Majority
Headnote
Bridge over railroad tracks — consideration of its cost, involved in the decision of the question — evidence as to its practicability.This is an appeal from a judgment rendered at a trial before a judge without a jury.
The action was brought by the plaintiffs, who own a farm through which the defendant took a strip of land by condemnation for its railroad, to compel the defendant to build a crossing under its railroad for stock at one point and a bridge over its railroad for teams and stock at another, in addition to certain crossings already built by the company.
From the proofs before the court it is difficult to jierceive any necessity for a bridge over the railroad at all, and it is also very questionable whether any more cattle culverts are required for the reasonable use of the farm owned by the plaintiffs.
There is no such amount of travel over a farm crossing as to justify the great expense of building a bridge over a railroad.
It is well settled that the cost to the railroad, as compared with the benefit to the landowner, is to be taken into consideration in deciding whether a crossing shall be required. (Jones v. Seligman, 81 N. Y. 190 -196; Wademan v. A. & S. R. R. Co., 51 id. 568.)
The interest of neither party is to control, but the power to compel the building of proper crossings and cirlverts is to be exercised in a proper manner, having due regard to the convenience of the
The question is one that depends upon the facts and circumstances of each particular case, the location of the lands and the needs and necessities of the owner. While he is to be reasonably accommodated, the railroad must be justly and equitably dealt with.
What the expense would be of making the improvements demanded by the plaintiffs was a material fact which the court below refused to find. This we think was error. It was also error in refusing to find the height, details and cost of overhead bridge with approaches, and also cost and kind of under-crossing for cattle.
There are numerous exceptions remaining, but we will only notice-one other, to wit, in permitting a non-expert to answer the following question: “ Is it practicable to build a bridge there over that railroad at a reasonable expense ? ” No one but an engineer, or a man experienced in bridge building or kindred work, could intelligently answer such a question, besides the answer decided the issue in the case.
It seems to us, in view of the above reasons, and the fact that the defendant has already built three grade crossings within about a third of a mile, and that to comply with the demand of the plaintiffs will entail great expense and hardship upon the defendant, there ought to be a new trial.
Brown, P. J"., and Dykman, J., concurred.
Judgment reversed and new trial granted, costs to abide the event.
Cases cited
- Jones v. Seligman 81 N. Y. 190 p. 264