Majority — Butler J.
delivered the opinion of the Court.
September 10, 1934, the United States, acting through Harold L. Ickes, Secretary of the Interior and Federal Emergency Administrator of Public Works, caused to be commenced the construction of the Parker Dam in the main stream of the Colorado River, the thread of which for a distance of about 237 miles is the boundary between Arizona and California. The site is 150 miles below the Boulder Dam, half a mile below the place where the Williams River flows into the Colorado, and 10 miles north of the Colorado River Indian Reservation. Its ends rest on public lands of the United States in Arizona and California. Arizona objects to the construction of the dam, asserts that it may not lawfully be built without her consent, and threatens the use of military force to stop the work. January 14, 1935, the United States filed its bill in equity perpetually to enjoin interference by the State. On plaintiff’s motion this court directed defendant to show cause why a restraining order should not issue pending the final determination of the suit. Arizona filed a return consisting of an affidavit of the Governor setting forth the grounds on which the State claims the right to prevent the construction of the dam in the part of the river bed that is easterly of the thread of the stream, a motion to dismiss the bill, and a supporting brief. We heard counsel on plaintiff’s application for a temporary injunction and defendant’s motion to dismiss.
We come first to the question whether the complaint alleges facts sufficient to warrant an injunction against the State. The allegations will be better understood after brief reference to the Colorado River Compact[1] and the Boulder Canyon Project Act, 45 Stat. 1057 .
The Compact was made by California, Colorado, Nevada, New Mexico, Utah and Wyoming. Arizona was
1 Printed in California Statutes, 1929, c. 1, § 1.
2 By §§ 12 and 14 of the Boulder Canyon Project Act, the Reclamation Law is defined to mean the Act of June 17, 1902, 32 Stat. 388 , and Acts amendatory thereof and supplemental thereto, including the Boulder Canyon Project Act.
The bill alleges that February 10, 1933, the United States, acting through the Secretary of the Interior, entered into a contract with the Metropolitan Water District of Southern California. The District agrees to pay to the United States the entire cost of the dam, assumed not to exceed $13,000,000. By the use of this money the United States agrees that, under the Reclamation Act, June 17, 1902, 32 Stat. 388 , and supplemental Acts, particularly those of April 21, 1904, 33 Stat. 224 , March 4, 1921, 41 Stat. 1404 , and December 21, 1928 (The Boulder Canyon Project Act)[3] it will construct the Parker Dam. The District is to have one-half the power privilege and the right to divert specified quantities of water. The United States is to have the right to the rest of the power, to divert water, to transmit powep at cost over the District’s lines from Boulder to Parker, and, by means of canals, to connect Parker Dam with lands in the Colorado River Indian Reservation in Arizona and with other lands in that State and in California.
Parker Dam will intercept waters discharged at Boulder Dam and the inflow of tributaries of the Colorado below that dam; raise the river level 72 feet and create a reservoir about 20 miles long, having capacity of 717,000 acre feet, and permit generation of approximately 85,000 horsepower of electricity. Operated with Boulder Dam, it will
3 Other amendatory and supplemental acts are: Acts of February 25, 1905, 33 Stat. 814 ; March 3, 1905, 33 Stat. 1032 ; April 16, 1906, 34 Stat. 116 ; June 12, 1906, 34 Stat. 259 ; June 27,1906, 34 Stat. 519 ; June 11, 1910, 36 Stat. 465 ; June 25, 1910, 36 Stat. 835 ; February 21, 1911, 36 Stat. 925 ; February 24, 1911, 36 Stat. 930 ; August 13, 1914, 38 Stat. 686 ; June 12, 1917, 40 Stat. 149 ; October 2, 1917, § 10, 40 Stat. 300 ; February 25, 1920, § 35, 41 Stat. 450 ; May 20, 1920, 41 Stat. 605 ; June 10, 1920, § 17, 41 Stat. 1072 ; December 5, 1924, § 4, 43 Stat. 701 ; June 6, 1930, 46 Stat. 522 .
The bill also alleges that heavy flash floods of the Williams River are a menace to the Colorado River Indian Reservation, to United States public lands and to navigation below Parker. The dam is designed to promote reclamation of the reservation lands and of public lands of the United States. The power privilege reserved by the United States is for the purpose of pumping water for irrigation of these lands.
To disclose grounds on which the United States claims the right to construct the dam, the bill sets out that at various times Congress has made appropriations amounting in all to more than $1,359,000 for construction of irrigation and diversion works for the reservation;[4] that the above mentioned Act of April 21, 1904, authorized the Secretary of the Interior to divert the waters of the Colo
4 Act of March 2, 1867, 14 Stat. 514 , appropriated $50,000 “For expense of collecting and locating the Colorado River Indians in Arizona, on a reservation set apart for them by ” § 1, Act of March 3, 1865, 13 Stat. 559 , “ including the expense of constructing a canal for irrigating said reservation.” For completing the canal, $50,000 was appropriated by the Act of July 27, 1868, 15 Stat. 222 , and $20,000 by the Act of May 29, 1872, 17 Stat. 188 . Section 3, Act of April 4, 1910, 36 Stat. 273 , appropriated $50,000 “ For the construction of a pumping plant to be used for irrigation purposes on the Colorado River Reservation, together with the necessary canals and laterals, for the utilization of water in connection therewith, for the purpose of securing an appropriation of water for the irrigation of approximately one hundred and fifty thousand acres of land ... to be reimbursed from the sale of the surplus lands of the reservation.” To complete and maintain the work commenced by the 1910 Act, Congress has since appropriated $888,710.
1. The bill alleges that the stretch of the Colorado between Arizona and California is navigable, and the motion to dismiss is dealt with on that basis. Arizona owns the part of the river bed that is east of the thread of the stream. New Jersey v. Delaware, 291 U. S. 361 , 379 et seq. Her jurisdiction in respect of the appropriation, use and distribution of an equitable share of the waters flowing therein is unaffected by the Compact or federal reclamation law. But the title of the State is held subject to the power granted to Congress by the commerce clause, United States v. Holt State Bank, 270 U. S. 49 , 54-55, and under that clause Congress has power to cause to be built a dam across the river in aid of navigation. The Boulder Canyon Project Act is an example of the exertion of that power. Arizona v. California, supra, 451, 455-457 . But no Act of Congress specifically authorizes the construction of the Parker Dam. Subject to an exception with which we have no concern, § 9 of the Act of March 3, 1899, forbids the construction of any bridge, dam, dike or causeway over or in any port, roadstead, haven, harbor, canal, navigable river or other navigable water of the United States until the consent of Congress shall have
2. Plaintiff, unable to cite any statute specifically authorizing the Secretary to construct the dam, turns to § 25 of the Act of April 21, 1904, 33 Stat. 224 . That section is a part of the reclamation laws which are enacted — not under the commerce clause, Art. I, § 8, cl. 3, but in the exertion of power granted by Art. IV, § 3, cl. 2: “The Congress shall have Power to dispose of and make all
In support of the construction for which it contends, plaintiff asserts that it was under this Act that the Secretary of the Interior built the Laguna Dam across the
3. The clause of § 1 of the Boulder Canyon Project Act empowering the Secretary to construct a main canal connecting the Laguna Dam “or other suitable diversion dam” with the Imperial and Coachella Valleys does not authorize the building or in any respect apply to the proposed Parker Dam. The latter is about 70 miles upstream from the Laguna and the canal proposed to be built to bring water to the valleys named.[7] The contract alleged to have been made by the United States and the Metropolitan Water District, a copy of which is attached to plaintiff’s brief, shows that the purpose immediately to be served by the Parker Dam is to enable the United
5 See e. g., Acts of July 1, 1916, 39 Stat. 304 ; June 12, 1917, 40 Stat. 148 , and July 1, 1918, 40 Stat. 674 , making appropriations for the Yuma Project, Arizona-California, which includes the Laguna Dam. See e. g., Reclamation Service Report 13, p. 73, et seq.; Report 15, p. 68, et seq.
6 See Art. IV (a), Colorado River Compact.
7 Wilbur and Ely, The Hoover Dam Contracts, United States Department of the Interior, 1933, pp. II, 71, 325.
4. Parker Dam was not approved by the President as required by § 4 of the Act of June 25, 1910, 43 U. S. C., § 413. That section declares that no irrigation project contemplated by the Reclamation Act “ shall be begun unless and until the same shall have been recommended by the Secretary of the Interior and approved by the direct order of the President of the United States.” The project in question rightly may be deemed to have been begun on the date, February 10, 1933, of the contract made by the United States and the Water District for the construction of the dam. There is no .allegation that any project including the dam was ever recommended, submitted to or in any manner approved by the President. But plaintiff maintains that the approval required in the section has been given through executive action under the National Industrial Recovery Act. It relies on §§ 201 a, 202 and 203 of the Act .and Executive Order No. 6252. The first of these authorizes the President to delegate any of his powers under Title II of the Act to such agents as he may designate. Section 202 provides that the Administrator under the direction of the President shall prepare a comprehensive program of public works “ which shall include . . . construction of river and harbor improvements . . . Provided, That no river or harbor improvements shall be carried out unless they shall have heretofore
5. Plaintiff’s contention that the dam is being built under authority of the Recovery Act is without force.
The chronology just given, when taken in connection with the citations in the contract of the Acts relied on, shows the claim to be an afterthought born of the contro
8 The complaint does not show the date of the alleged inclusion of the dam in the comprehensive program of public works authorized by § 202 of the Recovery Act. It also fails to give the date of the recommendation of the Chief of Engineers and appoval by the Secretary of War. A copy of the certificate attached to the complaint furnishes that date, January 5, 1935.
9 The Rivers and Harbors Acts prior to that of September 22, 1922, authorized surveys and improvements and made appropriations. A typical provision was: “ That the following sums ... are hereby appropriated ... to be expended under the direction of the Secretary of War and the supervision of the Chief of Engineers, for the construction, completion, repair, and preservation of the public works hereinafter named. . . .” Act of August 8, 1917, 40 Stat. 250 . The Act of September 22, 1922; omitted appropriations and adopted specified improvements: “That the following works of improvement are hereby adopted and authorized, to be prosecuted under the direction of the Secretary of War and supervision of the Chief of Engineers in accordance with the plans recommended in the reports hereinafter designated. . . .” 42 Stat. 1038 . The same language is used in § 1 of the Acts of March 3, 1925, 43 Stat. 1186 ; January 21, 1927, 44 Stat. 1010 , and July 3, 1930, 46 Stat. 918 . See also 79 Cong. Rec. p. 5454.
10 “. . . The Committee on Rivers and Harbors has pursued an invariable rule of requiring all rivers and harbors projects to have the approval and recommendation of the Corps and Chief of Engineers before we considered them eligible for consideration.” Remarks oí chairman of that committee in the Committee of the Whole House *190 considering bill for river and harbor improvements, 79 Cong. Rec., p. 5441, see also pp. 5460, 5465, 5466. Cf. § 9, Act of September 22, 1922 (33 U. S. C., § 568): “ No project shall be considered by any committee of Congress with a view to its adoption, except with a view to a survey, if five years have elapsed since a report upon a survey of such project has been submitted to Congress pursuant to law.”
11 To secure greater uniformity in the recommendations and reports required of Chief of Engineers (See H. Rep. No. 795, 57th Cong., 1st session, p. 3), Congress created in his office a Board of Engineers for Rivers and Harbors, § 3, Act of June 13, 1902, 32 Stat. 372 . Subsequent legislation in respect of this Board, material here, is found in § 3, Act of June 25, 1910, 36 Stat. 668 ; §§ 3 and 4, Act of March 4, 1913, 37 Stat. 825 ; § 2, June 5, 1920, 41 Stat. 1010 ; § 9, September 22, 1922, 42 Stat. 1043 . 33 U. S. C., §§ 541, 542, 545, 546, 547, 568. Preliminary examinations are first made, unless Congress expressly directs a survey and estimate, and if, upon such examination, the improvement is not thought advisable, no further action may be taken unless Congress so directs. 33 U. S. C., § 545. The subsequent detailed survey report is made by the district engineer, it is reviewed by the division engineer, by the Board of Engineers for Rivers and Harbors and finally by the Chief of Engineers who submits to Congress a report containing information of a character specified by the above statutes, together with his recommendation. As shown in footnote 10, a congressional committee may not consider a project with a view to its adoption if five years have elapsed since submission of a report on a survey. See 79 Cong. Rec., p. 5439, et seq. 1922 Report of Chief of Engineers, pp. 99, 100.
12 Since September 22, 1922, the Acts authorizing preliminary examinations and surveys employ the following language: “The Secretary of War is hereby authorized and directed to cause preliminary examinations and surveys to be made at the following-named localities. ...” § 12, 42 Stat. 1043 .
13 That no preliminary examination, survey, project, or estimate for new works other than those designated in this or some prior Act *191 or joint resolution shaE be made.” § 12, Act of September 22, 1922, 42 Stat. 1043 . Typical language in the Acts appropriating for rivers and harbors is: “That no funds shall be expended for any preliminary examination, survey, project, or estimate not authorized by law.” It is found, for example, in the Act of AprE 26, 1934, 48 Stat. 639 -640, making appropriations for the fiscal year ending June 30, 1935.
In accordance with definite policy long pursued by it, the Congress has committed to the Secretary of War and Chief of Engineers all investigations, surveys and work in aid of navigation. The Recovery Act discloses no intention to require that the Chief of Engineers’ recommendations in respect of proposed improvements shall be made to the Administrator instead of to the Congress. The provisions of the Act brought forward by plaintiff make no such change. Plainly they are not sufficient to empower the Administrator to initiate preliminary examinations and surveys or to determine whether the Parker Dam or any work in aid of navigation shall be undertaken.
It is not shown that Congress ever directed a preliminary examination or survey by the Chief of Engineers of any project that includes this dam. This is a condition precedent to the recommendation required by the proviso. Failure to allege compliance warrants the conclusion that the recommendation relied upon lacks the support of examination and survey by army officers and review by the board of engineer officers required by law.
6. As the complaint fails to show that the construction of the dam is authorized, there is no ground for the granting of an injunction against the State, and therefore the complaint must be
Dismissed.
14 When the Recovery Act was enacted, Congress had before it the report of the Chief of Engineers for the fiscal year ended June 30, 1932. This report disclosed (p. 3) that 954 projects authorized by Congress were in force, that active operations were in progress upon 361 (p. 4), that reports on 242 preliminary examinations and surveys had been transmitted to Congress during the past fiscal year (p. 6), and that the Chief of Engineers had under consideration 302 investigations authorized by river and harbor and flood control acts. (P. 22.)
Cases cited
- Arizona v. California 283 U. S. 423 p. 181, p. 183, p. 185, p. 188
- New Jersey v. Delaware 291 U. S. 361 p. 183
- United States v. Holt State Bank 270 U. S. 49 p. 183
- Donnelley v. United States 276 U. S. 505 p. 184
- Kansas v. Colorado 206 U. S. 46 p. 185, p. 186
- Wisconsin v. Duluth 96 U. S. 379 p. 186
- United States v. Jefferson Electric Manufacturing Co. 291 U. S. 386 p. 191