Majority — Ginsburg J.
delivered the opinion of the Court.
“It is most true that this Court will not take jurisdiction if it should not,” Chief Justice Marshall famously wrote, “but it is equally true, that it must take jurisdiction if it should.... We have no more right to decline the exercise of jurisdiction which is given, than to usurp that which is not given.” Cohens v. Virginia, 6 Wheat. 264 , 404 (1821); see Marshall v. Marshall, 547 U. S. 293 , 298-299 (2006). While Chief Justice Marshall’s statement bears “fine tuning,” there is surely a starting presumption that when jurisdiction is conferred, a court may not decline to exercise it. See R. Fallon, J. Manning, D. Meltzer, & D. Shapiro, Hart & Wechsler’s The Federal Courts and the Federal System 1061-1062 (6th ed. 2009). The general rule applicable to courts also holds for administrative agencies directed by Congress to adjudicate particular controversies.
Congress vested in the National Railroad Adjustment Board (hereinafter NRAB or Board) jurisdiction to adjudicate grievances of railroad employees that remain unsettled after pursuit of internal procedures. 45 U. S. C. § 153 First (h), (i). We consider in this case five nearly identical decisions of a panel of the NRAB dismissing employee claims “for lack of jurisdiction.” NRAB First Div. Award No. 26089 etc. (Mar. 15,2005), App. to Pet. for Cert. 65a-107a, 69a (hereinafter Panel Decision). In each case, the panel declared that a procedural rule raised by a panel member, unprompted by the parties, was “jurisdictional” in character and therefore commanded threshold dismissal.
The panel’s characterization, we hold, was misconceived. Congress authorized the Board to prescribe rules for the presentation and processing of claims, §153 First (v), but Congress alone controls the Board’s jurisdiction. By presuming authority to declare procedural rules “jurisdictional,” the panel failed “to conform, or confine itself, to matters [Congress placed] within the scope of [NRAB] jurisdiction,” §153 First (q). Because the panel was not
I
A
Concerned that labor disputes would lead to strikes bringing railroads to a halt, Congress enacted the Railway Labor Act (RLA or Act), 44 Stat. 577 , as amended, 45 U. S. C. § 151 et seq., in 1926 to promote peaceful and efficient resolution of those disputes. See Union Pacific R. Co. v. Price, 360 U. S. 601 , 609 (1959); § 151a. The Act instructs labor and industry “to exert every reasonable effort to make and maintain agreements concerning rates of pay, rules, and working conditions, and to settle all disputes, whether arising out of the application of such agreements or otherwise, in order to avoid any interruption to commerce or to the operation of any carrier .. ..” § 152 First; see Trainmen v. Jacksonville Terminal Co., 394 U. S. 369 , 377-378 (1969) (describing obligation to pursue agreement as the “heart of the [RLA]”). As part of its endeavor, Congress provided a framework for the settlement and voluntary arbitration of “minor disputes.” See Price, 360 U. S., at 609-610 . (In the railroad industry, the term “minor disputes” means, primarily, “grievances arising from the application of collective bargaining agreements to particular situations.” Id., at 609 .)[1]
Many railroads, however, resisted voluntary arbitration. See id., at 610 . Congress therefore amended the Act in 1934 (1934 Amendment) to mandate arbitration of minor disputes; under the altered scheme, arbitration occurs before panels
1 In contrast to minor disputes, which assume “the existence of a collective agreement,” major disputes are those “over the formation of collective agreements or efforts to secure them... . They look to the acquisition of rights for the future, not to assertion of rights claimed to have vested in the past.” Elgin, J.& E. R. Co. v. Burley, 325 U. S. 711 , 723 (1945).
In keeping with Congress’ aim to promote peaceful settlement of minor disputes, the RLA requires employees and carriers, before resorting to arbitration, to exhaust the grievance procedures specified in the collective-bargaining agreement (hereinafter CBA). See 45 U. S. C. § 153 First (i). This stage of the dispute-resolution process is known as “on-property” proceedings. As a final prearbitration step, the Act directs parties to attempt settlement “in conference” between designated representatives of the carrier and the grievant-employee. § 152 Second, Sixth.[3] The
2 The RLA divides the NRAB into four divisions, each covering specified classes of railroad employees. § 153 First (h).
3 Central to the instant controversy, § 152 Second, Sixth read, in full: “Second. Consideration of disputes by representatives. “All disputes between a carrier or carriers and its or their employees shall be considered, and, if possible, decided, with all expedition, in conference between representatives designated and authorized so to confer, respectively, by the carrier or carriers and by the employees thereof interested in the dispute.” “Sixth. Conference of representatives; time; place; private agreements. “In case of a dispute between a carrier or carriers and its or their employees, arising out of grievances or out of the interpretation or application of agreements concerning rates of pay, rules, or working conditions, it shall be the duty of the designated representative or representatives of *74 such carrier or carriers and of such employees, within ten days after the receipt of notice of a desire on the part of either party to confer in respect to such dispute, to specify a time and place at which such conference shall be held: Provided, (1) That the place so specified shall be situated upon the line of the carrier involved or as otherwise mutually agreed upon; and (2) that the time so specified shall allow the designated conferees reasonable opportunity to reach such place of conference, but shall not exceed twenty days from the receipt of such notice: And provided further, That nothing in this chapter shall be construed to supersede the provisions of any agreement (as to conferences) then in effect between the parties.”
If the parties fail to achieve resolution “in the usual manner up to and including the chief operating officer of the carrier designated to handle [minor] disputes,” either party may refer the matter to the NRAB. §153 First (i). Submissions to the Board must include “a full statement of the facts and all supporting data bearing upon the disputes.” Ibid.; see 29 CFR § 301.5 (d), (e) (submissions “must clearly and briefly set forth all relevant, argumentative facts, including all documentary evidence”). Arbitration is launched when the party referring the dispute files a notice of intent with the NRAB; after Board acknowledgment of the notice, the parties have 75 days to file simultaneous submissions. NRAB, Uniform Rules of Procedure (rev. June 23, 2003).
In creating the scheme of mandatory arbitration superintended by the NRAB, the 1934 Amendment largely “foreclose[d] litigation” over minor disputes. Price, 360 U. S., at 616 ; see Railway Conductors v. Pitney, 326 U. S. 561 , 566 (1946) (“Not only has Congress . . . designated an agency peculiarly competent to handle [minor disputes], but ... it also intended to leave a minimum responsibility to the courts.”). Congress did provide that an employee who ob-
In 1966, Congress again amended the scheme, this time to state grounds on which both employees and railroads could seek judicial review of NRAB orders. The governing provision, still in force, allows parties aggrieved by an NRAB panel order to petition for court review. 45 U. S. C. § 153 First (q) (2006 ed.). The provision instructs that
“[o]n such review, the findings and order of the division shall be conclusive on the parties, except that the order . . . may be set aside, in whole or in part, or remanded ... , for failure of the division to comply with the requirements of [the RLA], for failure of the order to conform, or confine itself, to matters within the scope of the division’s jurisdiction, or for fraud or corruption by a member of the division making the order.”
Courts of Appeals have divided on whether this provision precludes judicial review of NRAB proceedings for due process violations. Compare, e. g., Shafii v. PLC British Airways, 22 F. 3d 59 , 64 (CA2 1994) (review available), and Edelman v. Western Airlines, Inc., 892 F. 2d 839 , 847 (CA9 1989) (same), with Kinross v. Utah R. Co., 362 F. 3d 658 , 662 (CA10 2004) (review precluded).[4]
4 The disagreement stems from this Court’s per curiam opinion in Union Pacific R. Co. v. Sheehan, 439 U. S. 89 (1978). That case involved an NRAB decision turning on a time limitation contained in the governing CBA. Based on that limitation, the Board dismissed an employee’s claim. The Tenth Circuit remanded the case to the NRAB on the ground that the Board had failed to consider the employee’s equitable tolling argument *76 and thereby violated due process. We summarily reversed, observing that the Board had in fact considered the plea for equitable tolling and explicitly rejected it. Id., at 92 . We added that if the Court of Appeals “intended to reverse the [NRAB’s] rejection of [the employee’s] equitable tolling argument,” then the court had exceeded the bounds § 153 First (q) placed on its review authority. Id., at 93 . In determining whether the CBA’s time limitation was tolled, we said, the Board “certainly was acting within its jurisdiction and in conformity with ... the Act.” Ibid.
The instant matter arose when petitioner Union Pacific Railroad Co. (hereinafter Carrier) charged five of its employees with disciplinary violations. Their union, the Brotherhood of Locomotive Engineers and Trainmen (hereinafter Union), initiated grievance proceedings pursuant to the CBA. The Union asserts that, following exhaustion of grievance proceedings, the parties conferenced all the disputes; counsel for the Carrier conceded at argument that at least two of the disputes were conferenced, Tr. of Oral Arg. 7. Dissatisfied with the outcome of the on-property proceedings, the Union sought arbitration before the First Division of the NRAB. The Union and the Carrier, from early 2002 through 2003, filed simultaneous submissions in the five cases. In each submission, the Union included the notice of discipline (or discharge), the hearing transcript, and all exhibits and evidence relating to the underlying adverse actions used in the grievance proceeding. Neither party mentioned conferencing as a disputed matter. Yet, in each ease, both parties necessarily knew whether the Union and the Carrier had conferred, and the Board’s governing rule instructs carriers and employees to “set forth all relevant, argumentative facts,” 29 CFR § 301.5 (d), (e).
On March 18, 2004, just prior to the hearing on the employees' claims, one of the industry representatives on the arbitration panel raised an objection. Petition to Review and Vacate Awards and Orders of First Div. NRAB in No. 05-civ-2401 (ND Ill.), ¶ 20 (hereinafter Pet. to Review).
On March 15, 2005, nearly one year after the question of conferencing first arose, the panel, in five identical decisions, dismissed the petitions for want of “authority to assume jurisdiction over the claim[s].” Panel Decision 72a. Citing Circular One, see supra, at 73, and “the weight of arbitral precedent,” the panel stated that “the evidentiary record” must be deemed “closed once a Notice of Intent has been filed with the NRAB . . . .” Panel Decision 71a.[5] In explaining why the record could not be supplemented to meet the no-proof-of-eonferencing objection, the panel emphasized that it was “an appellate tribunal, as opposed to one which is empowered to consider and rule on de novo evidence and arguments.” Id., at 69a.
The two labor representatives dissented. The Carrier’s submissions, they reasoned, took no exception based on failure to conference or to prove conferencing; therefore, they concluded, under a “well settled principle governing the
5 The panel observed, however, that the records and notes offered by the Union, “on their face, may be regarded as supportive of its position that the conference^] occurred.” Panel Decision 69a.
The Union filed a petition for review in the United States District Court for the Northern District of Illinois, asking the court to set aside the Board’s orders on the ground that the panel had “unlawfully held [it lacked] authority to assume jurisdiction over [the] cases [absent] evidence of a ‘conference’ between the parties in the ... ‘on-property’ record.” Pet. to Review ¶ 1. Nothing in the Act or the NRAB’s procedural rules, the Union maintained, mandated dismissal for failure to allege and prove conferencing in the Union’s original submission. Id., ¶¶3, 4. By imposing, without warrant, “a technical pleading or evidentiary requirement” and elevating it to jurisdictional status, the Union charged, the panel had “egregiously violate[d] the Act,” id., ¶3, or “fail[ed] to conform its jurisdiction to that required by . . . law,” id., ¶4. Alternatively, the Union asserted that the panel violated procedural due process by entertaining the Carrier’s untimely objection, even though “the Carrier had failed to raise any objection as to lack of conferencing” in its submissions. Id., ¶ 5.
The District Court affirmed the Board’s orders. Addressing the Union’s argument that the no-proof-of-conferencing issue was untimely raised, the court accepted the panel’s description of the issue as “jurisdictional,” and noted the familiar proposition that jurisdictional challenges may be raised at any stage of the proceedings. 432 F. Supp. 2d 768 , 777, and n. 7 (2006).
On appeal, the Seventh Circuit recognized that the Union had presented its case “through both a statutory and consti
II
We granted the Carrier’s petition for certiorari, 555 U. S. 1169 (2009), which asked us to determine whether a reviewing court may set aside NRAB orders for failure to comply with due process notwithstanding the limited grounds for review specified in § 153 First (q).[6] As earlier recounted, Courts of Appeals have divided on this issue. See supra, at 75, and n. 4. Appearing as respondent in this Court, however, the Union urged affirmance of the Seventh Circuit’s judgment on an alternative ground. Reasserting the lead argument it had advanced in its petition for court review, see supra, at 78, the Union maintained that the Board did not “conform, or confine itself, to matters within the scope of [its] jurisdiction,” § 153 First (q). Brief for Respondent 52-53. In response, the Carrier stated that the Union’s alternative ground “presents a pure question of law that th[e] Court can and should resolve without need for remand.” Reply Brief 24, n. 9. We agree.
6 Quoted supra, at 75, those grounds are “failure of the division to comply with [RLA] requirements,” “failure of the order to conform, or confine itself, to matters within the scope of the division’s jurisdiction,” and “fraud or corruption by a member of the division making the order.”
The Seventh Circuit, we agree, asked the right question, but inappropriately placed its answer under a constitutional, rather than a statutory, headline. As the Court of Appeals determined, and as we discuss infra, at 81-86, nothing in the Act elevates to jurisdictional status the obligation to conference minor disputes or to prove conferencing. That being so, the “unavoidable” conclusion, following from the Seventh Circuit’s “answer [to] the key question,” 522 F. 3d, at 750 , is that the panel, in § 153 First (q)’s words, failed “to conform, or confine itself, to matters within the scope of [its] jurisdiction.” The Carrier, although it sought a different outcome, was quite right to “urg[e] [the Court of Appeals] to consider the statutory claim before the constitutional one.” 522 F. 3d, at 750 .
In short, a negative answer to the “single question” identified by the Court of Appeals leaves no doubt about the Union’s entitlement, in accord with §153 First (q), to vacation of the Board’s orders. Given this statutory ground for relief, there is no due process issue alive in this case, and
III
A
Recognizing that the word “jurisdiction” has been used by courts, including this Court, to convey “many, too many, meanings,” Steel Co. v. Citizens for Better Environment, 523 U. S. 83 , 90 (1998) (internal quotation marks omitted), we have cautioned, in recent decisions, against profligate use of the term. Not all mandatory “prescriptions, however emphatic, are . .. properly typed jurisdictional,” we explained in Arbaugh v. Y & H Corp., 546 U. S. 500 , 510 (2006) (internal quotation marks omitted). Subject-matter jurisdiction properly comprehended, we emphasized, refers to a tribunal’s “power to hear a case,” a matter that “can never be forfeited or waived.” Id., at 514 (quoting United States v. Cotton, 535 U. S. 625 , 630 (2002)). In contrast, a “claim-processing rule,... even if unalterable on a party’s application,” does not reduce the adjudicatory domain of a tribunal and is ordinarily “forfeited if the party asserting the rule
7 A case of that order would be uncommon. As the Carrier acknowledges, “many of the cases reviewing ostensibly extra-statutory due process objections could have been accommodated within the statutory framework.” Brief for Petitioner 86. See also id., at 37 (“The statutory review provisions are plainly generous enough to permit litigants to raise all of the simple, common, easily adjudicated, and likely to be meritorious claims that sail under the flag of due process of law ... .”).
For example, we have held nonjurisdietional and forfeit-able the provision in Title VII of the Civil Rights Act of 1964, 42 U. S. C. § 2000e et seq., requiring complainants to file a timely charge of discrimination with the Equal Employment Opportunity Commission (EEOC) before proceeding to court. Zipes v. Trans World Airlines, Inc., 455 U. S. 385 , 393 (1982). We have also held nonjurisdietional and forfeit-able the Title VII provision exempting employers who engage fewer than 15 employees. Arbaugh, 546 U. S., at 503, 515-516 . And we have determined that a Chapter 7 trustee’s (or creditor’s) limited time to object to the debtor’s discharge, see Fed. Rule Bkrtcy. Proc. 4004, is a claim-processing, not a jurisdictional, matter. Kontrick, 540 U. S., at 446-447, 460 . In contrast, relying on a long line of this Court’s decisions left undisturbed by Congress, we have reaffirmed the jurisdictional character of the time limitation for filing a notice of appeal stated in 28 U. S. C. § 2107 (a). Bowles v. Russell, 551 U. S. 205 , 209-211 (2007). See also John R. Sand & Gravel Co. v. United States, 552 U. S. 130 , 132 (2008) (court must consider sua sponte timeliness of lawsuit filed against the United States in the Court of Federal Claims).
With these decisions in mind, we turn back to the requirement that parties to minor disputes, as a last chance prearbitration, attempt settlement “in conference,” 45 U. S. C. § 152 Second, Sixth. See supra, at 73-74, and n. 3. This obligation is imposed on carriers and grievants alike but, we hold, its satisfaction does not condition the adjudicatory authority of the Board.
The Board’s jurisdiction extends to “all disputes between carriers and their employees 'growing out of grievances or out of the interpretation or application of agreements concerning rates of pay, rules, or working conditions ....’”
The additional requirement of a conference, we note, is independent of the CBA process. Rather, the conference requirement is stated in the “[g]eneral duties” section of the RLA, § 152, a section that is not moored to the “[e]stablishment[,] . .. powers[,] and duties” of the NRAB set out next in § 153 First. Rooted in § 152 and often informal in practice, see supra, at 73-74, conferencing is surely no more “jurisdictional” than is the presuit resort to the EEOC held forfeitable in Zipes, 455 U. S., at 393 .[8] And if the requirement to conference is not “jurisdictional,” then failure initially to submit proof of conferencing cannot be of that genre. See Part III-B, infra.
In defense of the Board’s characterization of conferencing and proof thereof as jurisdictional, the Carrier points to the NRAB’s Circular One procedural regulations, see supra, at 73, which provide: “No petition shall be considered by any division of the Board unless the subject matter has been handled in accordance with the provisions of the [RLA].” 29 CFR § 301.2 (b). But that provision, as other prescriptions in Circular One, is a claim-processing rule. Congress gave
8 The RLA states, in §152 First, a general duty “to settle all disputes,” and, in § 152 Second, a more specific duty to “conference.” These provisions apply to all disputes in the railroad industry, major as well as minor. They also apply to disputes in the airline industry, over which the NRAB has no jurisdiction. § 181. Neither provision “speak[s] in jurisdictional terms or refer[s] in any way to the jurisdiction of the” NRAB. Zipes v. Trans World Airlines, Inc., 455 U. S. 385 , 394 (1982).
The Carrier cites NRAB decisions that allegedly support characterization of conferencing as jurisdictional. If the NRAB lacks authority to define the jurisdiction of its panels, however, surely the panels themselves lack that authority. Furthermore, NRAB panels have variously addressed the matter. For example, in NRAB Third Div. Award No.. 15880 (Oct. 26, 1967), the panel, although characterizing the conferencing requirement as “jurisdictional,” said that “[i]f one of the parties refuses or fails to avail itself of a conference where there is an opportunity to do so, it cannot then assert the defense of a lack of jurisdiction.” Id., at 2 . See also NRAB Fourth Div. Award No. 5074 (June 21, 2001) (same); NRAB Third Div. Award No. 28147 (Oct. 16, 1989) (same). Cf. Arbaugh, 546 U. S., at 511 (“unrefined” uses of the word “jurisdiction” are entitled to “no precedential effect” (internal quotation marks omitted)). And in NRAB First Div. Award No. 23867, p. 5 (Apr. 7, 1988), the panel observed that the ordinary remedy for lack of conferencing is to “dismiss th[e] claim without prejudice to allow Claimant to cure the jurisdictional defect.” That panel reached the merits nevertheless. Ibid. Cf. Steel Co., 523 U. S., at 94 (“Jurisdiction is power to declare the law, and when it ceases to exist, the only function remaining to the [tribunal] is that of announcing the fact and dismissing the cause.” (quoting Ex parte McCardle, 7 Wall. 506 , 514 (1869))). We note, in addition, the acknowledgment of the Carrier’s counsel that, if confer
B
The RLA provides that, when on-property proceedings do not yield settlement, both parties or either party may refer the case to the Board “with a full statement of the facts and all supporting data bearing upon the disputes.” § 153 First (i). Circular One correspondingly instructs employees . seeking Board adjudication “[to] set forth all relevant, argumentative facts” and “affirmatively show the same to have been presented to the carrier and made a part of the particular question in dispute.” 29 CFR § 301.5 (d); see § 301.5(e) (similar instruction addressed to carriers). Conferencing, the Carrier urged, is a “relevant, argumentative fae[t],” so proof thereof must accompany party submissions.
As earlier explained, see supra, at 83-84, instructions on party submissions — essentially pleading instructions — are claim-processing, not jurisdictional, rules. Moreover, the Board itself has recognized that conferencing may not be a “question in dispute.” It has counseled parties submitting joint exhibits “to omit documents that are unimportant and/or irrelevant to the disposition of the [case]; for example .. . letters requesting a conference (assuming that is not an issue in the dispute).” NRAB Instructions Sheet, Joint Exh. Program, p. 5 (July 1, 2003), online at http://www. nmb.gov/arbitration/nrab-instruc.pdf (as visited Dec. 3, 2009,
9 While holding that the panel did not lack jurisdiction over the employees’ claims, we recognize the Board’s authority to adopt claim-processing rules backed by effective sanctions. See supra, at 73; cf. Fed. Rule Civ. Proc. 37(b)(2) (specifying sanctions, including dismissal, for failure to comply with discovery orders); Rule 41(b) (authorizing involuntary dismissal for failure to prosecute or to comply with rules of procedure or court orders). We also recognize that NRAB panels, in managing individual arbitrations, may prescribe and enforce reasonable procedural requirements.
It makes sense to exclude at the arbitration stage newly-presented “data ... in support of [the] employeef’s] [grievance],” 29 CFR § 301.5 (d) — evidence the carrier had no opportunity to consider prearbitration. A contrary rule would sandbag the carrier. But conferencing is not a fact bearing on the merits of a grievance. Indeed, there may be no disagreement at all about the occurrence of conferencing, as the Union believed to be the ease here. Moreover, the RLA respects the right of the parties to order for themselves the conference procedures they will follow. See 45 U. S. C. § 152 Sixth (“[N]othing in this chapter shall be construed to supersede the provisions of any agreement (as to conferences)... in effect between the parties.”). In sum, neither the RLA nor Circular One could plausibly be read to require, as a prerequisite to the NRAB’s exercise of jurisdiction, submission of proof of conferencing.
* * *
By refusing to adjudicate eases on the false premise that it lacked power to hear them, the NRAB panel failed “to conform, or confine itself,” to the jurisdiction Congress gave it. We therefore affirm the judgment of the Court of Appeals for the Seventh Circuit.
It is so ordered.
Cases cited
- Cohens v. Virginia 6 Wheat. 264 p. 70
- Marshall v. Marshall 547 U. S. 293 p. 70
- Union Pacific Railroad v. Price 360 U. S. 601 at 609-610, at 609, at 610, at 610-613, at 616 p. 72, p. 73, p. 74, p. 75
- Brotherhood of Railroad Trainmen v. Jacksonville Terminal Co. 394 U. S. 369 p. 72, p. 73, p. 76, p. 77, p. 78
- Brotherhood of Railroad Trainmen v. Chicago River & Indiana Railroad 353 U. S. 30 p. 73, p. 74
- Order of Railway Conductors of America v. Pitney 326 U. S. 561 p. 74
- 241 F. 2d 541 241 F. 2d 541 p. 75
- 245 F. 2d 579 245 F. 2d 579 p. 75
- 22 F. 3d 59 22 F. 3d 59 p. 75
- 892 F. 2d 839 892 F. 2d 839 p. 75
- 362 F. 3d 658 362 F. 3d 658 p. 75
- 432 F. Supp. 2d 768 432 F. Supp. 2d 768 p. 78
- 522 F. 3d 746 522 F. 3d 746 at 757-758, at 750 p. 79
- 555 U. S. 1169 555 U. S. 1169 p. 79
- Blum v. Bacon 457 U. S. 132 p. 80
- Steel Co. v. Citizens for a Better Environment 523 U. S. 83 at 94 p. 81, p. 84
- Arbaugh v. Y & H Corp. 546 U. S. 500 at 514, at 503, at 511 p. 81, p. 82, p. 84
- United States v. Cotton 535 U. S. 625 p. 81
- Kontrick v. Ryan 540 U. S. 443 at 446-447 p. 82
- Zipes v. Trans World Airlines, Inc. 455 U. S. 385 at 393 p. 82, p. 83
- Bowles v. Russell 551 U. S. 205 p. 82
- John R. Sand & Gravel Co. v. United States 552 U. S. 130 p. 82
- Slocum v. Delaware, Lackawanna & Western Railroad 339 U. S. 239 p. 83
- Ex parte McCardle 7 Wall. 506 p. 84