Versions of s. 127(9), definition “flow through critical mineral mining expenditure”, para (b)(ii)(A)
-
trenching, if one of the purposes of the trenching is to carry out preliminary sampling (other than specified sampling),
trenching, if one of the purposes of the trenching is to carry out preliminary sampling (other than specified sampling),