Majority
Headnote
Negligence, — when a question for the jury.This action was brought to recover damages for a personal injury, caused, is is alleged, by the negligence of the defendant’s employees. At the time of the accident the defendant was, and for some years prior thereto had been, in the possession and control of a wharf at the city of Hoboken, known as pier No. 11, which was used for transferring railroad cars to and from floats. The New York, New Haven and Hartford Railroad Company owned and used floats for transporting cars between its railroad and other railroads having terminal facilities on New York harbor. These floats are about 225 feet long and thirty-flve feet wide, and have three tracks extending lengthwise of their decks for cars to move and stand on. Each float has a capacity for sixteen cars and is moved from place to place by a steam tug lashed to its side. The wharf is approached through a slip formed by spiles driven on each side and are like ferry slips. Attached to the wharf is an adjustable bridge which rises and falls with the tide, and can be easily brought to the level of the deck of the float. Railroad tracks extend from the yards of the defendant to the wharf and across the bridge. A windlass stands on the wharf operating a hawser which has a ring on the end of it. On the bridge is stationed an employee of the railroad, whose duty it is to hand the hawser to the man standing on the bow of the incoming float, who fastens it to the hook on the float, and then, by means of the windlass, the float is brought to the end of the bridge, after which the bridgeman runs the keys forward into the toggle boxes or grooves on the deck of the float. It is necessary that the ends of the tracks on the float and of those on the bridge should be brought and kept close together and in line so that the cars may be moved to and from the floats. The tracks on the bridge and on the floats are held firmly end to end by four steel keys, which are seven feet long, about four and one-half inches square, and weigh between 100 and 800 pounds each, one being on each side of the bridge and two near the center. They are fastened permanently to the bridge, and when in use are run out about three and one-lialf feet onto the float and into toggle boxes or grooves. When the float is ready to leave the wharf, the keys should be and usually are shoved back onto the bridge, where they remain until another float comes in. It is the practice and duty of the railroad to operate the bridge and the keys.
The negligence complained of was in permitting these keys to project beyond the bridge when the float approached it. The night was dark, and there was some controversy on the trial whether the lights on the bridge and on the float were sufficient to enable the plaintiff, had he exercised due care, to see that the keys projected beyond the edge of the bridge.
It was conceded on the trial that the float on which the plaintiff was employed was lawfully at defendant’s pier at the time of the accident, and it was testified, and was not contradicted, that, cars are transported at all hours of the day and night, and that the bridges are always manned. It was not unusual for an incoming float to remove an idle float lying at the wharf and then take its place. And besides, the captain of float No. 23 was requested by defendant’s bridgeman Gould “ to pull that float out so they could get in.”
This case has been before this court on a former appeal. ( 51 N. Y. St. Repr. 291 ; 22 N. Y. Supp. 3 .) Judging from the statement ■of facts contained in the opinions delivered on the former appeal, the evidence on the first trial was quite different from that given on the second. For example, it is stated in the leading opinion ■delivered on the former appeal that, “ The Starin float having been detached from the bridge, the bridgeman took one end of the haw;ser, the other end being made fast to the float, climbed up on the south rack, walked along the rack as the float made off, and, with the assistance -of a man put on the float by the captain of the tug, secured the float at the mouth of the slip. * * *
“ Before the bridgeman had time to do this work, and return to his position upon the bridge, and before any notice was given that the slip was ready for occupancy, the New Haven float was shoved into the slip.” There is no such evidence in this record, and besides, it is testified that the bridgeman stood with the hawser in his hand ready to hand it to,the floatman when the float came within reach, and defendant’s employees had notice of the coming of the float. By this record it appears that between fifteen and twenty minutes
Dissent
The judgment should be reversed and a new trial granted, with, costs to the appellant to abide the event.
O’Brien, J., concurred.
(dissenting):
I cannot concur in the conclusion arrived at by my associates in this case. I am utterly at a loss to find in this record any evidence of negligence upon the part of the defendant. Whatever negligence there was arose from the impetuosity and undue haste of the pilot, of the boat upon which the plaintiff was employed.
It appeared from the evidence that when the float upon which, the plaintiff was employed came to the slip of the defendant, it was. already occupied by another float, and that they signaled to know whether they could come into the slip and received a reply that they could do so provided they pulled out the float then in the slip. It. further appeared that they pulled out the float, and without any invitation or notice that the pier was ready to receive them, the. pilot having charge of the float upon which the plaintiff was injured being in a hurry, drove the float into the slip, and one of the plaintiff’s feet was caught in the keys which projected from the bridge. It further appeared that this pilot knew of the existence of these keys and that they were out upon the float that was occupying the pier, and that they were required to be pulled back before he could enter the pier with safety. And yet, without any notice that they had been pulled back, or that the pier was ready, he drove his float in and the plaintiff was caught between one of these keys and the deck of the float, the only evidence being that perhaps there was time enough to have pulled in the keys. But I fail to see that there was any negligence upon the part of the employees of the defendant until he was invited to go into the slip after the other float had been removed. Instead of waiting to ascertain
In the prevailing opinion it is said: “ It seems that defendant’s ■employees had ample notice that float No. 23 was about to draw near the bridge and it was their duty to exercise due care to have it in a safe .condition to receive the float.” But where there is in this case any notice to them that this incoming float was to be driven in at once is not pointed out. The employees of the defendant had no reason to suppose that the pilot controlling the float, knowing the danger of coming in with these keys projecting, would rush his boat in, regardless of the risk, without ascertaining that the slip had been ■ma,de ready for his reception. That he was negligent ivas beyond question. Without an intimation that the bridge was ready to .shove his float in, and then because the bridge was not ready, to claim negligence upon the part of the defendant seems to be applying a very harsh rule of diligence, and such as has never heretofore been sanctioned.
The judgment should be affirmed, with costs.
Judgment reversed and new trial granted, with costs to appellant to abide event.