these two particulars was negligence as matter of law.
Bartlett, J., concurred.
Judgment reversed and new trial ordered, with costs to appellant to abide event.