Majority — FIELD J.
Syllabus
1. The law does not require a party to pay for imperfect and defective work the price stipulated for a perfect structure; and when that price is demanded, will allow him to deduct the difference between that price and the value of the inferior work, and also the amount of any direct damages flowing from existing defects, not exceeding the demand of the plaintiffs. The deduction is allowed in a suit upon the contract to prevent circuity of action.after stating the case, delivered the opinion of the court, as follows:
The interrogatories to the witness Meador, the answers to which were excluded, inquired whether the structure and arrangements of the bridge caused any injury or damage, hindrance or delay, to the company iu the running of its railroad, and whether any hindrance or delay was caused by the imperfect construction of the bridge to any vessel in the navigation of the river, and whether the structure or working of the bridge rendered it liable to be injured or destroyed by vessels navigating the river, and what number of hands were required to work the drawbridge, and what number would be necessary if it had been properly constructed.
The exclusion of these interrogatories and the answers to them constitutes the first error assigned for a reversal of the judgment. The objection to them was that they related to speculative damages. This objection cannot apply to two of the inquiries, the first and the last stated. The damages sustained by the company by any detention of its cars from the imperfect working of the bridge would be the subject of actual estimation; and the same thing may be said when the difference was ascertained between the number of hands required to work the bridge and the number necessary if it had been properly constructed. The facts the inquiries sought to elicit would at least have furnished elements to the jury for a just estimate of the damages to be recouped from the demand of the plaintiffs. All damages directly
But the defendant also offered to prove by experts, among other things, that the plan of the machinery and the machinery itself on which the bridge rested and swings, ivas so defective and so unskilfully put up, and the turning-gear itself was so defective and unskilfully attached that it took eight or ten men to swung the bridge, aud that the bridge had to be swung twice a week on an average at a cost of fifteen dollars each time; aud that under a contract- to build such a drawbridge as is specified in the contract between the parties, it is the common understanding among persons skilled in bridge building that the bridge should be so constructed as to be easily turned in two or three minutes by one man; aud also, that the quality of the material of the bridge, both wood aud iron, was bad, and was put together in an unworkmanlike manner. The Circuit Court held that the proof thus offered was inadmissible and irrelevant, and in this ruling there was manifest error. It in fact denied the right of the defendant to set up any damages sustained by way of recoupment. Whereas, that right exists in all cases where an action is brought upon a building contract, which imposes mutual duties and obligations, aud there has been a breach of its terms, either in the manner or time of execution, on the part of the plaintiffs, for which a cross-action might be maintained by the defendants.
The counsel of the plaintiffs seek to avoid the error of this ruling by insisting, that the imperfect working of the bridge was owing to a defect in the pier aud not to any defect in the bridge, and that it was the duty of the defendant to put the pier in proper order to receive the bridge. The court beiow took this view of the duty of the defendant, and instructed the jury in substance, that for any defects in the pier the defendant was alone chargeable, and that if the difficulty in turning the bridge arose from a defect in the pier and not
* 2 Wallace, 7.
Other exceptions were taken to the rulings of the court, but as we have noticed those that went to the substance of the defence and the attempted answer to it, it is unnecessary to consider the case further.
Judgment reversed, and the cause
Remanded for a new trial.