Majority
Headnote
Diversion of the waters of a natural stream — a question for the jury.Under the extremely restricted rule applied to this case, the verdict of the jury 'is supported by the evidence. The stream is a large stream sixty or seventy feet wide. The defendants have a dam some 200 feet wide just above the point where the defendants take the water-for their factory, and the dam for its extreme width overflows each day in the dryest of time for its entire length. The stream below the dam at its lowest period is ten or twelve feet wide, and when the defendants are running their factory and at the lowest of water, no perceptible' diminution is seen in the stream running in its natural bed. The defendants’ wheel is but a thirty-inch wheel. Proof which would have legitimately tended to show that the fluctuation in the stream reducing it from a sixty-foot width to a ten or twelve-foot width, was caused by the ponding of the water of the stream in the great body called Whaley pond and in and by the numerous large ponds between that great reservoir and the defendants’ dam, was excluded. With this proof in, the stream would have been a very large stream in the lowest of water.
The judgment should be affirmed with costs.
If we correctly understand the decisions of the Court of Appeals ( 107 N. Y. 310 ; 132 id. 293) the tiu-ning point of this case is this: Have defendants, by their raceway, materially and perceptibly diminished the natural flow of the waters of Matteawan creek from their
DveMAN, J., not sitting.
Judgment and order denying new trial affirmed, with costs.
Cases cited
- New York Rubber Co. v. Rothery 107 N. Y. 310 p. 60